CL OF CONVEYOR /--CL OF EQUIPMENT
<br /> CL OF CONVEYOR CL OF EQUIPMENT SEE DETAIL-2 18" 32 1/4" ?' SEE DETAIL-3
<br /> 48 1/2" --
<br /> SEE DETAIL-1 J 16 7/8" -. 32 1/4" " 9 CL OF CONVEYOR 7—CL OF EQUIPMENT
<br /> (TYP) 11 7/8 SEE DETAIL-1X_____LTh_t_r _c L.
<br /> � � 10" I- --� 32 1/4" SEE DETAIL-3
<br /> 41'' 56'' - /
<br /> .d , - SEE DETAIL-4 - "
<br /> 'N- ---, /
<br /> \--
<br /> i I L _
<br /> y 2"CONDur� a �. .—� N 79-- IS 1.a.
<br /> :� t SUPPORTING LEGS Cr{ 4' o o ' i
<br /> e
<br /> I` FABRICATED AT INSTALLATION - PIS ..
<br /> I
<br /> d '44
<br /> F.. a c. e a o a ., ., \J -
<br /> L.
<br /> `i. 9 A
<br /> I SLOPE TO DRAIN i 13 1/4" ,`.
<br /> LOPE TO DRAIN " BOTTOM TIE
<br /> w - DOWN PLATE 4"
<br /> 1 4" 3" SEE DETAIL 6 : ply
<br /> 4"DRAIN PIPE INTO a
<br /> d e d a� ., a
<br /> • CONVEYOR TRENCH
<br /> L___ - J--- 8" DRAIN PIPE
<br /> TO RECLAIM TANK#1
<br /> / 1/8"SLOPE LF
<br /> .
<br /> B—B SECTION D—D SECTION
<br /> CORRELATOR PIT C—C SECTION MIDDLE SECTION
<br /> ENTRANCE END
<br /> 1 4"X 2-1 2"X 2-1 2" 1-1/2"FIBERGLASS
<br /> ANGLE(BY CONTRACTOR) GRATING(BY CONTRACTOR) 1 1 2"FIBERGLASS
<br /> GRATING BY CONTRACTOR 1/2"X 1-1/2"
<br /> STEEL FLAT BAR
<br /> 0 0
<br /> CL OF CONVEYOR /—CL OF EQUIPMENT a_!I ° ° WELDED TO ANGLE
<br /> 1/4"X 1/2"STEEL
<br /> BY CONTRACTOR
<br /> FLAT BAR 1/4„ 3 1/4., 1/4"X 1-1/2°.X 1- 1/2" ° ° ° & o
<br /> 26" 32 1/4" WELDED TO a ANGLE(BY CONTRACTOR)
<br /> Qr s
<br /> 1/4"X 3 3/4" / CORRELATOR THIS ANGLE TO BE WELDED
<br /> SEE DETAIL-2 \._., SEE DETAIL-3 FLAT BAR FRAME AFTER CONCR'7 POUR 1/4"X 2-1/2"X 2-1/2" •
<br /> ,�
<br /> 5 i/2»
<br /> } ANGLE(BY CONTRACTOR
<br /> 1 ( -----,sc,,,,/
<br /> rt A@ 4 .� e T DETAIL—3
<br /> o o 1/4 REBAR DETAIL--
<br /> WELDED To GRATING SEAT
<br /> 3 3/4"FLAT BAR , TIE DOWN ANGLE „
<br /> .1_ -� ® 10”SPACING SCALE 1"=1'-0
<br /> in d - �_.3,3/4A F
<br /> M SCALE 1„+1, 0„
<br /> g d a. PITCH 1/2”
<br /> 1/4" `. .
<br /> dc•
<br /> PIT---ey -_4.¢ 14 "
<br /> \ : ' ' '-'—
<br /> „ % , Itv_ifbiel,
<br /> WO" I 8" DRAIN PIPE 1/4"X 2 1/2"X 2 1/2"
<br /> 6 PVC PIPE 11
<br /> CUT IN HALF R L WATER SEPARATOR TA L—1 a ®---,, ANGLE(BY CONTRACTOR)
<br /> EMBEDED IN CONCRETE 1/8 SLOPE LF CORRELATOR LIP ANGLE '
<br /> E—E SECTION SCALE 2'= 1f-0„ , `a
<br /> EXIT END
<br /> DETAIL-4 •
<br /> TIE DOWN ANGLE
<br /> SCALE 1"=1'-0"
<br /> 19' WASH BAY NOTES:
<br /> CL OF CONVEYOR CL OF EQUIPMENT
<br /> 7-----' 1. SLOPE FLOOR UP 1/4"PER 10'FROM ENTRANCE EDGE OF CONVEYOR
<br /> Or'
<br /> 60" -- AT 29"C/C STEEL PLATE 1/4"X 6" PIT TO THE EXIT EDGE OF THE CONVEYOR PIT
<br /> r r
<br /> X 10?-0", WELD BENT RODS 2 SLOPE TRENCH BOTTOM DOWN 1/8"PER FOOT FROM EXIT OF CONVEYOR PIT TO
<br /> DRIVER SIDE _ 10" -F- PASSENGER SIDE
<br /> ENTRANCE OF CONVEYOR PIT
<br /> 0" GRADE - 32 1/4" T 27 3/4" 0"GRADE!'/A/i a ALL CONCRETE TO BEA MINIMUM OF 6"THICK
<br /> [ ..„„,*_—_---._
<br /> SLOPE PER ENGINEERED SLOPE PER ENGINEERED
<br /> LANS
<br /> FOUNDATION PLANS FOUNDATION P 4. FINISH FLOOR TO HAVEA ROUGH TEXTURE.ie.BROOM FINISH CONCRETE
<br /> .a - g._ a.,d. I �n a 'a a , SO THAT BROOM LINES RUN PERPENDICULAR TO CONVEYOR TRENCH.
