Laserfiche WebLink
BOEING COMMERCIAL AIRPLANE GROUP <br />BUILDINGS 40,11111111111,025 / 40111111111111035 <br />"FACTORY TRANSFORMATION 777X Service Ready Wing" <br />PRO <br />LOG <br />REVISION <br />DEMOLITION PERMIT ONLY WBS 1 <br />WBS 16324 <br />ISSUE FOR DEMOLITION PERMIT <br />SRW TOWER SUPPORT (40-025 / 40-035) <br />VICINITY MAP <br />SCALE: N.T.S. V <br />REYTSON <br />R <br />BOEING EVERETT FACILITY <br />3003 WEST CASINO ROAD <br />EVERETT, WASHINGTON <br />LOCATION MAP N <br />SCALE: N.T.S. <br />T 40-51 Fr�' <br />PROJECT <br />SITE PLAN S(TE N <br />SCALE: N.T.S. <br />giA"morw" 0 <br />ACCEPTABILITY <br />THIS DESIGN AND/OR <br />SPECIFICATION IS APPRO <br />00DE SUMMARY <br />BUILDING CODE / LIFE SUM CODE ANALYSIS <br />Brrffa-vtv I <br />Applicable Codes and Standards: <br />A Intenational Building Code (IBC), 2015 with Washington stale mnenaments. <br />B. International Mechanical Code (IMC), 2015 <br />I, International FIre Code (IFC), 2015 <br />D. UnOorm Plumbing Code (UPC), 2015 <br />E Washington State Energy Code (WSEC), 2015 <br />F. National Electrical Cade (NEC), 2014 <br />G. ICC/ANSI At 17.1. Accessible and Useable Bindings and Facilities, 2OD9 <br />ALL JURISDICTIONAL MODIFICATIONS AND AMENDMENTS TO CODES AND STANDARDS <br />SHAH BE INCORPORATED. WHERE MULTIPLE CODES CONFLICT, THE MOST STRINGENT <br />SHALL GOVERN. <br />Pr^oiect Descrrotion: <br />SERVICE READY WING — TOWER SUPPORT PACKAGE INCLUDES: <br />WORK INCLUDES OPENING DEMOLITION WITHIN NON —BEARING WALLS OF THE FIRST <br />FLOOR OF THE TOWERS IN BOTH 40-025 AND 40-035 BUILDINGS. OPENINGS ARE <br />TO BE PREPARED FOR INFILL WITH SHOP FENCING. <br />atemtron Areo (crosst: <br />First floor towers: 40-025 1.406 SF <br />40-M 3,30D SF <br />Use k Occuconcv Closification: <br />Factory Industrial - Moderate Named: (F-1) IBC 306.2 <br />Canstrucfion Gassifrc0ion (per ®C Table 601): <br />Type II-B. Sprinkkred <br />alowabk BuBdm Haoht and Area (rcr IBC 7abk 5031: <br />Maximum height: 70' (Per 5043) hit = 114'-6' <br />4aximum area: Unlimited per IBC 5073 <br />Firee pe, IBC RaOm Rm Vftls fix Bum, Bemente: <br />None per IBC Tades 601 & 602 <br />THESE DOCUMENTS HAVE NOT BEEN <br />APPROVED FOR THE ISSUANCE OF <br />PUBLIC WORK, MECHANICAL, FIRE <br />SUPPRESSION, ELECTRICAL OR <br />PLUMBING PERMITS <br />CITY OF EVERETT <br />REVIEWED FOR PERMIT <br />�-- J,,,._ 02- T ) 7 <br />INDEX OF DRAWINGS <br />40-025-1Al2R REMOVAL PARTIAL FIRST FLOOR PLAN <br />40-025-1Al2 PARTIAL FIRST FLOOR PLAN <br />40-035-1A22R REMOVAL PARTIAL FIRST FLOOR PLAN <br />40-035-1A23R REMOVAL PARTIAL FIRST FLOOR PALN <br />40-035-1A22 PARTIAL FIRST FLOOR PLAN <br />40-035-1A23 PARTIAL FIRST FLOOR PLAN <br />40-035-A534 MISCELLANEOUS DETAILS <br />40-025-A555 FENCING DETAILS <br />COVER SHEET <br />BUILDING 40-035 <br />JUN 2 7 2017 0 <br />CITY OF EVERETT <br />Permit Services <br />40-035-GO-801 <br />