My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 708-80
>
Ordinances
>
Ordinance 708-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/20/2018 11:08:55 AM
Creation date
9/20/2018 11:08:55 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
708-80
Date
7/2/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br /> • <br /> • <br /> • <br /> • <br /> • <br /> Section 2: <br /> • Authorization is given to provide for the reconstruction and improvement of <br /> traffic signal systems at the intersections of: <br /> 1) 47th/Evergreen Way <br /> 2) 50th/Evergreen Way <br /> 3) 52nd/Evergreen Way <br /> 4) Peck's Dr/Evergreen Way <br /> 5) Madison/Evergreen Way <br /> 6) 75 St/Evergreen Way <br /> 7) 79 St/Evergreen Way <br /> 8) 41 St/ Colby <br /> 9) 41 St/Rucker <br /> 10) 37 St/Colby <br /> 11) 35 St/Rucker <br /> 12) Evergreen/Casino Road/SR 526 Ramps <br /> and for the purchase of land to provide right-of-way at <br /> 13) Evergreen/Casino Road/SR 526 Ramps <br /> and for the purchase of a traffic signal control system at <br /> 14) Evergreen/Casino Road/SR 526 Ramps <br /> and for the purchase of traffic signal controllers and miscellaneous traffic signal <br /> hardware at <br /> 15) 47th/Evergreen Way <br /> 16) 50th/Evergreen Way <br /> 17) 52nd/Evergreen Way <br /> 18) Peck's Dr/Evergreen Way <br /> 19) Madison/Evergreen Way <br /> 20) 75/Evergreen Way <br /> 21) 79/Evergreen Way <br /> Section 3: <br /> The total estimated cost of the improvements herein authorized is $270,645 <br /> which shall include all cost of the design, plans, specifications, construction, <br /> and associated costs. <br /> Section 6: <br /> The additional sum of $101,190 bringing the total to $270,645 be appropriated <br /> to Fund 328 Evergreen Way Signals, et al, for the purposes of performing <br /> preliminary engineering and purchase of traffic control system hardware as <br /> follows: <br /> -3- <br />
The URL can be used to link to this page
Your browser does not support the video tag.