My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 593-79
>
Ordinances
>
Ordinance 593-79
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2018 9:57:32 AM
Creation date
9/27/2018 9:57:29 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
593-79
Date
4/11/1979
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
S ' <br /> ARE HEREBY AMENDED AS FOLLOWS: <br /> Section 2: <br /> Approval of the "Supplemental Agreement to Phase I Maple Heights Bridge <br /> Preliminary Engineering Study to provide for Phase II follow-on detail design <br /> and Phase III construction support, "for a cost not to exceed $96,414 is hereby <br /> granted and the Mayor is authorized to enter into formal contract with the <br /> consultant for the design of the replacement structure based on Alternate <br /> Number 3 (Concrete Prestressed Girder) as presented in the Preliminary <br /> Design Study. <br /> The sum of $1,315,361 is hereby appropriated to fund Phase III, Construction. <br /> Section 5: <br /> The City Treasurer of the City of Everett is hereby authorized to issue <br /> construction warrants as funds are required but not to exceed $1,411,775 <br /> to a local bank for interin construction financing at a reasonable rate of <br /> interest. <br /> Section 6: <br /> The sum of $1,411,775 is hereby appropriated to Fund "MAPLE HEIGHTS <br /> BRIDGE REPLACEMENT" for the purposes herein specified in the following <br /> II manner: <br /> A. Phase II Design 'FUND 321-541-51-000-31-694-155) <br /> Detail Design by Consultant $50,600 <br /> (Howard Needles Tammen & Bergendoff) <br /> Right-of-Way 7,000 <br /> In-house Engr. and Admn. 38,814 <br /> TOTAL $96,414 <br /> Source of Funds <br /> Phase II Design <br /> F.A.M. $76,124 <br /> Gas Tax 20,290 <br /> TOTAL $96,414 <br /> B. Phase III Construction (FUND 321-541-51-000-65-694-155) <br /> Construction Contract (As per low bid) $1,095,827.00 <br /> Engineering 15% 164,374.00 <br /> Contingency 11,085.00 <br /> Audit 1,500.00 <br /> Art Fee & Interest 42,575.00 <br /> TOTAL $1,315,361.00 <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.