Laserfiche WebLink
8) Madison/Evergreen Way <br /> 9) 79th/Evergreen Way <br /> 10) Casino/SR 526/Evergreen Way <br /> and for the purchase of land to provide the right-of-way at <br /> 11) Casino/Evergreen Way <br /> Section 3: <br /> The total estimated cost of the improvements herein authorized is <br /> $81,330 which shall include all cost of the design, plans, speci- <br /> fications, construction and associated costs. <br /> Section 6: <br /> The sum of $81,330 be appropriated to Fund 328 Evergreen Way Signals, <br /> et al, for the purposes of performing preliminary engineering, in the <br /> following manner: <br /> a. Program 716 - Traffic Signal reconstruction on Evergreen Way <br /> at 47th Street, 50th Street; 52nd Street <br /> 1) appropriation 18,415 <br /> 2) Source of Funds FAM 14,732 <br /> 1/2c gas tax 3,683 <br /> 18,415 <br /> b. Program 722 - Traffic Signals on 41st Street at Colby & Rucker <br /> 1) appropriation 10,958 <br /> 2) Source of Funds FAM 3,166 <br /> FASP 6,300 <br /> 1/2c gas tax 1,492 <br /> 10,958 <br /> c. Program 723 - Traffic Signals at 37th Street/Colby & 35th/Rucker <br /> 1) appropriation 14,457 <br /> 2) Source of Funds FAM 11,566 <br /> 1/2c gas tax 2,891 <br /> 14,457 <br /> d. Program 724 - Traffic Signals on Evergreen Way at Madison, <br /> 79th Street and Casino/SR 526 <br /> 1) appropriation 31,500 <br /> 2) Source of Funds FAM 25,200 <br /> 1/2c gas tax 6,300 <br /> 31,500 <br /> - 3 - <br />