My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 501-78
>
Ordinances
>
Ordinance 501-78
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/9/2018 11:19:31 AM
Creation date
10/9/2018 11:19:31 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
501-78
Date
2/15/1978
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. .7.-67-71 <br /> AN ORDINANCE creating a special construction fund entitled <br /> 19th Ave. SE (SR 5 to 112th St. ) and appropriating $1, 460, 000 <br /> for the design and construction of this street widening project. <br /> WHEREAS, the City Council of the City of Everett is aware of <br /> the heavy traffic volumes and high numbers of automobile <br /> accidents presently occuring on 19th Ave. S. E. , and <br /> WHEREAS, the City Council is also aware of the potential <br /> growth of the residential areas adjacent to and in the vicinity <br /> of 19th Ave. which will result in even higher traffic volumes <br /> and additional hazards, delays, and inconvenience to local <br /> residents, and <br /> WHEREAS, 19th Ave. (SR 5 to 112th St. ) is on the Six Year Construc- <br /> tion Program adopted by the City Council by Resolution No. 1314 <br /> on June 29, 1977, and <br /> WHEREAS, on September 28, 1977 the City did submit to the State <br /> of Washington Urban Arterial Board a project prospectus for fund- <br /> ing the design, preparation of plans, specifications, cost estimate , <br /> right-of-way acquisition, and construction of 19th Ave. S. E. from <br /> SR 5 to 112th St., and <br /> WHEREAS, the Urban Arterial Board did approve the project in the <br /> amount of $1, 460, 000 (UAB $1, 314, 000/City $146, 000) as requested <br /> in the City's project prospectus on the condition that the project <br /> be under contract for construction within 18 months from the date <br /> of authorization, January 19, 1978. <br /> NOW, THEREFORE, BE IT ORDAINED THAT: <br /> Section 1. A special construction fund is hereby established as <br /> Fund No. 323 entitled "19th Avenue S. E. (SR 5 to <br /> 112th St. ) Street Widening" for the design, construction, <br /> and associated activities required to construct the <br /> improvements defined in the following sections: <br /> • Section 2. Authorization is hereby given to provide for construction <br /> of improvements to 19th Ave. S. E. between SR 5 and <br /> 112th St. , which will result in widening the street's <br /> curb to curb width to 67 feet which will provide two <br /> traffic lanes and a bike lane in each direction, a two <br /> way left turn lane along the center of the street, side- <br /> walks and curbs and gutters on both sides of the street, <br /> a storm sewer system and other utility relocations, street <br /> lighting, traffic signals, identification signs, and other <br /> minor items of work as may be necessary to implement <br /> these improvements. <br /> Section 3. Authorization is hereby given to select and negotiate <br /> an agreement with a consulting engineering firm to <br /> do preliminary engineering, environmental assesment, <br /> detailed design, and prepare right-of-v, ay plans, <br /> construction plans, specifications and cost estimate <br /> for construction of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.