Laserfiche WebLink
• 1. ALL CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE 2012 IBC AND ANY CURRENT EDITION 13. EXTERIOR WALLS SHALL BE 2x6, UNLESS NOTED OTHERWISE. w <br /> OF FEDERAL, STATE, AND LOCAL RULES AND STANDARDS OF GOVERNING AGENCIES HAVING O <br /> JURISDICTION. 14. INTERIOR WALLS SHALL BE 2x4, UNLESS NOTED OTHERWISE. Z <br /> 2. STATEMENT OF ERRORS, AMBIGUITIES AND OMISSIONS: ANY ERRORS, AMBIGUITIES, AND OMISSION 15. ALL HEADERS OVER DOORS AND WINDOWS SHALL BE A MINIMUM OF (2) 2x8, UNLESS <br /> IN DRAWINGS AND/OR SPECIFICATIONS SHALL BE REPORTED TO BERKEY ENGINEERING FOR OTHERWISE NOTED. o <br /> F <br /> CORRECTION BEFORE ANY PART OF THE WORK IS STARTED. UNLESS EXPRESSLY STIPULATED, NO <br /> ADDITIONAL ALLOWANCE WILL BE MADE IN THE OWNER'S AND/OR CONTRACTOR'S AND/OR 16. TRUSS MANUFACTURER SHALL VERIFY LOAD BEARING POINTS FOR ALL TRUSSES. cn <br /> MANUFACTURER'S FAVOR BY VIRTUE OF ERRORS, AMBIGUITIES, AND/OR OMISSIONS WHICH <br /> SHOULD HAVE BEEN DISCOVERED DURING THE PREPARATION FOR CONSTRUCTION AND DIRECTED 17. ROOF SHEATHING SHALL BE 7/16 OSB NAILED TO FRAMING WITH 8d AT 4" C/C EDGES, 12" 1 <br /> TO BERKEY ENGINEERING'S ATTENTION IN A TIMELY MANNER. IT IS THE OWNER'S ULTIMATE C/C FIELD. <br /> RESPONSIBILITY TO HOLD THE CONTRACTOR AND/OR SUBCONTRACTORS ACCOUNTABLE THROUGH <br /> CONTRACT. BERKEY ENGINEERING ACCEPTS NO RESPONSIBILITY FOR WORK DONE BY THE OWNER, 18. ROOF SHEATHING SHALL BE LAID WITH LONG DIMENSION PERPENDICULAR TO THE FRAMING <br /> THE CONTRACTOR OR SUBCONTRACTORS CONTRARY TO THE PLANS OR SPECIFICATIONS. MEMBERS. SHEARWALL SHEATHING MAY BE PLACED PARALLEL, PROVIDED THAT ALL BOUNDARIES z <br /> SUBSTITUTION OR CHANGES WILL NOT BE ACCEPTED UNLESS APPROVED IN WRITING. THE ARE FULLY BLOCKED. >-+ A Q <br /> SUBCONTRACTOR SHALL REVIEW ALL SECTIONS OF SPECIFICATIONS AND ALL SHEETS OF THE Permit#: B1605-018 8 <br /> PLANS FOR ANY INFORMATION OR DETAILS PERTAINING TO THEIR SPECIFIC TRADE. 19. INSULATION SHALL BE: Site Address: 238 HIGHLAND RDx 3 <br /> F <br /> w <br /> EXTERIOR HOUSE WALLS: R-21 Owner: HAWKEYJOSEPHP&TANISM ;< 1 w w <br /> 3. CONTRACTOR IS RESPONSIBLE FOR VERIFICATION OF SITE CONDITIONS, INSTALLATION STANDARDS FLOORS: R-30 App.Date: 5/9/2016 [ ., g o <br /> AND CONSTRUCTION CONDITIONS. FIELD VERIFY ALL NECESSARY DIMENSIONS. DISCREPANCIES VAULTED CEILING: R-38 Proposed Use: SFR ACCESSORY BLDG j k N V <br /> x w H <br /> BETWEEN SITE CONDITIONS AND THE CONSTRUCTION DRAWINGS SHALL BE CALLED TO THE Description: ACCESSORY BLDG OVER EXISTING IN ., <br /> ATTENTION OF THE ENGINEER. WORK DONE WITHOUT THE ENGINEER'S APPROVAL IS THE 20. DESIGN LOADS: GROUND POOL ;- <br /> RESPONSIBILITY OF THE CONTRACTOR/SUBCONTRACTOR. ROOF LIVE LOAD: 20 PSF N <br /> ROOF SNOW LOAD: 25 PSFilt / <br /> 4. PLUMBING, ELECTRICAL, POOL ROOM AND EQUIPMENT ROOM VENTING, DEHUMIDIFICATION, WIND SPEED: 110 MPH EXP B •Revie �d By: ,/ Date: --(O -! C <br /> LIGHTING, AND SWIMMING POOL BY OTHERS. SEISMIC ZONE: D1 <br /> Office Set Job