My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 667-80
>
Ordinances
>
Ordinance 667-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 9:25:46 AM
Creation date
9/24/2018 9:25:44 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
667-80
Date
2/27/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO.(0(0 7-St) <br /> AN ORDINANCE amending Sections 2 and 9 of <br /> Ordinance No. 630-79 , creating a special <br /> construction fund entitled "1979 Block Grant <br /> Neighborhood Improvement Fund No. 333" , <br /> decreasing the appropriation for Garfield <br /> School Playground by $24 , 000 , increasing the <br /> appropriation for Riverside Neighborhood <br /> Improvements by $24 , 000 and reallocating <br /> the Lowell Neighborhood Improvements appro- <br /> priation of $100 , 000 . <br /> NOW, THEREFORE, BE IT ORDAINED BY THE EVERETT CITY COUNCIL <br /> THAT: <br /> Section 1: That Sections 2 and 9 of Ordinance No. 630-79 <br /> which read as follows : <br /> Section 2 : Authorization is hereby given to provide for <br /> the development of contract plans , specifi- <br /> cations and detailed cost estimates and construction required <br /> to provide the following. <br /> A. Riverside Neighborhood Improvements: <br /> 1 . Overlay Cedar, 19th to 21st, widen and install <br /> curbs both sides . <br /> (Estimated Cost: $50, 000) <br /> 2 . Replace sections of sidewalk on Chestnut between <br /> 23rd Street and Everett Avenue. <br /> (Estimated Cost: $ 8 , 422) <br /> 3. (tie) Replace sections of sidewalks on Highland <br /> between 23rd and Everett Avenue . <br /> (Estimated Cost: $12 , 797) <br /> 4 . (tie) Pave 22nd Street from Rainier to Baker. <br /> (Estimated Cost: $21 , 473) <br /> B. Port Gardner Neighborhood Improvements : <br /> 1. Complete any 1978 Port Gardner Neighborhood projects <br /> which were approved by City Council in 1978 but can- <br /> not be completed with 1978 Port Gardner Block Grant <br /> funds , up to a maximum of $10 , 000 . <br /> 2 . Two reflective tape crosswalk signs on the north <br /> sides of the 35th and Hoyt intersection and the <br /> 36th and Hoyt intersection. <br /> (Estimated Cost: $ 300) <br /> 3. Improvements on 35th from Hoyt to Rucker up to a <br /> maximum of $33, 000 in the following priority: <br />
The URL can be used to link to this page
Your browser does not support the video tag.