PLUMBING SPECIFICATIONS FOR GENERAL CONTRACTOR
<br /> GENERAL NOTES:
<br /> 1. THE WORK CONSISTS OF FURNISHING ALL LABOR,EQUIPMENT AND MATERIALS TO PROVIDE A COMPLETE AND PROPER
<br /> FUNCTIONING SYSTEMS OF PLUMBING,SEWERS,WATER PIPING,ETC..ALL PLUMBING MATERIALS AND WORKMANSHIP SHALL PLUMBING NOTES:
<br /> CONFORM TO ALL STATE AND LOCAL CODES. 1. ALL PIPING SHALL CONFORM TO LOCAL PLUMBING CODE STANDARDS(LATEST)
<br /> 2. THE SCOPE OF WORK INCLUDES,BUT IS NOT LIMITED TO FURNISHING, INSTALLING AND TERMINATING PER THESE DRAWINGS 2. G.0 PLUMBER SHALL PROVIDE ALL REQUIRED SHUT-OFF VALVES,UNIONS AND FITTINGS.
<br /> AS WELL AS MACNEIL'S AND OTHER SUPPLIER'S INSTALLATION MANUALS. PROVIDE ALL VALVES(BACKFLOW PREVENTERS)AS REQUIRED BY CODE.
<br /> 3. ALL PIPING IS SHOWN DIAGRAMMATIC ONLY,EXACT LOCATION SHOULD BE DETERMINED ON SITE.ALL EXISTING JOB CONDITIONS 3. G.0 PLUMBER IS RESPONSIBLE FOR INSTALLING ALL HARD PIPING(WATER,AIR&GAS)
<br /> SHALL BE VERIFIED.CONTRACTOR SHALL SCALE THE NON-DIMENSIONED WORK AT HIS OWN RESPONSIBILITY AND ALL UNDERGROUND RUNS AND CHASES WITH PULL STRINGS
<br /> 4. THE GENERAL CONTRACTOR SHALL COORDINATE ALL WORK IN FIELD WITH THAT OF OTHER TRADES,INCLUDE MODIFICATIONS 4. G.0 PLUMBER SHALL PROVIDE AND INSTALL ALL GAS SUPPLY PIPING AND CONNECTIONS
<br /> RELOCATIONS OR ADJUSTMENT NECESSARY TO COMPLETE WORK OR TO AVOID INTERFERENCE. VENTING AND ANY INTERCONNECTING PIPING FROM MANIFOLDS,BOXES,PUMP OR
<br /> 5. OBTAIN ALL PERMITS AND INSPECTIONS REQUIRED BY STATE AND LOCAL LAWS AND ORDINANCES. ARRANGE FOR INSPECTIONS RELATED EQUIPMENT W/SUITABLE SPEC MATERIALS.
<br /> AND TESTS THEREWITH AND PAY ALL FEES AND COSTS FOR THE PERMITS,INSPECTIONS AND TESTS.UPON COMPLETION OF 5. G.0 PLUMBER SHALL RUN TRUNK LINES TO PUMPS,RO SYSTEM,TANKS AND CHEMICAL
<br /> WORK,THE CONTRACTOR SHALL PROVIDE OWNER WITH CERTIFICATES OF FINAL COMPLETION AND INSPECTION FROM
<br /> AUTHORITIES HAVING JURISDICTION. DISTRIBUTION HYDRO MINDERS,REDUCING THE FEEDS TO THESE EQUIPMENT AS SHOWN
<br /> ON THE DRAWING.TERMINATE CONNECTIONS AT EACH PIECE OF EQUIPMENT AND SUPPLY
<br /> 6. THE ENGINEER/OWNER SHALL BE NOTIFIED OF ANY REQUESTED CHANGES BY LOCAL AUTHORITIES PRIOR TO COMMENCEMENT OF WORK. A BALL VALVE WITH FEMALE THREADED ADAPTER OF APPROPRIATE SIZE.CAR WASH
<br /> ANY WORK INSTALLED BEFORE APPROVAL IS OBTAINED FROM THESE AUTHORITIES SHALL BE CORRECTED WITHOUT CHARGE. INSTALLER TO MAKE CONNECTIONS FROM BALL VALVE TO EQUIPMENT.
