My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 540-78
>
Ordinances
>
Ordinance 540-78
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/2/2018 11:48:52 AM
Creation date
10/2/2018 11:48:51 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
540-78
Date
8/16/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Section 2: <br /> Authorization is hereby given to provide for the design, construction, <br /> and associated activities or administrative actions required to provide <br /> the following: <br /> I. Riverside Neighborhood Improvements <br /> a. Conduct an independent audit of property tax assessments in <br /> Riverside and comparable neighborhoods for comparison <br /> (See Section 4) , <br /> b. Purchase a covered play area (approximately 5000 square feet) <br /> for Garfield School (See Section 3) . <br /> c. Provide for purchase of lawn mower, gas and lawn and garden <br /> tools for use in neighborhood rent-a-kid program. <br /> d. Purchase materials necessary for experimental neighborhood <br /> recycling program. <br /> e. Install curbs both sides. <br /> 25th Street - Harrison to Cleveland, and <br /> McDougall to Virginia <br /> f. Install new sidewalk and curb: <br /> East Grand; 25th to Everett Ave. - E. side <br /> Highland; 21st to 23rd - E. side <br /> 19th; Summit to Walnut - N. side <br /> Walnut; 22nd to 24th - W. side <br /> 25th; Walnut to Baker - S. side <br /> g. Widen street and install curb and parking as per Garfield Park <br /> Conceptual Plan on 24th Street between Walnut and State. <br /> h. Sidewalk Repair: <br /> 25th; East Grand to Cleveland - N. side (45') <br /> 25th; East Grand to Cleveland - S. side (60') <br /> Highland; 24th to 25th - E. side (110') <br /> Highland; 2300 Block - W. side (15') <br /> State; 2300 Block - E. side (110') <br /> Walnut; 2100 Block - E. side (30') <br /> Chestnut; near 2613 - E. side (35') <br /> Maple; 2400 Block - E. side (70') <br /> Cedar; near 24th - E. side (15') <br /> Cedar; 2200 Block - E. side (15' ) <br /> 26th; and McDougall - Northwest Corner (15' ) <br /> 24th; and McDougall - E. side (50') <br /> 24th; Virginia to Baker - S. side (20') <br /> 24th; near 2302 - S. side (30') <br /> Virginia; near 2109 - E. side (15') <br /> IT. Port Gardner Neighborhood Improvements <br /> a. Install new curb and sidewalk with inlets as required: <br /> 35th (Federal to Friday) - S. side (400' ) <br /> Federal (35th to Mukilteo) - E. side (3600') <br /> Edwards (Federal to Friday) - S. side (400') <br /> 35th (Colby to Wetmore) - N. side (250') <br /> Norton (Clinton to Grand) - E. side (300') <br /> Grand (Norton to 41st) - E. side (1500') <br /> Kromer (Pacific to Laurel) - W. side (420' ) <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.