My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
415 RIVERSIDE RD 2017 2018-09-05
>
Address Records
>
RIVERSIDE RD
>
415
>
415 RIVERSIDE RD 2017 2018-09-05
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/5/2018 3:40:41 PM
Creation date
9/5/2018 2:48:50 PM
Metadata
Fields
Template:
Address Document
Street Name
RIVERSIDE RD
Street Number
415
Permit
PW1702-029
PW1704-009
Year
2017
Notes
LOTS 2 AND 4 STORMWATER POLLUTION PREVENTION PLAN PHASE 1 AND 2
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
474
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.1.2 Element 2: Establish Construction Access <br /> Construction access or activities occurring on unpaved areas shall be minimized, yet where <br /> necessary, access points shall be stabilized to minimize the tracking of sediment onto public <br /> roads. Construction vehicle access and exit shall be limited to one route, if possible. Wheel <br /> washing, street sweeping, and street cleaning may be necessary if the stabilized construction <br /> access is not effective. All wash wastewater shall be controlled on site and cannot be <br /> discharged into waters of the State. If sediment is tracked off site, roads shall be cleaned <br /> thoroughly at the end of each day, or more frequently during wet weather. Sediment shall be <br /> removed from roads by shoveling or pickup sweeping and shall be transported to a controlled <br /> sediment disposal area. <br /> Applicable BMPs: <br /> • BMP C105: Stabilized Construction Entrance/Exit <br /> • BMP C106: Wheel Wash <br /> • BMP C107: Construction Road/parking Area Stabilization. <br /> Installation Schedules: Start of project and replaced as needed and at start of wet season. <br /> Inspection and Maintenance plan: Responsible staff to make weekly site walks and inspection to <br /> identify deficiencies in onsite BMPs and anticipate potential problems and remedies. <br /> Responsible Staff: Identified Certified Erosion and Sediment Control Lead in Section 3 of this <br /> SWPPP. <br /> Page � 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.