<br /> 7. CONTRACTOR SHALL INFORM THE ENGINEER/OWNER DURING BIDDING OF ANY PROBLEMS IN MEETING THE REQUIREMENTS OF AUTHORITIES RECLAIM PIPING:
<br /> HAVING JURISDICTION,ANY COST SAVING ITEMS OR METHODS,AND OF ANY DISCREPANCIES IN THE WORK.
<br /> 1. ALL RECLAIM DRAINAGE LINES.SUCTION LINES,OZONE TREATMENT LINES AND RELATED
<br /> 8. ALL MATERIALS PROVIDED SHALL BE NEW AND OF TOP QUALITY AND OF UNIFORM PATTERN THROUGHOUT THE PROJECT,UNLESS NOTED OTHERWISE. FITTINGS SHALL BE SCHEDULE-80 POLYVINYL CHLORIDE(PVC)PIPING,UNLESS OTHERWISE NOTED.
<br /> 9. THE CONTRACTOR SHALL GUARANTEE THAT ALL THE EQUIPMENT,MATERIALS AND WORKMANSHIP SHALL BE FREE FROM DEFECTS FOR A PERIOD 2. G.0 PLUMBER IS RESPONSIBLE FOR RUNNING UNDERGROUND PIPING FROM OUTSIDE
<br /> OF ONE YEAR AFTER FINAL ACCEPTANCE. ANY WORK WHICH APPEARS DEFECTIVE WITHIN ONE(1)YEAR AFTER THE WRITTEN ACCEPTANCE TANKS TO RECLAIM UNIT
<br /> BY THE OWNER,SHALL BE REPAIRED AND/OR REPLACED BY THE CONTRACTOR AT HIS OWN COST.THIS WILL INCLUDE ANY REPAIR REQUIRED TO
<br /> OTHER ITEMS,MATERIALS OR EQUIPMENT DAMAGED DUE TO THE DEFECT. PNEUMATIC LINES
<br /> 10. THE OPENING SIZES IN THE ROOFS,WALLS AND FLOORS ARE BASED ON THE EQUIPMENT NAMED. IT SHALL BE THE RESPONSIBILITY OF THE 1. ALL PNEUMATIC SUPPLY LINES SHALL BE TYPE-K COPPER TUBE WITH WROUGHT COPPER OR
<br /> CONTRACTOR TO VERIFY ALL DIMENSIONS.IF THE EQUIPMENT SUPPLIED IS DIFFERENT THAN NAMED,THEN THE CONTRACTOR SHALL BE RESPONSIBLE . SWEAT FITTINGS ABOVE GRADE.NO FITTINGS SHALL BE ALLOWED BELOW GRADE.
<br /> FOR THE NECESSARY MODIFICATIONS AT HIS OWN COST. SHUT OFF VALVES TO BE PROVIDED BY G.0 PLUMBER AS SHOWN ON DRAWINGS.
<br /> 11. ERECT ALL EQUIPMENT IN COMPACT,NEAT AND WORKMANLIKE MANNER.ALIGN,LEVEL AND ADJUST FOR SATISFACTORY OPERATION. INSTALL AND
<br /> START-UP ITEMS OF EQUIPMENT IN COMPLETE ACCORDANCE WITH THE MANUFACTURER'S PRINTED INSTALLATION AND OPERATING MANUALS. PRESSURE TEST
<br /> 12. THE CONTRACTOR SHALL PROPERLY PROTECT ALL EXISTING FINISHES,FURNITURE,EQUIPMENT,WALLS,CEILINGS,ETC.,AT ALL TIMES DURING LEAVE UNCOVERED AND UNCONCEALED ALL WATER DISTRIBUTION PIPING UNTIL IT IS TESTED
<br /> THE PROGRESS OF THE WORK,TO THE ARCHITECT/OWNER'S SATISFACTION. AND APPROVED.REQUIREMENTS ARE MINIMUM AND ARE NOT INTENDED TO BE LIMITING WHERE
<br /> ADDITIONAL TESTING METHODS ARE REQUIRED BY THE AUTHORITY HAVING JURIDICTION.
