Laserfiche WebLink
F <br /> INSPECTION REPORT <br /> _ Date LQ l2g//S Permit:E/eo&-/e , <br /> Aiiiii‘v .. <br /> Contractor: bO -e_k EleG7'11 <br /> GOwner: Hef'1l'li/ Satel 1< <br /> Site Address: 21,15 gi'OGGGI GUCCI <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ElSlab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> IIIRough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> ❑ Ming Grid ❑Drywall Nailing ❑Plumbing Final <br /> ze <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> S TE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid El Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas" Pipe Final ❑HWT Final <br /> O ER OR CONSULTATION: 2c9L9-22W,4i23 /L2erei <br /> PPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PE'MIT <br /> OK FOR T.C.O. ❑ CORRECTION REQUESTED <br /> ❑ OK FOR C.O. ❑ VIOLATION '• <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION–24 hour notice required <br /> (,C f–A t c------A—C____ <br /> Inspector:__74;‘ Date: / 2'7 <br /> EIR(10/06) DATABAR,INC. <br />