Laserfiche WebLink
PROVIDE <br /> CORNER BARS TO STD.HOOK AT CORNER BARS TO CORNER BARS TO CORNER BARS TO <br /> MATCH EXTERIOR END OF INSIDE MATCH GROSS WALL MATCH HORIZ.REINF. MATCH CR055 WALL <br /> HORIZ.REINF. HORIZ.REINF. HORIZ.REINF. HORIZ.REINF. REINFORCING SPLICE AND <br /> (ALTERNATE HOOK DEVELOPMENT LENGTH SCHEDULE <br /> - .-t— . . ... DIRECTION) 10d <br /> Iv <br /> r . <br /> , . . , ..• .t <br /> . , • ____- Not). (FOR GRADE 60,UNCOATED BARS,NORMAL WEIGHT CONCRETE) <br /> • N. All a 0 -8 <br /> ._ <br /> ADDITIONAL ADDITIONAL <br /> VERT.BARS TYP.CORNER VERT.BARS • • 45° 0 MINIMUM STRAIGHT DEVELOPMENT LENGTH FOR BARS IN TENSION F5 & <br /> BAR: LbLi_ W <br /> 3000 PSI f'c = 4000 PSI <br /> -31- BAR BAR <br /> f // ' ___:_±:___\ • —t--\ <br /> 111 SIZE TOP BARS OTHER BARS SIZE TOP BARS OTHER BARS 01 <br /> I i <br /> I . CROSS WALL <br /> . CROSS WALL #5 21" 16" #3 15" 14" <br /> *4 28" 22" *4 25" 11" CO <br /> END BAR _=9 —\ HOOK. *5 36" 21" *5 31" 24" 0 0 <br /> 27HOOK MAY BE SKEWED 150° <br /> SPANDREL STIRRUP BEAM STIRRUP COLUMN TIE #6 43" 55" #6 31" 28" <br /> * TO MAINTAIN COVER #1 62" 45" #1 54" 42" <br /> d . DIAMETER OF BAR #8 II" 55" #8 62" 41" <br /> #1 50" 62" *1 10" 54" <br /> POLftE CURTAIN SINGLE CURTAIN <br /> WAS 'ett, <br /> NOTE: # 10 V' 10" # 10 15" 60" S '',1# ./. <br /> '1111:416, 'A <br /> SEE SCHEDULE FOR 02° #II 100" 71" #I I Er" 61" -/ it,, v) <br /> 007 7 ' <br /> SPLICES 4 DEVELOPMENT - *- <br /> LENGTHS PLAN VIEW <br /> ..... 11 • NOTE: <br /> "TOP BARS"ARE HORIZONTAL BARS w/MORE THAN 12"DEPTH OF CONCRETE / <br /> t <br /> cvgis <br /> TYPICAL CORNER AND MU.END BAR ARRANGEt.ENT AT CONCRETE WALLS OR FOOTINGS SCALE:NONE 2 <br /> D I.5H <br /> )' / / <br /> x 11/2"PREMOLDED ADD(2)#5 MIN. 3,-0"MIN. Ira: f'c = 4000 PSI <br /> CO .. <br /> CONT.MASTIC JOINT STRIP. DIAG. IN WALL SEE SCHEDULE III) BAR BAR <br /> (JOINT MAY BE 5Altsi-CUT FOR SPLICES 4 SIZE TOP BARS OTHER BARS SIZE TOP BARS OTHER BARS t L%' cl; <br /> -4, <br /> AT CONTRACTOR'S OPTION) - . -- DEVELOPMENT <br /> *3 28" 21" *3 24" IS" eN 2-'•0 <br /> LENGTHS <br /> *4 31" 28" *4 32" 25" <br /> -1... 0 <br /> flo d <br /> „ ./c) <br /> .4/ <br /> 411OP :: <br /> o -- <br /> ,Z5 - <br /> OTC HAA5NT t v t2E3 1 EfN,Lci BAR..L i 1 Al30THEM.ASDIAMETERS,P51 FS IBCLEARLTAHE:CONCRETESPLVALUESIoEESNH COVERGATLHFBOE RISI NBCNARORETSAGSI NRE EDABTGREATER RTENSION5 oTTHAN N THE <br /> DIAMETER OF THE BAR OR THE CENTER TO CENTER SPACING 15 NOT GREATER <br /> 2 zs , 08 <br /> c). <br /> #5 46” 36" *5 40" 31" <br /> °°, q PROVIDE CONTROL OR CONCRETE