Laserfiche WebLink
EVERETT CITY COUNCIL AGENDA I l'EM COVER SHEET 10 <br /> PROJECT TITLE: <br /> Call for Bids for the Briefmg COUNCIL BILL# <br /> Construction of Watermain Proposed Action Originating Department Public <br /> Replacement"T"Project Works/Utilities <br /> X Consent Contact Person Richard Hefti <br /> Action Phone Number 425-257-7215 <br /> First Reading FOR AGENDA OF October 10,2018 <br /> Second Reading <br /> Third Reading <br /> Public Hearing <br /> Budget Advisory Initialed by: <br /> Department Head <br /> Administration <br /> Council President /L <br /> Location Preceding Action Attachments Department(s)Approval <br /> Colby Ave, W Mukilteo Location Map Public Works <br /> Blvd <br /> Amount Budgeted $3,500,000 Fund 336 <br /> Expenditure Required $2,000 Account Number(s): UP 3684 <br /> Budget Remaining $3,446,630 <br /> Additional Required -0- <br /> DETAILED SUMMARY STATEMENT: <br /> Watermain Replacement"T"will replace 5,800 feet of aging 3", 6"and 8" cast iron pipe(CIP)in Colby <br /> Ave between Pacific Ave and 37th St with new 8"ductile iron pipe(DIP) and 1,100 feet of aging 6" CEP in <br /> Colby Ave between 21st St and 23rd St with new 8"DIP. The project also includes replacing 1,800 feet of <br /> aging 8"and 6" CIP in W Mukilteo Blvd between Glenhaven Dr and Seahurst Dr with new 12" DIP and <br /> realigning about 150 feet of 12"DIP along W Mukilteo Blvd at Narbeck Ave to improve slope <br /> stabilization. <br /> The budget remaining excludes cost for survey base mapping ($34,320), geotechnical report($17,050) and <br /> this request for advertising($2,000). <br /> This project was designed in-house. <br /> The project is ready to advertise for construction bids. There are no supplemental bidder requirements , <br /> associated with this project. <br /> RECOMMENDATION(Exact action requested of Council): <br /> Authorize the Call for Bids for the construction of the Watermain Replacement"T"Project. <br /> 69 <br />