|
CL OF CONVEYOR \ /—CL OF EQUIPMENT
<br /> CL OF CONVEYOR „,,...„ CL OF EQUIPMENT SEE DETAIL-2 18” 32 1/4"
<br /> 48 11p/2" SEE DETAIL-3 CL OF EQUIPMENT
<br /> - / CL OF CONVEYOR \
<br /> SEE DETAIL-1 16 7/8" 32 1/4" 11 7/8" SEE DETAIL*1 e • mom=.�� -
<br /> 10" � � 32 1/4" SEE DETAIL-3
<br /> (TYP) 'Il,j,
<br /> 1
<br /> 4 Q. SEE DETAIL 4 40 1/2"
<br /> 4
<br /> . 56" ..-1 13 1/4"',,., /
<br /> V
<br /> NN
<br /> 4 L
<br /> /' \ ; ,
<br /> I ( 2„CONDUI 3— J
<br /> ” 6 ��JJ 0 $_:,,,,-
<br /> — — I' oo SUPPORPNG LEGS --- - •
<br /> p1T�. �. \ �" �-
<br /> FABRICATED AT INSTALLATIONe
<br /> a. ��
<br /> d I °. a a.. ..e . 4 ° 4 4 4t W ,a• 13 1/4" e
<br /> ° A.
<br /> 1 0 7....„..,
<br /> I I I 1-1
<br /> 4- a—
<br /> SLOPE TO DRAIN 6 BOTTOM TIE •
<br /> LOPE TO DRAIN ... -E- " DOWN PLATE PICH ,..
<br /> L
<br /> 4 3 SEE DETAIL 6 �' e a ;
<br /> 4"DRAIN PIPE INTO8" DRAIN PIF'E
<br /> LCONVEYOR TRENCH °4 d TO RECLAIM TANK 11
<br /> —'--k J .
<br /> /
<br /> 1/8"SLOPE LF
<br /> ---N___---N___ D—D SECTION
<br /> B—B SECTION
<br /> CORRELATOR PIT C—C SECTION MIDDLE SECTION
<br /> ENTRANCE END
<br /> 1 4"X 2-1 2"X 2-1 2'- 1-1/2"FIBERGLASS
<br /> ANGLE(BY CONTRACTOR GRATING(BY CONTRACTOR) 1 1 2"FIBERGLASS 1/ "X 1-1/2"
<br /> GRATING BY CONTRACTOR STEEL FLAT BAR
<br /> WELDED TO ANGLE
<br /> ° <--`�i o 0 0 o BY CONTRACTOR •
<br /> CL OF CONVEYOR CL OF EQUIPMENT '
<br /> 1/4"X 1/2"STEEL » >•'::.:: .% r/4"X 1-1/2"X 1- 1/2„ 0 0 o r �.. '.
<br /> FLAT BAR 1/4 '' ' 3 1/4 r :a
<br /> WELDED TO • ANGLE(BY CONTRACTOR) ;• .:: .'
<br /> " CORRELATOR THIS ANGLE TO BE WELDED „
<br /> 26" 32 1/4» SEE DETAIL-3 1/4 FLAT BAR FRAME AFTER CONCRETE POUFS 1 ANGLE(BY CONTRACTOR n,
<br /> SEE DETAIL-2 _- •
<br /> 5 1/2"
<br /> a >-'4.-' e 4 °a: p a T
<br /> DETAIL-3
<br /> d c . : a 1/4 REAR e DETAIL-2 GRATING SEAT
<br /> • - ° o � WELDED TO . °,. .. .a rr
<br /> 3 3/4"FLAT BAR a;. TIE DOWN ANGLE SCALE 1"=1:-0"
<br /> �] ® ro"SPACING J • y SCALE 1"=1'---0„
<br /> fr, a, a
<br /> e' a 3e 3/4 A�—
<br /> d '
<br /> a ee PITCH 1/2" "'
<br /> 1/4"
<br /> ° e ° e
<br /> mrimar
<br /> V\ °
<br /> PITCH 4"
<br /> N 4" ,. d a ° i
<br /> e
<br /> "1--- PI '•� a ,�.a ,; <' -
<br /> 'a a eel
<br /> 8" DRAIN PIPE _ 1 ANGLE 2 1/2"
<br /> (BY CONTRACTOR)2"X / "
<br /> 6"CU PVC T IN ALF e e •IL WATER SEPARATOR DETAIL 1
<br /> EMBEDED IN CONCRETE 1/8"SLOPE LF • •4 '
<br /> CORRELATOR LIP ANGLE
<br /> E —E SECTION SCALE 2"= 1l-0" °
<br /> EXIT END DETAIL-4 •
<br /> TIE DOWN ANGLE 0
<br /> SCALE 1"=1'-0"
<br /> NOTES:
<br /> l9' WASH BAY
<br /> CL OF CONVEYOR CL OF EQUIPMENT 1. SLOPE FLOOR UP 1/4"PER 10'FROM ENTRANCE EDGE OF CONVEYOR
<br /> STEEL PLATE 1/4"X 6" PIT TO THE EXIT EDGE OF THE CONVEYOR PIT
<br /> X ro'"o, WELD BENT RODS 2. SLOPE TRENCH BOTTOM DOWN 1/8"PER FOOT FROM EXIT OF CONVEYOR PIT TO
<br /> / � so � • ENTRANCE OF CONVEYOR PIT
<br /> PASSENGER Slp�' „
<br /> /DRIVER SIDE � 10" F " _ » /
<br /> 32 1/4 27 3/4 0 GRADE 3► ALL CONCRETE TO BEA'MINIMUM OF 6 THICK
<br /> / 0 GRADE \ I
<br /> " SLOPE PER ENGINEERED
<br /> SLOPE PER E RTO HAVEA ROUGH TEXTURE.ie.BROOM FINISH CONCRETE
<br /> ENGINEERED PLANS 4. FINISH FLOG
<br /> FOUNDATIONFOUNDATION PLANS v �. :. .e SO THAT BROOM LINES RUN PERPENDICULAR TO CONVEYOR TRENCH.
