Laserfiche WebLink
RETAINING WALL SCHEDULE <br /> WALL GEOMETRY WALL REINFORCING METAL STUD WALL <br /> - r ' " <br /> PER ARCH.DWGS. = 411M <br /> MAX. <br /> " �„„ B 1 KEY DEPTH - f <br /> "H "" "K" "S"BARS "F"BARS JOINT SEALANT,TYP. <br /> - ENGINEERING <br /> METAL STUD WALLMETAL STUD WALL >> MAIN STREET,SUITE 106 <br /> $'-0" 1'-2" t'-6" 3'-6" 8" - #5 ®15" #5 0 15" I FILLER,TYP. EDMONDS,WASHINGTON 98020 <br /> .1„j/2" PER ARCH.DWGS. PER ARCH.DWGS. PHONE (425 778-8500 <br /> (2)-#5 x CONT.TOP SLAB ON GRADE AND SUBGRADE FAX (423)778-5536 <br /> 6'-0" 1'-0" 1'-0„ 2'-6" 8" - #5 0 15" #5 0 15" <br /> PER FOUNDATION PLAN JOINT SEALANT,TYP. <br /> rz-JOINT <br /> SEALANT,TYP. <br /> 4'-0" I'-0" 0'-8" -r1'-6" 8' — <br /> #5(8 15" #5 0 15" ,' , / <br /> tie -. (2)-#5 x CONT.TOP " 7-FILLER,TYP. 5LA6 ON GRADE FILLER,TYP.2'-0" 1'--0" I 0'-8" 0'-8" 8" - #5 0 15" #5 0 15" x -�.�:,�:;:'::�;•..;,.; 1/2AND SUBGRADE PER /2" <br /> SLAB ON GRADE w a ' 0.6' 0'6 �' -SLAB ON GRADE AND SUBGRADC <br /> AND SUBGRADE PER a 2 �: °° SLAB ON GRADE PER FOUNDATION PLAN FOUNDATION PLAN /SLAB ON GRADE AND SUBGRADE <br /> FOUNDATION PLAN >�+ :b AND SUBGRADE PER PER FOUNDATION PLAN <br /> -"- FOUNDATION PLAN ____F <br /> NOTES' p #5 0 15"at.,EA.WAY ;,...,:e.,..-,-:,,.,.,,,.:,. .',..'<ps' ....,.:..,:. <br /> s°,° q`�° .:•°b _ :•.,,,,,• :•Oa o ,.per _ <br /> 1.FOUNDATION MUST BE ON UNDISTURBED SOIL. --•_•^- A2. <br /> " �"'°•••', CO �- •.• fib'' °•.•a o z_ <br /> 2.BEARING CAPACITY=2000 P�= b:.:�,`6a� 5. <br /> ic: ',N <br /> 3.EQUIVALENT FLUID PRESSURE 30 pcf + 30 PSF SURCHARGE ,; . $•pt O �. g ° ` b4.CONCRETE STRENGTH f'c. 3000 psi : s .., /�.//�.//, O .�i‘-'\-\-1-\\2\/, <br /> 5.STEEL REINFORCING fr60 ksi 7/)//i.//, ���• i g _ <br /> ��` <br /> (2)-#5 x CONT.,BOTTOM v v /i. �./, <br /> (2)-#5 x CONT.,BOTTOM 1D" (2)-#5 x CONT.,BOTTOM <br /> 5" 6" 5" ALTERNATE HOOK AS SHOWN #5 0 15"O.C. 10" G�gor w��1, <br /> TOP OF WALL SECTION G" so % <br /> .', © SCALE: 1"=1'-a" 3 SECTION0 SECTION <br /> `D METAL STUD WALL 1 1-0 <br /> SCALE: 1".