My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
David Place 9/11/2018
>
Contracts
>
6 Years Then Destroy
>
2019
>
David Place 9/11/2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2018 10:52:40 AM
Creation date
9/13/2018 10:52:32 AM
Metadata
Fields
Template:
Contracts
Contractor's Name
David Place
Approval Date
9/11/2018
End Date
12/31/2019
Department
Public Works
Department Project Manager
Heather Griffen
Subject / Project Title
Grand Avenue Park Bridge
Public Works WO Number
PW3588
Tracking Number
0001425
Total Compensation
$25,000.00
Contract Type
Agreement
Contract Subtype
Professional Services
Retention Period
6 Years Then Destroy
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 After receiving the BOARD recommendations, the STATE and the CONTRACTOR <br /> 2 shall respond to the other in writing signifying that the dispute is either resolved, or <br /> 3 remains unresolved. Although both parties should place weight upon the BOARD's <br /> 4 recommendations, they are not binding. However, if the BOARD's <br /> 5 recommendations do not resolve the dispute, all records, and written <br /> 6 recommendations, including any minority reports, may be admissible as evidence <br /> 7 in any subsequent litigation. If the BOARD's assistance has not resolved the <br /> 8 dispute, the CONTRACTOR must file a claim in accordance with the STATE's <br /> 9 Standard Specification 1-09.11(2), Claims, before seeking judicial relief. <br /> 10 <br /> 11 Miscellaneous <br /> 12 It is not desirable to adopt hard and fast rules for the functioning of the BOARD. <br /> 13 The entire procedure is expected to be flexible enough to respond appropriately to <br /> 14 changing situations. The BOARD should initiate, along with the STATE and <br /> 15 CONTRACTOR's concurrence, new rules or modifications to old ones whenever <br /> 16 this is deemed appropriate. <br /> 17 <br /> CITY OF EVERETT <br /> GRAND AVENUE PARK BRIDGE July 2017 <br /> WO#3588 Appendix J-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.