<br /> 4 e �.._.__......_._._ . .4 � � ... � d• . .. •..: . ,-'. �. : ' � • :.. MUST HAVE NON SK/D CEas :'�,. , 4 °� .e .4ji
<br /> � , •• °'a •. •1• DETAIL""6 ( SURFACE)
<br /> / •�/ '/ �/ '/ '/ 'i � � ° � ° �:,i:::\/.\, \/ \/ X/� �/X/�j�/�% /._/_ /_,ai
<br /> \ \\ \� \� \\\��`\ : r\ \\ \\ \\ \ \ \ \\ \\/\\i\ BOTTOM TIE DOWN PLATE 5, ALL TIE DOWN PLATES, TIE DOWN ANGLES,COVER SEAT STEEL,RE BAR,
<br /> \ EARTHS d-f / / /
<br /> \/\/\/\// // ,, �! �� ///////// /, PLASTIC SLEEVES AND CONDUIT ARE THE
<br /> • \/\/\/\\/\\/\\./\ • ;..a y\\ \\ \\ \\ \\ \\ \\ SCALE 2 -- 1 -�0 GRATING,DRAINS,CHASE WAYS,
<br /> \\/\\/\/r\/\/\� a /\/ RESPONSIBILITY OF THE CUSTOMER/CONCRETE CONTRACTOR.
<br /> \/\\/\\/\ e ��/ THIS LEGEND AND THE ACCOMPANYING 8 DATER • II ■ II 90 WELHAM ROAD,
<br /> \,\\•'4 ° / /\ THE PLAN BEARING
<br /> SPECIFICATIONS HAVE BEEN PREPARED BY MACNEIL WASH MOON O N
<br /> f 7 DATE? BARRIE ONTARIO,
<br /> SYSTEMS LTD.FOR THE PARTY WHOSE NAME APPEARS IN
<br /> THE TITLE BOX IN CONNECTION WITH THE PROPOSED 6 DATE6 1I'7I C ,'L L4N 8Y4
<br /> ERECTION OF AN AUTOMATIC CAR WASH AT THE LOCATION 5 DATES CANADA
<br /> • SHOWN THEREON.SAME ARE THE EXCLUSIVE PROPERTY OF DATE4 CUSTOMER
<br /> MACNEIL WASH SYSTEMS LTD.AND ARE SUBJECT TO RETURN 4 R O D L.A N D TOYOTA
<br /> REAR WHEEL PUSH UPON DEMAND.BY THE ACCEPTANCE HEREOF,THE 3 DATES
<br /> CONVEYOR INSTALLATION PROSPECTIVE CUSTOMER THEREBY AGREES NOT TO DATE2 TITLE
<br /> DIVULGE,USE OR COPY THE SAME WITHOUT THE WRITTEN 2 CONVEYOR TRENCH DETAILS
<br /> INSTRUCTION
<br /> CONSENT OF MACNEIL WASH SYSTEMS LTD. 1 DATE1 REFER TO ROD—C-1
<br /> THE INFORMATION CONTAINED HEREIN IS SUBMITTED INDATEDSCALE: -�it 1", Ii:
<br /> GOOD FAITH AS AN ASSISTANCE IN LAYING OUT THE CAR 0 0
<br /> Description Date DAA: OCT 10, 201 1 DRAWING NUMBER:
<br /> _ • WASH.WE WILL NOT BE RESPONSIBLE FOR ERRORS OR No. By p -
<br /> OMISSIONS HEREIN,NOR LEGAL CODE OF UNDERWRITING DRAWN BY: OHK'DBY: ROD—T-2
<br /> PALE PATH: __ ii �. ® 111 --W...,."".�s REQUIREMENTS. REVISION RLC XX
<br /> ,
<br /> •
<br /> 6816 Evergreen Way 81111-028
<br />
|