My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7307 EVERGREEN WAY EVERETT CHEVROLET 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7307
>
EVERETT CHEVROLET
>
7307 EVERGREEN WAY EVERETT CHEVROLET 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 9:45:08 AM
Creation date
10/17/2018 9:39:39 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7307
Tenant Name
EVERETT CHEVROLET
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
129
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
c <br />VBL/C 6YOl�KS <br />March 23, 1999 <br />Carl F. Pirscher <br />CDA Architects, Inc. <br />P O Box 55429 <br />Seattle WA 98155 <br />Subject: Owner: Argonaut Holdings, Inc. <br />Everett Chevrolet <br />Address: 7300Evergreen Way <br />Plan Check No.: B-61608 <br />Dear Mr. Daniels: <br />C <br />In response to your applicatio❑ for a construction permit, your plans have been re- <br />examined and you are advised that the issuance of a permit is being withheld for the <br />reasons listed on the attached. These comments add�ess building issues only, additional <br />revisions or additions may be required by other departments (such as Utilities, Planning <br />or Fire). All reFerences refer to the 1997 Uniform Building Code, as amended by the <br />State of Washington and/or Washington State Energy Code 1997 Edition, unless stated <br />otherwise. <br />In order for the processing of your application to continue, it witl be necessary to <br />provide the Building Division with two complete new sets of drawings retlecting the <br />corrections ►•equested. <br />The one-hour occupancy separation between the H-4 and B occupancies should <br />form a complete separation from floor to roof sheat��ing. It appears that the <br />northern offices on the second floor may be part of the separation. The eaisting <br />construction and opening protection should be verified to be of one-hour <br />construction. Sec[ioit 302.2. <br />2. The one-hour occupancy separation requires 60 minute, self-closing opening <br />protection. Glazing is not rated by UBC Standard 7-4 above 45 minutes. The <br />windo�v and door schedule should be revised. Sections 302.2 & 713.1. <br />� <br />CITY OF EVERETT • 3200 Cedar Street • Ever=tt, NJA 98201 •(425) 257•8800 • Fax (425) 257-8856 <br />
The URL can be used to link to this page
Your browser does not support the video tag.