<br /> `' ; , !t f / � ��� \ / ,k „ : a`a r E % J / / /A ° i %m/./.\\</(�,% DETAIL-6 (MUST HAVE NON SKID SURFACE.)
<br /> / ,�;, ///// -//,//,/ ,/ a: �,\, \\\\/>\\\\/,\,,/,/\\22\, ;rf ,, \, �,�: \.�,�;\ ,� BOTTOM TIE DOWN PLATE
<br /> �/; \,,: ,,\ ,,\/,,`, %,, IF_ —1- ' / \\./fi /\ ,i�, / �/,`c\/c\,�.�'� / 5. ALL TIE DOWN PLATES, TIE DOWN ANGLES,COVER SEAT STEEL,RE BAR,
<br /> \\\\///\\/\\\\-\/\:\\/\/ .%,`�'` \ 3 a Y\ '`�` \'\,\'�` '`/�` SCALE 2"= 1'�--�" GRATING,DRAINS,CHASE WAYS,PLASTIC SLEEVES AND CONDUIT ARE THE
<br /> \j /\.//\\,/, / t% /i��// //7„%\/// s / r /rte
<br /> /',/k/ R///,—/,//\ (/� //'N\/ \\ \"/ RESPONSIBILITY OF THE CUSTOMER/CONCRETE CONTRACTOR
<br /> �,/>//
<br /> / /\ ,, ° G a _ THE PLAN BEARING THIS LEGEND AND THE ACCOMPANYING 8 DATE8
<br /> . ■ ■ • • 90 WELHAM ROAD
<br /> SPECIFICATIONS HAVE BEEN PREPARED BY MACNEIL WASH •7 DATE7 ■ ■ ■ ■ BARRIE ONTARIO,
<br /> �
<br /> SYSTEMS LTD.FOR THE PARTY WHOSE NAME APPEARS IN
<br /> THE TITLE BOX IN CONNECTION WITH THE PROPOSED 6 DATE6
<br /> MACNEIL L4N 8Y4
<br /> ERECTION OF AN AUTOMATIC CAR WASH AT THE LOCATION 5 DATE5 CANADA
<br /> • SHOWN THEREON.SAME ARE THE EXCLUSIVE PROPERTY OF 4 DATE4 CUSTOMER
<br /> REAR WHEEL PUSH MACNEIL WASH SYSTEMS LTD.AND ARE SUBJECT TO RETURN p�1 D A D TOYOTA
<br /> UPON DEMAND.BY THE ACCEPTANCE HEREOF,THE 3 DATE3 R V A
<br /> CONVEYOR INSTALLATION PROSPECTIVE CUSTOMER THEREBY AGREES NOT TO TITLE
<br /> DIVULGE,USE OR COPY THE SAME WW
<br /> ITHOUT THE RITTEN 2 DATE2 CONVEYOR TRENCH DETAILS
<br /> INSTRUCTION CONSENT OF MACNEIL WASH SYSTEMS LTD. 1 DATE1 REFER TO ROD—C-1
<br /> THE INFORMATION CONTAINED HEREIN IS SUBMITTED IN 0 DATED CALE' .I.,,, 1_. .:
<br /> GOOD FAITH AS AN ASSISTANCE IN LAYING OUT THE CAR 0
<br /> WASH.WE WILL NOT BE RESPONSIBLE FOR ERRORS OR No. By Description Date DATE: OCT 10, 2011 DRAWING NUMBER:
<br /> FILE PATH: ` ,,, _,,,,.. _ —_ _iii OMISSIONS HEREIN,NOR LEGAL CODE OF UNDERWRITING
<br /> REQUIREMENTS. REVISION DRARLC GH D Y ROD-T-2
<br /> 6816 Evergreen Way B1111-028
<br />
|