-1'-a" f r` ,• <br /> PER ARCH.DWGS. <br /> ----911 -111-1-W. <br /> _ ` 1 5 x CONT. NAii' <br /> JOINT SEALANT O-# " 2'-6" ° <br /> (2)-#5 CONT. 117--;111777,111,--- 111-7111- 2-0 <br /> q�Pi,. " METAL STUD WALL FILLER #4 DOWELS 0 18 O.C. r r- ,..,, <br /> JOINT SEALER _.__�` 2�0 PER ARCH.DWGS. <br /> 1 2" 20 GA.x 2"METAL DECK , <br /> SLAB ON GRADE #4 DOWELS 0 18 / <br /> AND SUBGRADE PER FILLER SLAB ON GRADE AND SUBGRADE AND TOPPiN�S�Ats PER <br /> FOUNDATION PLAN • 1/2" PER FOUNDATION PLAN FLOOR FRAMING NOTES <br /> SLAB ON GRADE #SxCONT <br /> ,_ N <br /> AND SUBGRADE PER <br /> F/2" 1- r <br /> " "'- -- FOUNDATION PLAN �, <br /> mSw . <br /> _ 4. <br /> #5 0 15" O.C. 2"UR. :•°'fl:•°° • <br /> - <br /> •F CONT. HORIZ. '`J BACKFILL WITH .:;•:°' <br /> _ _ �, �r �� a <br /> F 0 FREE DRAINING MATERIAL. /��\ -� _ ���j� SEAT REQ'D. <br /> i./i./, o /-SLAB ON GRADE AND SUBGRADE // <br /> " N:4;,: ;t.''''''',1".: A'' 9° PER FOUNDATION PLAN '\ " <br /> . G °°MIN." / 4 DIA PERF.PIPE • •:°� °��;,pv NOTES: #5 0 8 O.C.VERT. <br /> w "S"BARS 0• WRAPPED WITH ( ••R °:•b " :° ��`���� _ y _ 1.AT SIM.SECTION FLOOR TOPPING • <br /> /��/%/- SLAB AND SLAB ON GRADE TO <br /> Z o FILTER FABRIC '' - <br /> a ASPHALT SLAB ��~!-�:.;.. „ , .£ `�:w <br /> w - SLOPE TO DRAIN O %��%��%/ •.,� ��ar�;• o��+;o p� BE CAST MONOLITHICALLY W/0 " <br /> '� EXPANSION JOINT. <br /> �------ �'o .` i '.. --a• /Y,(//,'/, ..;"..• Fpg0pv #5 0 15 O.C.HORIZ. <br /> Z /i��/, N. �b �b 2.REFER TO DETAIL 7/S-8 FOR + <br /> • °' 0 O (2)-#5 x CONT.,BOTTOM �' 8" ;///,/A..//,//�/�-__,__ FOOTING AT BASE OF CONC.WALL. <br /> I I-111 <br /> , -� --�,., o o4O. oQ °9°O _ N j 1'-D" MIN. I <br /> z 0SECTION SECTION 10" - SECTION -4( <br /> o <br /> '� n = o ° o '• SCALE: i" 1'-0" S SCALE:1" 1'-0' <br /> CD, <br /> SCALE: 1i-Q'� _- z a <br /> n v - D(5)`) <br /> � C o, <br /> • t Oo O 1= o <br /> t <br /> M "F"BARS w 0.a <br /> #4 0 12"o.c. ° N <br /> #4 CONT. "S"BARS (2)-#5 x CONT. - <br /> co <br /> TREAT SURFACE W/ #4 NOSING BAR,TYP. < <br /> ° .o <br /> 0 12"o.c. "T" "t" "B" SLAB ON GRADE AND BOND BREAKER PRIOR "''- <br /> f / / / SUBGRADE PER TO CASTING STAIR RISE AND RUN PER "'•- <br /> FOUNDATION PLAN ARCH.DWGS. x <br /> Q <br /> 0 TYPICAL RETAINING WALL DETAIL <br /> . o o 11L6 x 3 1/2 x 5/16 x CONT. <br /> �A.B.0 