My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 633-79
>
Ordinances
>
Ordinance 633-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 10:49:26 AM
Creation date
9/25/2018 10:49:25 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
633-79
Date
9/19/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- <br /> 1 ORDINANCE NO.6, ? - 77 <br /> 2 <br /> AN ORDINANCE authorizing the condemnation of the right-of-way, if <br /> 3 necessary, on 19th Avenue from SR 5 to 112th Street. <br /> 4 <br /> 5 <br /> WHEREAS, on September 28, 1977, the City did submit to the State of <br /> 6 <br /> Washington Urban Arterial Board (UAB) a project prospectus for funding the design, <br /> 7 <br /> preparation of plans, specifications, cost estimate, right-of-way acquisition, and <br /> 8 <br /> construction of the 19th Avenue street widening project from SR 5 to 112th Street; and <br /> 9 <br /> WHEREAS, the UAB did approve the project in the amount of $1,460,000 (UAB <br /> 10 <br /> $1,314,000/City $146,000) as requested in the City's project prospectus on the condition <br /> 11 <br /> that the project be under contract for construction within 18 months from the date of <br /> 12 <br /> authorization, January 19, 1978; and <br /> 13 <br /> WHEREAS, on February 15, 1978, after the required three readings, the City <br /> 14 <br /> Council did approve the Plans and Systems Ordinance for the 19th Avenue S.E. (SR 5 to <br /> 15 <br /> 112th Street) street widening; and <br /> 16 <br /> WHEREAS, on February 15, 1978, the City Council did approve the Project <br /> 17 <br /> Agreement for Preliminary Engineering Proposal between the UAB and the City of <br /> 18 <br /> Everett and authorized the Mayor to sign the agreement forms; and <br /> 19 WHEREAS, on March 22, 1978, the City Council did approve the Consultant <br /> 20 <br /> Agreement for Preliminary Engineering between Entranco Engineers and the City of <br /> 21 Everett for a maximum amount of $142,290; and <br /> 22 WHEREAS, Entranco Engineers will have substantially completed the Preliminary <br /> 23 Engineering phase of the project by the next meeting of the UAB on February 21, 1979; <br /> 24 and <br /> 25 WHEREAS, UAB funding for right-of-way acquisition and construction can only <br /> 26 be obtained by submittal of a Construction Prospectus to the UAB, including a <br /> 27 Resolution by the City Council authorizing condemnation of right-of-way, if necessary, <br /> 28 in order to have the project ready for construction within the originally agreed upon 18 <br /> 29 month time period. <br /> 30 <br /> 31 <br /> 32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.