WALL 0 <br /> 0. op...0. CONSTRUCTION JOINTS TO \ 1 4. PER PLAN #6 56" 43" #6 48" 51" <br /> IIIENIE E E F. #1 SI" 62" #1 10" 54" <br /> mc = BREAK UP SLAB-ON-GRADE 0 1Sd l,12c1U.O.N.1, #5 13" 11" #8 80" 62" <br /> CONTROL JOINT INTO SOUARE OR RECTANGULAR • - x <br /> -' <br /> AREAS.THE RATIO OF LONG TO \ 1 IIII11 b- U.O.N. #1 104" 50" #cfi c40" 10" <br /> SECOND POUR FIRST POUR E1 , <br /> . SHORT SIDE DIMENSION SHALL .C.Pt # 10 118" 110" # 10 102" 18" <br /> _ . <br /> SLAB THICKNESS KEYED JOINT NOT EXCEED 1.5.NO ACUTE \ <br /> - _ -- D .• FTG.DEPTH DI . 11/2"FOR#3 D2 . 6c1 FOR#3 TO#8 # II 151" 100" #II 113" 81" <br /> 111111H1 <br /> ::,_ P•4_ 11. <br /> AND REINFORCING ANGLES.MAXIMUM JOINT — BARS TO A? <do'" PER PLAN DI ..- 2" FOR#4 D2 = 8d FOR#1 TO#I1 KrZ: <br /> PER PLAN(TYP.) CONTINUE REINF. SPACING SHALL NOT EXCEED 36 MATCH FOOTING • • - - <br /> .1 DI = 21/2"FOR#5 "TOP BARS" IN BEAMS ARE HORIZONTAL BARS IN/MORE THAN 12"DEPTH OF CONCRETE <br /> THRU JOINT TIMES THE SLAB-ON-GRADE REINFORCING <br /> lIce. = CAST BELOW THEM. IF CLEAR CONCRETE COVER 15 NOT GREATER THAN THE <br /> THICKNESS. CONTRACTOR • DIAMETER OF THE BAR OR THE CENTER TO CENTER SPACING 15 NOT GREATER <br /> SHALL SUBMIT JOINT LAYOUT LINE OF EXCAVATION A5 \ HOOK5 4 BENDS STD.BAR NOOKS 4 BENDS THAN 2 BAR DIAMETERS,THEN VALUES SHALL BE INCREASED BY 5096. <br /> =11.1=11M1111= PLAN TO ARCHITECT STEEP A5 POSSIBLE.FACE , 0 FOR STIRRUPS 4 TIES <br /> FOR APPROVAL. <br /> iir 9, OF STEPS SHALL BE CAST • • <br /> MINIMUM EMBEDMENT LENGTHS <br /> F EXCAVATION ERODES, Lb <br /> AGAINST UNDISTURBED EARTH. 111EglIEHIL <br /> 'NN <br /> ...-: • °•*°`' IFOOTING AND 6 MIN. 4110 FOR STANDARD END HOOKS (Ldh) <br /> !halm a -Iiii . ra. <br /> BACKFILL INTH CONCRETE -7,- <br /> I <br /> = = TYP. REINFORCING Pc = 3000 PSI Pc = 4000 PSI <br /> WHEN FOOTING 15 CAST PER PLAN 5---,---I 5 <br /> Lb PER PLASTIC VAPOR BARRIER AND <br /> SCHEDULE COMPACTED GRANULAR FILL BAR ALL BAR ALL <br /> (WHERE OCCURS) SIZE BARS SIZE BARS <br /> BAR OFFSET 0 <br /> CONSTRUCTION JOINT #3 6" #3 6" <br /> *4 5" *4 1" <br /> TYPICAL SLAI3-0N-6RADE JOINTS SCALE:NONE 5 TYPICAL STEPPED FOOTING SCALE:NONE 6 TYPICAL REBAR BENDS SCALE:NONE 1 #5 10" #5 5" <br /> *5 12" *5 10" <br /> *1 13" *1 12" <br /> ( A *5 IS" *8 13" <br /> *1 11" *41 15" QUANTUM LTIlliNI <br /> N E ER <br /> CONCRETE WALL DO NOT PASS PIPES #I0 11" # 10 II" <br /> _ I, % MASONRY NALL PER PLAN THRU THIS AREA / 101-0"MIN.MIN. <br /> / # I 22" # II 11" <br /> CONCRETE WALL FINISH GRADE 1511 THIRD AVENUE <br /> -if- i BACKFILL PER <br /> =I1 =1111 TRENCH I. <br /> IF SIDE COVER 15 NOT EQUAL TO OR GREATER THAN 21/2"AND/OR SUITE 323 <br /> SEATTLE,WA 98101 <br /> PIPE SLEEVE PER MIN.1/2"SPACE TEL 206.957.3900 <br /> GEOTECHNICAL ENGR. ,.., END COVER FOR HOOKS 15 NOT EQUAL TO OR GREATER THAN 2", <br /> NOTES MAX.34"SPACE Y cz. PIPE SLEEVES AS FAX 206.957.3901 <br /> (PACK WITH MORTAR P d fRE0117 PER 1/53.0 THEN VALUES SHALL BE INCREASED BY 45%. www.quantumce.com <br /> 0 Min I- ..--t LI <br /> EXCAVATION,TYP. <br /> ___( <br /> , t BOT.OF <br /> TYPICAL <br /> FOOTING FTG. <br /> -.., <br /> -- 2 <br /> --- I I COMPACTED FILL <br /> PER GEOTECHNICAL CD MINIMUM STRAIGHT DEVELOPMENT 0 MINIMUM LAP SPLICE LENGTHS <br /> LENGTH FOR BARS IN COMPRESSION <br /> Pc . 3000 PSI Pc . 4000 PSI (I-dc) Pc <br /> =F300Ror;RS IN COMPRESSION (1...bc,) < <br /> PIPE OR CONDUIT / Zot = . \ -- <br /> - ENGR.MO% 0 <br /> 11-6" 4000 PSI L: cy co <br /> (12"0 MAX) \ \ DENSITY MIN) ,f2 ).- go, ......, <br /> - <br /> 0 73 ). I / / MIN. '\.-_ -7 <br /> I .E.. a . ,- <br /> , BAR ALL BAR ALL BAR ALL ',5 L__ >,.0 Etni <br /> a I 4 \ <br /> \-- <br /> POINT MORTAR OR = \ SIZE BARS SIZE BARS SIZE BARS < CD LLI <br /> BOTTOM OF EXCAVATION SHALL 2 \ 0 <br /> PROVIDE CAULKING <br /> - ri THICKENED ca. r-I z NOT EXTEND EXTEND BELOW THIS LINE \ 0 .---. z -± ky <br /> A PER ARCH. _, 6"MIN. FOOTING \ #3 8" #3 5" #3 12" <br /> ... z,-, 0 / I m a'o Z I' <br /> #4 II" #4 el" #4 15" < <br /> P. <br /> 21-0"MIN. #5 I4'' #5 12" #5 11" <br /> , / / a' _J cc o <br /> ; #6 16" #6 14" #6 23" 02Q <br /> #1 141" #1 17" #1 26" t.ii 1-1-1 <br /> ' I. fLEVATION SECTION A ct. 0 CO 6"DIA.SLEEVES AND SMALLER: SCHEDULE 40 STEEL PIPE #8 22" #8 11" #8 30" <br /> z <br /> -,, OR SCHEDULE 60 PVC PIPE. NOTE: 4*1 25" #1 21" #1 34" < Et c:S) Li 'j <br /> 2. 8"DIA.SLEEVE AND LARGER: '4"THICK STEEL PIPE(MIN.). tga: CONTRACTOR SHALL BE RESPONSIBLE FOR # 10 25" # 10 24'' # 10 35" o <br /> 3. STEEL PIPE SHALL BE HOT DIP GALVANIZED. PIPES MUST RUN PROTECTING THE SIDES OF THE EXCAVATION FROM # II 31" # II 21" # II 42'' Drawing: <br /> PERPENDICULAR THROUGH CAVE-IN UNTIL ALL BACKFILL IS COMPLETED. <br /> 4. SLEEVE MAY BE OMITTED IF HOLE 15 CORE DRILLED.CORE <br /> DRILLING 15 SUBJECT TO ENGINEER'S APPROVAL. NALL(NOT SKEWED) <br /> 6816 Evergreen Way- B1206-014 S3.0 <br /> , <br /> LI TYPICAL SLEEVE INSTALLATION THFOJ WALL SCALE:NONE CI TYPICAL PIPE INSTALLATION pezpeciat.AR TO FOOTING SCALE:NONE I 0 TYPICAL"TRENCH EXCAVATION PARALLEL TO FOOTING SCALE:NONE I I TYPICAL smicz SCHEDULE SCALE:NONE I 2 Job Number: <br /> 12104.01 <br />