My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/10/03 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/10/03 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2018 10:25:08 AM
Creation date
10/9/2018 10:24:40 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/3/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
90
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
8.5. Compliance with Applicable Codes 1919 <br /> 8.5.1. City Construction Codes 19 <br /> 8.5.2. Visual Impact 19 <br /> 8.5.3. Safety Codes 19 <br /> 8.5.4. One Call 19 <br /> 8.6. GIS Mapping 19 <br /> 8.7. Minimal Interference 20 <br /> 8.8. Prevent Injury/Safety <br /> 8.9. Underground Construction and Use of Poles 20 <br /> 210 <br /> 8.10. Electrical Bonding 21 <br /> 8.11. Repair and Restoration of Property 21 <br /> 8.11.1. General 21 <br /> 8.11.2. Rights-of-Way and Other Public Property 22 <br /> 8.11.3. Private Property 22 <br /> 8.12. Discontinuing Use/Abandonment of Facilities 22 <br /> 8.13. Reservation of City Use of Right-of-Way 22 <br /> 8.14. Tree Trimming 23 <br /> 8.15. Tnspection of Construction and Facilities 23 <br /> 8.16. Stop Work 23 <br /> 8.17. Work of Contractors and Subcontractors 23 <br /> 8.18. Construction Bond 24 <br /> 9. RELOCATION AND MOVEMENT OF FACILITIES 24 <br /> 9.1. Movement of Telecommunication Facilities For City Purposes 25 <br /> 9.2. Relocation of Telecommunication Facilities for Others 25 <br /> 9.3. Temporary Changes for Other Permitees 25 <br /> 10. ADDITIONAL FACILITIES 25 <br /> 10.1. Grantee to Provide Additional Facilities 25 <br /> 10.2. Notice of Incremental and Fully Allocated Costs 25 <br /> 10.3. Grantee to Furnish Additional Facilities 26 <br /> 10.4. Contract and Compliance with RCW Chap. 80.36 26 <br /> 10.5. Subsequent Responsibility for Fully Allocated Costs 26 <br /> 11. FRANCHISE VIOLATIONS,REVOCATION AND TERMINATION 26 <br /> 11.1. Procedure for Remedying Franchise Violations <br /> 11.2. Termination 26 <br /> 287 <br /> 11.3. Procedures in the Event of Termination or Revocation 28 <br /> 11.4. Alternative Remedies 29 <br /> 11.5. Failure to Apply, Construct, or Acquire 9 <br /> 12. FRANCHISE TRANSFER 2 29 <br /> 13. MISCELLANEOUS PROVISIONS <br /> 13.1. Notices 30 <br /> 310 <br /> 13.2. Descriptive Headings 31 <br /> 13.3. Costs and Expenses to be Borne by Grantee 31 <br /> 13.4. Binding Effect 31 <br /> 13.5. Authority to Amend 31 <br /> 13.6. No Joint Venture 31 <br /> 13.7. Waiver <br /> Seattle SMSA Limited Partnership <br /> (Verizon Wireless) 2 3f 33 <br /> Small Cell Franchise <br />
The URL can be used to link to this page
Your browser does not support the video tag.