Laserfiche WebLink
INSPECTION REPORT <br /> <40t,/ <br /> % ;erDate 6212 q llb Permit: H/805-043 <br /> \ A(;t,,1 Contractor: _ _t_ 2 iy <br /> lCkA Owner: -_Zaf - <br /> Site Address:___13a_ar t2 __ <br /> TYPE OF INSPECTION REQUESTED <br /> ELECTRICAL BUILDING MECHANICAL PLUMBING <br /> ❑Temp Service ❑UFER ground ❑Groundwork/Slab ❑Groundwork/Slab <br /> ❑Groundwork ❑Footing ❑Rough In ❑Rough In <br /> ❑Slab/Conduit ❑Foundation ❑Ceiling Grid ❑Ceiling Grid <br /> ❑Rough In ❑Structural Slab ❑OK to insulate ❑OK to insulate <br /> ❑Service ❑Framing R op Units [1]Water Service <br /> 11]Grounding El Insulation echanical Final ❑Medical Gas <br /> ❑Ceiling Grid ❑Drywall Nailing ❑Plumbing Final <br /> ❑Electrical Final ❑Shear Nailing GAS PIPE <br /> SITE WORK ❑Roof Nailing ❑Rough In/Service Hot Water Tank <br /> ❑Footing drains ❑Ceiling Grid ❑Refrigeration ❑Rough in <br /> ❑Roof drains ❑Building Final��,, ❑Gas <br /> Pipe Final El HWT Final <br /> � XQOTHER OR CONSULTATION:__- ---)6105742— <br /> P <br /> // PROVAL ❑ PARTIAL APPROVAL FINAL APPROVAL THIS PERMIT <br /> ❑ __OK FOR T.C.O. ❑ CORRECTION REQUESTED /'V <br /> ❑ OK FOR C.O. ❑ VIOLATION <br /> ❑ UNABLE TO PERFORM INSPECTION: <br /> ❑ CALL(425)257-8881 FOR REINSPECTION—24 hour notice required <br /> Inspector: Date: 7-42— I <br /> EIR(10/06) DATABAR,INC. <br />