Laserfiche WebLink
INSPECTION REPORT <br /> 4//.,,..1,,._ <br /> Date <br /> ,, ,./)6 Permit: �/ >�z' ` <br /> 4w <br /> C ntractor: C-/ fl2 / SI- <br /> j ( -- l ner: c�,e/)' j <br /> Site Address: �6 S L 57 76 .......... <br /> 0-.:0% y - <br /> TYPE OF INSPECTION REQUESTED <br /> E - A L BUILDING MECHANICAL PLUMBING <br /> -•Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing ❑Rooftop Units ❑Water Service <br /> ❑Grounding ❑Insulation ❑Mechanical Final ❑Medical Gas <br /> Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final ❑Gas Pipe Final ❑HWT Final <br /> OTHER OR CONSULTATION: <br /> ❑ APPROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ OK FOR T.C.O. `CORRECTION REQUESTED <br /> EI OK FOR C.O. ❑ IOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> /- abut C� 00 G8 hh c_ei-- <br /> 6 <br /> Inspector: Date: �� <br /> EIR(10/06) DATABAR,INC. <br />