Laserfiche WebLink
RESIDENT PHOTOVOLTAIC PERMIT A.._ICATION (Page 2 of 2) <br /> CITY OF EVERETT PERMIT SERVICES <br /> ' 3200 CEDAR STREET,EVERETT,WA 98201 <br /> (P)425-257-8810 } FAX 425-257-8857 1(E)everetteps©everettwa.gov[ www.everettwa.gov/permits <br /> ELECTRICAL PERMIT CHECKLIST <br /> DETERMINE IF YOUR PROJECT QUALIFIES FOR AN OVER-THE-COUNTER ELECTRICAL PERMIT: <br /> If you answer yes to all of the below questions,the project qualifies for an over-the-counter electrical permit YES NO <br /> 1.PV modules,inverters,and combiner boxes are identified for use in PV systems. Q ❑ <br /> 2.The inverters are listed and leveled in accordance with UL 1741 and are listed for utility interaction.[IRC M2302.4] ❑ 0 <br /> 3.The AC interconnection point is on the load side of service disconnect.[NEC 690.64(B)] ® ❑ <br /> 4.The system meets all current NEC,City,and Washington Cities Electrical Code requirements. (I 0 <br /> 5. For Split-Buss modules the AC interconnection must be one of the six service disconnects. 12 0 <br /> 6.Maximum load added to the panel board is eased on the rating of the panelboards bus/main OCPD combination in accordance <br /> with NEC 705.12(DX2X3Xb),and is limited to(check the combination below that applies): <br /> ❑225amp bus/200amp main OCPD-13,400AC watts,max.70amp inverter OCPD. <br /> ❑ 5amp bus/225amp main OCPD-8,640AC watts,max.45amp inverter OCPD. <br /> L�200amp bus/200amp main OCPD-7,860AC watts,max.40amp hwerter OCPD. <br /> ❑ 150amp bus/150amp main OCPD-5,760AC watts,max.30amp inverter OCPD. <br /> ❑ 125amp bus/125amp main OCPD-4,800AC watts,max.25amp inverter OCPD. <br /> ❑ 125amp bus/100amp main OCPD-9,600AC watts,max.50amp inverter OCPD. <br /> ❑ 100amp bus/100amp main OCPD-3,840AC watts,max.20amp inverter OCPD. <br /> ❑Other Electrical Permit with Plan Review Required: <br /> motel:ustea un-aiterea rectory marrvous communion.mteranon or me paneinoaro main ut:ru win require plan <br /> review <br /> Note 2:The circuit conductors and overcurrent devices shall be sized to carry not less than 125 percent of the <br /> maximum currents as calculated in 690.8(A).The rating or setting of overcurrent devices shall be permitted in <br /> accordance with 240.4(B)and(C).[NEC 690.8(BX1)] <br /> Note 3: If a panelboard employs a snap switch rated 30 amperes or less in any branch circuit,it cannot be rated more <br /> than 200 amperes unless there is a supply side overcurrent protection at 200 amperes or less within the panelboard. <br /> This requirement does not apply to panelboards equipped with circuit breakers.Section 408.36(a)of the NEC. <br /> 7.1 have attached the following Electrical One-Line Diagram: <br /> n❑ Standard Electrical Diagram-6 Strings or Less <br /> EI Standard Electrical Diagram-4 Strings or Less <br /> 0 Standard Electrical Diagram-Micro Inverter <br /> ❑None of the above-Electrical Permit with Plan Review Required <br /> PLEASE FILL OUT A CITY OF EVERETT ELECTRICAL PERMIT APPLICATION IF YOU QUALIFY FOR AN OTC ELECTRICAL PERMIT. <br /> AGREEMENT:I hereby certify that I have read and examined this application and know the same to be true and correct All provisions of laws <br /> and ordinances governing this type of work will be completed whether specified herein or not The granting of a permit does not presume to give <br /> authority to violate or cancel the provisions of any other state or local law regulating construction or the performance of construction. That 1 am <br /> authorized by the owner of this property to perform the work for which application is made and 1 comply with the State Contractors Law 18.27 <br /> RCW and 296.200 WAC. <br /> City of Everett Official Use Only <br /> IASSOCIAE (ED EL,TICALD <br /> owned Agent Signature Date (Revised 5/30/2016) <br />