Laserfiche WebLink
� <br />, Total Utility MaintenanceWManagement Sy�mpOSTING %'�C�'�-T <br />02/21/1995 Page 1 <br />-------------------------------- -- - <br />Date Range :O1/09/1989 - 02/17/1995 <br />CM Work Order Range :0810800810001 - P472664-30-321Pattern :7401196648280 <br />Item Range :<Blank> - WW22o20001 Pattern :* <br />Program ALL Function ALL Activity ALL <br />_____=----------------------------------------------------- -- <br />CM WORK ORDER IU: 7401196648280 Title: SO 2 INCH 7407 EVERGREEN WAY <br />Item ID: -- <br />Location ID: -- <br />Program 740 Function 119 Activity 664 <br />Date Completed: 02/08/1995 <br />overall Craft: <br />Issued: O1/18/1995 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />UL GCR <br />SUP2 HDA <br />IIL MWE <br />UL NSO <br />Materials: <br />� ; ID <br />BOX000044647 <br />BOX000056147 <br />CORP38002547 <br />COUP38007347 <br />ELLA38107947 <br />INSE38021047 <br />METE38090547 <br />N/A <br />PIPE38060947 <br />SADD50019147 <br />SETT38033447 <br />VALV38034148 <br />Vehicles: <br />ID <br />V2047 <br />V2138 <br />V2139 <br />V2139 <br />Issued by: SKL Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />idame <br />------------------ <br />GRENZNER, CHRIS R. <br />HALL, DONALD A. <br />MOORE, WARREN E. <br />NIELSEN, SCOTT 0. <br />Planned Hrs <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Description <br />------------------------------ <br />BOX VALVE 5' PLASTIC <br />BOX METER PLA 17" X 30" W/LID <br />CORP SZ'OP 2" MIP X MIP @ <br />COUPLING COMP 2" MIP X CTS @ <br />ELL 2" STREET BRASS � <br />INSERT STIFFENERS 2" CTS @ <br />IeETER 2" PRECISION <br />TOP COARSE (FROM STOCK) <br />PIPE 2" POLY C.T.S. <br />SERVICE SADDLE 12" W/2" IP DBL <br />SETTER CUST 2" LENGTH 12"X 17" <br />VALVE 2" HEAVY DUTY <br />Description <br />------------------------------ <br />89 GMC S15 <br />86 CHEV 1-TON <br />86 CHEV 1-TON W/HYD. UNIT <br />86 CHEV 1-TON W/HYD. UNIT <br />Actual Hrs <br />1.00 <br />1.00 <br />10.00 <br />10.00 <br />Total Labor Cost: <br />Date <br />02/08/1995 <br />02/08/1995 <br />02/08/1995 <br />02/OS/1995 <br />02/OS/1995 <br />0'l/08/1995 <br />02/08/1995 <br />02/08/1995 <br />02/OS/1995 <br />02/OS/1995 <br />02/OS/1995 <br />02/08/1995 <br />tt Used <br />1 <br />1 <br />1 <br />L <br />2 <br />2 <br />1 <br />1 <br />14 <br />1 <br />1 <br />1 <br />Total Material Cost: <br />Date <br />02/OII/1995 <br />02/08/1995 <br />02/06/1995 <br />02/08/1995 <br />. Hours <br />1.00 <br />1.00 <br />2.00 <br />8.00 <br />Cost <br />13.45 <br />24.21 <br />148.30 <br />165.60 <br />351.56 <br />Cost <br />32.98 <br />72.85 <br />51.76 <br />49.74 <br />17.82 <br />1.76 <br />169.93 <br />��� <br />14.00 <br />34.86 <br />257.10 <br />77.42 <br />-------- <br />.97 <br />78d 22 <br />Cost <br />4.40 <br />5.00' <br />10.00 <br />40.00 <br />