My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 676-80
>
Ordinances
>
Ordinance 676-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/21/2018 10:16:35 AM
Creation date
9/21/2018 10:16:34 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
676-80
Date
3/26/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF PROJECT COSTS: <br /> A. Phase I - Preliminary Engineering & R-O-W Acquisition & Design <br /> Detailed Design by Consultant (TAMS) $160,000 <br /> Right-of-Way (Appraisals, Title Reports, Acquisition) 5,000 <br /> In-House Engineering and Administration 7,000 <br /> State Services 4,000 <br /> Subtotal $176,000 <br /> B. Phase II - Construction <br /> Construction Contract (David Mowat) $1,755,870 <br /> Contract Administration, Construction, <br /> Inspection and Surveying 228,380 <br /> Audit 1,000 <br /> Interest and Art Fee 35,000 <br /> Subtotal $2,020,250 <br /> TOTAL $2,196,250 <br /> SOURCE OF FUNDS <br /> Federal Bridge Rep]a,,Pient Monies (BRM) $1,184,750 <br /> Urban Arterial Board (UAB) 775,400 <br /> Federal Revenue Sharing (Fund 199-1978) 15,000 _ <br /> City General Fund (Ord 569-78) 65,600 <br /> City General Fund (1978 Cash Forward - Ord 612-79) 100,000 <br /> City General Fund (To be appropriated) 55,500 <br /> TOTAL $2,196,250 <br />
The URL can be used to link to this page
Your browser does not support the video tag.