Laserfiche WebLink
Installation of TOYOTA letters Installation of LED Transformer <br /> The TOYOTA letters are shipped with mounting pads that will need to be attached to the back of the The LED transformer will arrive with 2 leads to be attached to the 2 leads that are from the letter set <br /> letters. These simply screw into the letter at various points that are pre-tapped. You will set the depth and the logo. The leads from the letters and logo should have been spliced together prior to your arrival. <br /> to 2 inches. Then apply a small amount of silicon adhesive where the pad threads into the letter. This There may or may not be a power cord attached. If not,you will need to provide a 3 prong grounded cord <br /> will keep the depth set during installation. There is one threaded conduit for each letter. Once again and plug for a 110 volt receptacle. Minimum wire size of 14 gauge. Length of cord should be no more <br /> you will need to remove the lock nut and set the retaining nut to a depth of 2 inches. Dry fit the letter than 6 feet. There will be a grounded receptacle provided just inside the access panel on the lower left side <br /> to check proper depth settings of the pads and conduit. Level the letter and make a small mark on the of portal wall. You will mount the transformer to the vertical steel tube with TEK screws. Make your <br /> glass at one of the pads. Remove the letter and apply the silicon adhesive to the pads. Reinstall the connections to the leads from the letters and logo using the splice connectors provided. Plug in the <br /> letter checking to make sure it is level. Tighten the locking nut to secure. Complete install of letters, transformer,trip the time clock to check that all of the LED's in the logo and letters are illuminating. <br /> then start making the electrical connections. This will allow the adhesive to set. Connect the lead Once this has been completed, and everything is working, install the faces. Reinstall the access panel. <br /> from the LED's to the pigtail in the conduit using the splice connectors that are provided. Do not Do not forget to reset the time clock. <br /> install the faces until you have test lit the LED's. <br /> t _ ` Rcc arum- ,. _ <br /> 1 <br /> —N <br /> et . ... ;t13 .0,,„ „,„. , <br /> ......,„,....:. <br /> . . ___ <br /> _ 4,,.. <br /> — _ . <br /> _ .... .., _ <br /> _ , , ... _ _, <br /> , ,.1_ ... 4 e A Transformer shown without 110 volt power cord <br /> ,1,6',' Pigtails for connection to '-'''',.c.` .16 <br /> Silicon adhesive at base of pad leads from letter set and logo ::, <br /> Mounting pads attached to letterii, <br /> d <br /> tom' <br /> 14 <br /> Mounting location for transformer <br /> Pad affixed to glass with Silicon Adhesive , <br /> Checking illumination of LED's Grounded receptacle will be located here <br /> Proper splice of power lead to LED <br /> 6816 Evergreen Way — Rodland Toyota - Signs — S1304-007 <br /> ii <br /> 3 N 4 <br /> -,a 1i i �M :0 ' <br /> H, v �. _� <br />