My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2017 2018-09-05
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2017 2018-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2018 3:40:41 PM
Creation date
9/5/2018 2:48:50 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Permit
PW1702-029
PW1704-009
Year
2017
Notes
LOTS 2 AND 4 STORMWATER POLLUTION PREVENTION PLAN PHASE 1 AND 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1.2 Proposed Construction Activities <br /> Description of site development(example: subdivision): <br /> Light Industrial and Commercial <br /> Description of construction activities (example: site preparation, demolition, excavation): <br /> This project proposes the construction of two light industrial multi use buildings on a cleared lot <br /> in the Riverside Industrial District. Proposed improvements also include the installation of a <br /> storm drainage system with treatment facilities to senre the development. For Phase 1, all <br /> construction activities will remain outside the 200ft shoreline buffer shown on the TESC plans. <br /> Construction activities will include site preparation, TESC installation, excavation for utilities and <br /> foundations, grading, utility installation, asphalt paving, concrete pours, and landscaping. <br /> Description of site drainage including flow from and onto adjacent properties. Must be consistent <br /> � with Site Map in Appendix A: <br /> The site is entirely vacant of existing structures and significant vegetation. The existing grade of <br /> the site is about 10' higher than the adjacent properties, as a result flow onto the site is <br /> negligible. Flow from the site will be discharged after treatment into the Snohomish River. <br /> Description of final stabilization (example: extent of revegetation, paving, landscaping): <br /> In final conditions the developed site will be fully stabilized with paving of access drives and <br /> onsite parking, onsite landscaping will be seeded and planted to comply with City of Everett <br /> guidelines. Storm drainage is designed to convey the 100 year rainfall event and to treat runoff <br /> per the Snohomish county and the city of Everett drainage guidelines and will discharge into the <br /> Snohomish River. <br /> Contaminated Site Information: <br /> Proposed activities regarding contaminated soils or groundwater(example: on-site treatment <br /> system, authorized sanitary sewer discharge): <br /> None <br /> Fage � 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.