<br /> 13. UPON COMPLETION OF THE WORK,REMOVE ALL SURPLUS AND WASTE MATERIAL FROM THE PREMISES AND LEAVE ALL ITEMS IN PERFECT ORDER
<br /> AND READY FOR OPERATIONS.
<br /> 14. ALL PIPING AND DUCTWORK SHALL BE PROPERLY SUPPORTED WITH NECESSARY AND SUITABLE HANGERS,SADDLES,STRUCTURAL SUPPORTS
<br /> AND/OR BRACKETS. PROVIDE AND INSTALL ALL INSERTS REQUIRED.
<br /> 15. ALL PIPING SHALL BE PRESSURE TESTED AS REQUIRED,IN THE PRESENCE OF ENGINEER/OWNER.FURNISH ALL PUMPS,PIPING AND GAUGES ETC.
<br /> NECESSARY FOR THE TESTS.
<br /> 16. CONCEAL ALL PIPING AND DUCTWORK WHEREVER POSSIBLE IN PARTITIONS,BULKHEADS,WALLS AND BETWEEN FLOORS AND CEILINGS. INSTALL
<br /> ALL PIPES AND DUCTS TO BE CONCEALED NEATLY AND CLOSELY TO THE BUILDING STRUCTURE SO THAT THE NECESSARY FURRING CAN BE KEPT
<br /> AS SMALL AS POSSIBLE.
<br /> THE PLAN BEARING THIS LEGEND AND THE ACCOMPANYING 8 INITIAL8 DATER • ■ II ■ 90 WELHAM ROAD,
<br /> SPECIFICATIONS HAVE BEEN PREPARED BY MACNEIL WASH 7 DATE7 BARRIE ONTARIO,
<br /> SYSTEMS LTD.FOR THE PARTY WHOSE NAME APPEARS IN
<br /> THE TITLE BOX IN CONNECTION WITH THE PROPOSED 6 DATE6 MACNEIL L4N 8Y4
<br /> ERECTION OF AN AUTOMATIC CAR WASH AT THE LOCATION 5 DATE5 CANADA
<br /> SHOWN THEREON.SAME ARE THE EXCLUSIVE PROPERTY OF CUSTOMER qq
<br /> MACNEIL WASH SYSTEMS LTD.AND ARE SUBJECT TO RETURN 4 DATE4 R O D LH N D TOYOTA
<br /> UPON DEMAND.BY THE ACCEPTANCE HEREOF,THE 3 DATES
<br /> PROSPECTIVE CUSTOMER THEREBY AGREES NOT TO2 DATE2 TITLE PLUMBING NOTES
<br /> DIVULGE,USE OR COPY THE SAME WITHOUT THE WRITTEN
<br /> CONSENT OF MACNEIL WASH SYSTEMS LTD. 1 DATEI AND SPECIFICATIONS
<br /> THE INFORMATION CONTAINED HEREIN IS SUBMITTED IN 0 DATEO SCALE: DRAWING REVISION:
<br /> GOOD FAITH AS AN ASSISTANCE IN LAYING OUT THE CAR
<br /> WASH.WE WILL NOT BE RESPONSIBLE FOR ERRORS OR No. By Description Date DATE: OCT. 12,2011 DRAWING NUMBER
<br /> OMISSIONS HEREIN,NOR LEGAL CODE OF UNDERWRITING DRAWN BY: CHK'D BY: ROD—P-1
<br /> FILE PATH: ■ ■ ■ ■ "' �� ■"-� REQUIREMENTS. REVISION RLC XX
<br /> 6816 Evergreen Way 131111-028
<br />
|