Site Set Fire/Planning Set 1 <br /> 5. VENTILATION SHALL BE DESIGNED TO MEET 2012 IMC BY OTHERS. DESIGN SHALL BE VERIFIED SHEARWALL SCHED <br /> w <br /> PRIOR TO CONSTRUCTION OF BUILDING. DESCRIPTION z <br /> 6. ALL FILL OR BACKFILL SHALL BE COMPACTED TO 95% OF MAXIMUM DENSITY. REMOVE ALL SW-1 7/16" OSB NAILED TO FRAMING WITH 8d AT 4" C/C BOUNDARY, 12" C/C Q rn <br /> DEBRIS FROM THE AREA TO BE BACKFILLED PRIOR TO BACKFILLING. FIELD. BOUNDARIES SHALL BE FULLY BLOCKED. 1/2" A.B. AT 3'-0" C/C, 1 2" 0 rzo ¢ M M <br /> MAX FROM END. A 0 5 2016 a w o <br /> 7. PLACE LOAD BEARING BACKFILL IN LAYERS NOT MORE THAN 8 INCHES THICK, LOOSE r a z o <br /> MEASUREMENT. SPREAD AND COMPACT EACH LAYER UNIFORMLY TO THE REQUIRED DENSITY. <br /> rrl <br /> SW-2 7/16" OSB NAILED TO FRAMING WITH 8d AT 3" C/C BOUNDARY, 12" C/CITY OF EVERETT z A - z <br /> 8. ALL CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 2500 PSI AT 28 DAYS. FIELD. BOUNDARIES SHALL BE FULLY BLOCKED. 5/8" A.B. AT 2'-0" C/C, 1213' 11 p1It Services .SSo , U x d <br /> cl W a; a w <br /> 9. REINFORCEMENT SHALL CONFORM TO ASTM A615, GRADE 60 (DEFORMED). FABRICATE MAX FROM END. HD ANCHOR POINT SHALL BE DBL 2x6 STUD OR GREATER. <br /> REINFORCEMENT PER ACI 318-89, CLASS "B" SPLICES OR ACI 315-83, CLASS "C" SPLICES UNLESS NOTED OTHERWISE. REINFORCEMENT SHALL BE CONTINUOUS BENT AROUND CORNERS, HOLD DOWN (HD) SCHEDULE <br /> OR CORNER BARS OF THE SAME SIZE MAY BE INSTALLED WITH MINIMUM LEG LENGTH THAT MARK DESCRIPTION <br /> 1.CONFORMS TO ACI 318-89, CLASS "B" SPLICES OR ACI 315-83, CLASS "C" SPLICES. TOOL ALLEXPOSED EDGES WITH A CONCAVE TOOLING DEVICE. ALL CONCRETE WORK SHALL BE IN 0 NO HD <br /> ACCORDANCE WITH ACI 301. WELDING OF REINFORCING BARS SHALL REQUIRE THE APPROVAL OF A STHD14 OR EQUAL <br /> (---: <br /> THE ENGINEER. ALL WELDING SHALL BE DONE BY AWS CERTIFIED WELDERS AND CONFORM TO NOTE: ALL HD ARE SST OR EQUAL <br /> AWS D1.1, E90 ELECTRODES MINIMUM. <br /> 10. ALL ANCHOR BOLTS SHALL HAVE 3"x3"x1/4" HD GALV BEARING PLATES. W <br /> 11. ALL FRAMING MATERIAL SHALL BE DOUGLAS FIR/HEMLOCK NO. 2 OR BETTER. ALL ' ' �I p'4r7`:r' �' rDRAwNBY` TPP <br /> GLUE—LAMINATED BEAMS (GLB) SHALL BE DOUGLAS—FIR GRADED 24F—V4. WOOD IN CONTACT C/C = CENTER TO CENTER ' 4c 't' <br /> WITH CONCRETE SHALL BE PRESSURE TREATED. / :I -'' 4 �,' APPROVEDBY: <br /> DBL = DOUBLE � '1 L�� -, � � <br /> GALV = GALVANIZED <br /> {- ECE5VE '� DATE: <br /> 12. ALL FRAMING ASSOCIATED WITH LATERAL OR VERTICAL STRAPS OR HOLD DOWNS SHALL HD = HOT DIPPED "' e 03/31/2016 <br /> CONSIST OF A MINIMUM OF (2) 2x6 STUDS, BLOCKS, OR PLATES. ALL SHEAR ELEMENTS SHALL MIN = MINIMUM SCALE: <br /> BE CONTINUOUS FROM FOUNDATION OR SHEAR DIAPHRAGM TO ROOF SHEATHING. PT = PRESSURE TREATED MAY 2 7 2016 �� •. 37708 ;. 4, AS NOTED <br /> SCSJ = SAW CUT JOINT — O' 2)/ PROJECT REV <br /> SW = SHEAR WALL CITY OF EVERETT loWirlePr `15248 0 J <br /> TYP = TYPICAL Permit Services <br /> IEXPIRES 08/18/ 17 I SHEETS1 <br /> STRUCTURAL NOTES LEGEND No. _ <br />