My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7210 HIGHLAND DR 2018-09-11
>
Address Records
>
HIGHLAND DR
>
7210
>
7210 HIGHLAND DR 2018-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 12:53:24 PM
Creation date
9/11/2018 12:53:23 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND DR
Street Number
7210
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> Residential Photovoltaic OTC Permit Application <br /> Contractors can apply for an Over-The-Counter(OTC)permit where the PV system meets the requirements listed <br /> , . in this Checklist.All project plans and supporting documentation must be provided on site for the inspector. <br /> --------TO BE COMPLETED BY APPLICANT------- <br /> . <br /> PPLUCANT-_M_.__ <br /> Nil Project Information <br /> Property Owner Name: Donald&Frances Forsythe <br /> Project Address: 7210 Highland Dr Parcel# 00472300000200 <br /> City: Everett State: WA ZIP: 98203 <br /> Day Phone: (425)267-0820 <br /> Contractor Name Smart Energy Today <br /> Contractor License#: SMARTET869BS <br /> Contractor Day Phone: 360-339-6660 <br /> PV system description Installation of residential rooftop pv solar system 8.26kW with micro-inverters <br /> (include manufacturer containing automatic rapid shutdown. <br /> and model#of PV (28x) Itek Energy/IT295-SE <br /> modules and (14x) Blue Frog Solar/YC500A-MIW <br /> inverters): Sun Modo racking <br /> Deter mine if your project qualifies for expedited permitting: <br /> Yes No <br /> 1. PV system is designed and proposed for a detached one-or two-family dwelling or <br /> townhouse not more than three stories above grade or detached accessory structure that IV o <br /> is code compliant to setbacks and height,or code allows expansion of nonconformity for <br /> solar modules.[IRC 101.2] <br /> 2. Modules on pitched roofs do not exceed the highest point of the roof unless approved by V 0 <br /> the local jurisdiction. • <br /> 3. Rooftop is made from lightweight material such'as a single layer of composition shingles, V 0 <br /> metal roofing,lightweight masonry,or cedar shingles. <br /> 4. The installation shall comply with the manufacturer's instructions.[IRC M2302.2] V 0 <br /> 5. The installation shall meet the requirements of NFPA 70 National Electric Code,and all <br /> required electrical permit(s)must be obtained from the Authority Having Jurisdiction to 0 <br /> administer the electrical code.[IRC M2302.2] <br /> 6. The installation shall meet the requirements of the International Fire Code as amended ❑ <br /> by WA State.[IRC M2302.2] <br /> 7. The PV system is designed for the wind speed of the local area,and will be installed per V p <br /> the manufacturer's specifications.[IRC M2302.2.1(1)] <br /> 8. The ground snow load does not exceed 70 pounds per square foot,[IRC M2302.2.1(2)] 0 <br /> 9. Total dead load of modules,supports,mountings,raceways and all other appurtenances <br /> weigh no more than-four pounds per.square foot.[IRC M2302.2.1(3)j ' 0 <br /> Enter total dead load of system(lbs/ft2): <br /> 10. To address uplift,modules are mounted no higher than 18"above the surface of the 62( ❑ <br /> roofing to which they are affixed,[IRC M2302.2.1(4)] <br />
The URL can be used to link to this page
Your browser does not support the video tag.