My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 610-79
>
Ordinances
>
Ordinance 610-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/25/2018 11:40:59 AM
Creation date
9/25/2018 11:40:57 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
610-79
Date
6/20/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(3) Correction of damages resulting from spoils <br /> entering a stream bed, cleaning out silted <br /> areas downstream, cleaning out debris from <br /> downstream drainage facilities. <br /> (4) Repair or replacement of permanent improvements. <br /> The bond or other security shall be held in effect <br /> until no less than one year or more than three years <br /> after the last development has been completed and <br /> approved by the City of Everett Engineering Department <br /> through on-site inspection and acceptance of as-built <br /> drawings. <br /> b) Special clearing and erosion control measures may, at <br /> the sole discretion of the City, be imposed. Examples <br /> of such measures include but are not limited to: <br /> (1) Delay of land clearing until immediately prior <br /> to actual construction. <br /> (2) Imposition of special temporary erosion control <br /> measures prior to construction of the storm and <br /> surface water runoff retention and detention <br /> system such as detention ponds, and conveyance <br /> of surface water off the site by closed system <br /> with adequate kinetic energy dissipation. <br /> c) Special additional restrictions may also be imposed by <br /> the City. The area subject to these restrictions <br /> shall be identified on the site plan and/or plat map <br /> by legal description. Types of restrictions include <br /> but are not limited to: <br /> (1) Ground cover shall not be disturbed in any manner. <br /> (2) Trees shall be left in place and not disturbed. <br /> (3) Spoils or other debris shall not be deposited in <br /> these areas. <br /> (4) Soils shall not be disturbed. <br /> (5) No surface drainage shall be routed or allowed to <br /> drain over these areas. <br /> c. In all cases subject to these provisions, after approval of the <br /> feasibility study and site plan, construction shall be required <br /> to proceed as follows: <br /> (1) The storm and surface water runoff retention and detention <br /> system shall be completed before other phases of site devel- <br /> opment are begun so that it can serve as a sediment trap <br /> during the remainder of the construction. <br /> (2) Large tracts shall be developed in workable units on <br /> -4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.