My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
238 HIGHLAND RD 2018-09-11
>
Address Records
>
HIGHLAND RD
>
238
>
238 HIGHLAND RD 2018-09-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/11/2018 1:17:21 PM
Creation date
9/11/2018 1:17:12 PM
Metadata
Fields
Template:
Address Document
Street Name
HIGHLAND RD
Street Number
238
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
03 BU1LD1W i DLPARIME <br /> s 3200 CEDAR STREET <br /> EVERETT.WA 98201 <br /> 425 257-8810 <br /> Phone O/der <br /> xxxxxxxxxxxx7674 <br /> VISA Entry Method: Manual <br /> Total: $ 326.85 (425) 257-8810 <br /> 03/16i16 09:28:35 <br /> Inv #: 000000002 Apar Code: 05091D <br /> Apprvd: Online <br /> AVS Code: EXAC MATCH V <br /> CVV2 Code: MATCH M Plan Check No.: B1603-046 <br /> Cstomer Coat Application Date: 3/16/2016 <br /> THANK YOU! <br /> Tenant: [TenName] <br /> Owner: HAWKEY JOSEPH P&TANIS M <br /> Job Address: 238 HIGHLAND RD <br /> Proposed Use: <br /> Description of Work: INGROUND POOL <br /> Plan check Fee Paid: $326.85 <br /> :"4'y cr1 <br /> The building permit application for the above-referenced project is being conditionally accepted for Mpg —4 <br /> pending the determination of its completeness. czi <br /> If the City review determines that any additional land use approval or any additional information is c..74 <br /> required to complete your building permit application,it will be necessary to submit this additional en-, rm. <br /> ai4 <br /> information or acquire the additional land use approval prior to your application being considered complete 1 ;-, <br /> for filing. If no other land use approval or additional information is required,your building permit, 1, ' <br /> application will be considered filed as of this date. Plan review fees are estimates. Final plan reviOyi fees , <br /> will be calculated at permit issuance. <br /> BUILDING PERMIT APPLICATIONS EXPIRE IF NO PERMIT IS ISSM mss <br /> WITHIN 180 DAYS FOLLOWING THE DATE OF APPLICATION. `='‹.7.) <br /> APPLICANT COPY <br />
The URL can be used to link to this page
Your browser does not support the video tag.