Laserfiche WebLink
/ 10 '003 <br /> Ted de Budden <br /> From: Mark Wetzel <mwetzel@sirconstruction.com> <br /> Sent: Wednesday, October 04, 2017 10:20 AM <br /> To: Ted de Budden <br /> Subject: RE: Dunbar Sketch <br /> Attachments: Dunbar inspection.pdf <br /> Good Morning Ted, <br /> Attached please fine my estimate with everything I believe you called out for clarification, <br /> Please let me know if you require anything else and I'd be more than happy to provide if possible. <br /> Thank you, <br /> Mark Wetzel <br /> Sr. Estimator, SIR Construction <br /> 14751 N Kelsey Street— Suite 105, #561 — Monroe, WA 98272 <br /> P: 425-315-0748 — F: 425-315-0728 —C: 425-870-7012 <br /> From:Ted de Budden [mailto:TdeBudden@everettwa.gov] <br /> Sent: Monday,October 2, 2017 2:23 PM <br /> To: Mark Wetzel<mwetzel@sirconstruction.com> <br /> Subject: RE: Dunbar Sketch <br /> Hi Mark, <br /> I received your sketch for the restoration project at 2415 Cedar Street. <br /> Please edit your drawings to show interconnected smoke alarms and locations. Indicate heating type, operable and <br /> egress window locations and sizes,ventilation fans at restrooms, laundry room and stove. <br /> It would be helpful if you would type the scope of work and attach it to or on the plan. <br /> Also, please show the entry and porch landings and steps and resend me the revised copy. <br /> Thank you <br /> Ted M. de Budden <br /> Chief Inspector <br /> Everett Building Department <br /> 425.257 7271 <br /> From: Mark Wetzel [mailto:mwetzek sirconstruction.com] <br /> Sent: Monday, October 02, 2017 2:00 PM <br /> To: Ted de Budden <br /> Cc: Rene Machado <br /> Subject: Dunbar Sketch <br /> Tom, <br /> 1 <br />