My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/09/05 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/09/05 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 9:24:19 AM
Creation date
9/11/2018 9:23:25 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
9/5/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A <br /> Scope of Work <br /> outline or baseline of existing operations. This baseline of existing operations and software <br /> systems supporting these operations will be used in Phase B to create the RFP and assist the <br /> selection of a new CMMS program. <br /> Task A2.1—Activity Review (Department provides existing data—LAC analyzes) <br /> Using information collected from the Department thorough interviews, observations and data,in <br /> combination with LAC's experience, a general listing of the type of services and activities <br /> conducted in each group within the Department will be determined.Attempts will be made to <br /> generally estimate the amount of effort made in each activity. Rather than cover all activities, <br /> LAC will utilize the Pareto principle that will focus our effort by estimating that approximately <br /> 20%of the activities comprise 80% of the work. LAC anticipates between 15 and 20 activities <br /> will be identified for each function by applying this approach. <br /> In this activity process,an inventory item that best describes the potential workload over the life • <br /> of the asset will be identified. Examples would be miles for water lines,number and size of <br /> plants,number of valves,number of pump stations,number of traffic signals, street miles, <br /> number of signs, etc. This information will be compiled in a composite list of activities and their <br /> units of measure.LAC will review crews on site during a series of field reviews to document <br /> labor,resources, location,and how work is identified. <br /> City assistance: Coordinate with employees and LAC to set up field observations at various <br /> locations. <br /> Product: Activity list with unit of measure identified and documented. <br /> Task A2.2— Work History and Service Level Review(Department provides <br /> existing data—LAC analyzes) <br /> A ten-year compilation of work performed by major activities (30 provided by City)will be <br /> made. This will be achieved through a review of daily work reports,work orders, or use of any <br /> existing reporting systems (Cassworks), as well as estimates of material used and field <br /> observations of the existing operations. The data compiled will be in person-days of work <br /> annually and by activity,along with the work units accomplished. An example for a fiscal year <br /> would be the number of valves turned, or the number of lift station preventative maintenance <br /> routines performed, signs replaced, feet of sewer lines cleaned,inlets cleaned, etc. This will be <br /> performed for each activity.Also, any support contract information will be obtained to capture <br /> all maintenance effort. <br /> City assistance: Provide ten-year history of work accomplishment by activity. <br /> Product: A work history will be compiled for activities performed by all groups. <br /> Task A2.3—Resource and Organizational Data (Department provides existing <br /> data—LAC analyzes) <br /> Using the assistance of Department staff,LAC will request a listing by general category for <br /> labor, equipment, and material resources. Existing personnel and equipment files, as well as <br /> information from field and office observations will be used to provide the estimates.If the <br /> information is not available,unit costs will be estimated.LAC will also make an estimate of staff <br /> 8/14/18 Exh A-4 City of Everett,WA <br />
The URL can be used to link to this page
Your browser does not support the video tag.