32 Des:�tv: <br /> SCALE: NTS <br /> _ w/3/4 o.c. FU <br /> DRAWN: SI( <br /> if b ti , � CCC <br /> ° •••• ;•b • • ~ Mi CHECK: <br /> 3 i6 X3012 <br /> ,4��i\,j�\� \"! c, 3 1613012Iiik 8"CMU WALL JOB NO: 98072 <br /> MEINI1111•111 in - gin <br /> (1)-#5 x CONT. \ 1110Mg BOND <br /> �`�V�`'`��` FLOOR BDIAPHRAGM <br /> 3"SEAT REQ D. 20 GA.x 2"METAL DECKING <br /> (2)-#5 x CONT.,TYP. �--.- #4 0 12"O.C.EA.WAY AND TOPPING SLAB INSTALLEDir <br /> 2'-6" <br /> 20 GA.X 2" PER FLOOR FRAMING NOTES <br /> METAL DECKING <br /> tor- #4 DOWELS 0 18"O.C. - " \__ \ <br /> i . #5 0 8 O.C.,VERT. AND TOPPING SLAB PER <br /> PER <br /> `V W/EVERY OTHER BAR FLOOR FRAMING NOTES ANDOIST SCHEDULE WN <br /> EXTENDING TO SLAB <br /> NOTE: CONNECTION TO TS AL <br /> ON GRADE <br /> REFER TO DETAIL 7/S-8 COL.BEYOND PER \�'� <br /> FOR FOOTING AT BASE #5 0 15"0.C.HORIZ. DET. 12/2-12 I <br /> OF CONC.WALL <br /> 1'-0" <br /> 08 SECTION <br /> SCALE: 1"=1'-0" - g CALE:SECTION 1,y0 <br /> " <br /> 0 <br /> _J <br /> 20 GA. x 1 1/2"METAL Q <br /> DECKING INSTALLED PER <br /> ROOF FRAMING NOTES L3 x 3 x 3/16"x CONT. W <br /> 3/16 D „,.„1/2"CLR. <br /> ›- Z CI <br /> 37161/ 3 16. a <br /> 0 o I <br /> 3 16/ '� ` ; 8"CMU WALL <br /> <z z z <br /> r-1 i-1 —`1 n 1 . t f.`.1 .!-_L 1-'".1 r"_l ,�} W <br /> � J i 20 GA.x 1 1/2"DECKING gill = Q <br /> INSTALLED PER ROOF FRAMING \ NOTES: 0 W <br /> PLAN NOTES ` 1. STEP BONO BEAM AS REO'D O 0 Q <br /> EN �� 3 <br /> i i s �� --%..i •. TO MATCH SLOPE OF ROOF. W Z I <br /> S / \ ',� 3/4"4 A.B.0 48"O.C. 2. AT SIM.SECTION REMOVE FACE Z W Q <br /> ����'� (2)-3/4"0 A.B.EA. SHELL AS REQ'D ALONG EXIST. <br /> o c° V <br /> WALL TO INSTALL BOND BEAM <br /> ...........1 I 1 I I/' .; ; ANGLE LEDGER AND A.B. <br /> ` <br /> sills (2)-#5 x CONT.TYP. Ohl TBOND <br /> WALL UPON L+J <br /> JOIST PER PLAN AT EA.RUN OF A.B. ? <br /> AND SCHED. irs COMPLETION. - <br /> SHEET: <br /> JOIST PER PLAN L4 x 4 x 1/4"x 1'-0" s <br /> &SCHED., TYP. CENTERED BELOW JOIST `��� <br /> BEAM PER PLAN S 1 3 <br /> """ <br /> p SECTION SECTION 13(00331 <br /> 1 <br /> SCALE: 1"=1T-0' SCALE: 1"=1'-0" <br /> 6816 Evergreen Way <br /> OF: 13 SHEETS <br /> 1 <br />