My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 664-80
>
Ordinances
>
Ordinance 664-80
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/24/2018 9:42:05 AM
Creation date
9/24/2018 9:42:03 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
664-80
Date
2/13/1980
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• • <br /> • <br /> 11 <br /> DEVELOPMENT CONTRACT <br /> (I BETWEEN. <br /> DUJARDIN DEVELOPMENT COMPANY AND THE CITY OF EVERETT <br /> PLANNED RESIDENTIAL DEVELOPMENT <br /> #6-79 <br /> ' Final Development Plan Approval and subsequent issuance of construction <br /> ;permits for the Dujardin PRD on the parcel described in Rezone Ordinance <br /> No. 664-80 shall comply with the following conditions and requirements: <br /> • ! CONDITIONS <br /> 1. That the Final Development Plans for Phase I of the project • <br /> be developed according to the site plan given preliminary <br /> approval by City Council and will consist of the following <br /> elements: <br /> ';i a. 34 units in the form of 5 duplex and 6 fourplex units. <br /> b. 3.7 acres of open space including a tot lot, a play court, <br /> additional space for older children and a community center. <br /> • <br /> c. A private cul-de-sac internal road system with only one <br /> connection to a public street at 3rd Avenue. <br /> d. 60 parking spaces as indicated on the site plan with an <br /> open space area set aside for parking expansion (5 addi <br /> ' tional spaces to be developed if need arises as determined • <br /> by the Everett Traffic Engineer) . <br /> 2. , Landscaping Plan: That the landscaping plan show typical planting <br /> around units, narking areas, open space areas, and the perimeter <br /> • <br /> of the site (10 foot minimum to be retained as natural open space) . <br /> These detailed final plans shall be submitted and approved by the <br /> Planning Department prior to initiation of any building construction. <br /> 3. Off site improvements: That 3rd Avenue shall be improved from the <br /> north property line of the project to match the existing improve- <br /> ment on the west half of the street to the south (curb, gutter, and <br /> sidewalk on one side and approximately 20 feet of paving) . <br /> • <br /> An L.I.D. Power-of-Attorney for future cost participation in a <br /> • signal at 3rd Avenue and South Broadway is required. The project <br /> will only pay a portion of the signal cost based on proportionate <br /> need. <br /> Ii. 4. Internal Roads: In Phase I internal streets are to be 28 feet wide <br /> and perpendicular parking on both sides of the street. These internal <br /> Ij roads shall be constructed to City standards excluding width. . <br /> 5. Utilities: All water and sewer improvements designs shall be reviewed <br /> by Public Works per standards with a looped water system being required <br /> and layout which provides for reasonably long term durability and ease <br /> of maintenance. 'Maintenance of all Phase I facilities is the, responsi- <br /> bility of the Everett Housing Authority. <br /> 6. Drainage: City drainage ordinance shall, be complied with during <br /> • <br /> and after construction. Any improvement in the stream corridor <br /> will. require State Department of Game or Fisheries Hydraulic Project <br /> approval. <br /> • <br /> • <br /> • <br /> ti <br />
The URL can be used to link to this page
Your browser does not support the video tag.