My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3003 W CASINO RD BLDG 40-56 2018-09-19
>
Address Records
>
W CASINO RD
>
3003
>
BLDG 40-56
>
3003 W CASINO RD BLDG 40-56 2018-09-19
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2018 3:27:21 PM
Creation date
9/7/2018 8:57:44 AM
Metadata
Fields
Template:
Address Document
Street Name
W CASINO RD
Street Number
3003
Tenant Name
BLDG 40-56
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
a <br /> m :MOTTO ROSENM 8t ASSOrIATES INC. <br /> Geotechnical Engineering, Construct on Inspection & Materials Testing <br /> 6747 M. L. King Way South, Seattle,VVashington 98118-3216 USA <br /> „„,,,K Tel: (206)725-4600 s Toll Free: (868)OTTO-4-US a Fax: (206) 723-2221 <br /> wBE w2F5913 684=WABO Registered Aoency Website:www.ottorosenau.com <br /> September 16, 2015 <br /> FINAL <br /> City of Everett Planning &Community Development <br /> 2930 Wetmore Avenue, Suite 8A <br /> Everett, WA 98201 <br /> Project: Boeing—Bldg.40-56 IRC Consolidation Permit Number: B1505-069 <br /> Address: Bldg.40-56 WBS 2.2.3.3.2 HD Vacuum Pump Room, Everett Job Number: 15-0426 <br /> We state that excluding the non-conforming report referenced below, the work for the loading dock and canopy <br /> requiring special inspection was, to the best of our knowledge, in conformance with the approved plans and <br /> specifications and the applicable workmanship provision of the building code. Our knowledge is limited to our <br /> reports. <br /> All reports appear to be complete.This report should not be considered as a warranty for conditions and/or details <br /> of the building. <br /> Items inspected are: <br /> 1. Epoxy grouting(rebar dowels) <br /> 2. Reinforced concrete <br /> 3. Structural steel erection <br /> 4. Grout under columns <br /> Non-conformance: On August 26, 2015, a final visual inspection was performed post welding operations on <br /> complete joint penetration welds at north end loading dock near door N-1.1, at lines 10.3 and 10.5 at grids H.5,J, <br /> and K.-The•inspector_was unable to verify if contractors used prequalified welding procedure specifications, nor was <br /> any inter ass welding inspected. An ultrasonic test was performed on the welds in question; no defects were • <br /> detected. Conformance of this issue is pending acceptance by the engineer of record. <br /> Sincerely, . <br /> OTTO ROSENAU & ASSOCIATES, INC. <br /> f • <br /> Kate Rubin <br /> Report Manager <br /> Email c: Report Distribution List <br /> N <br /> 1 7/ <br /> 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.