My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7431 EVERGREEN WAY TACO BELL 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7431
>
TACO BELL
>
7431 EVERGREEN WAY TACO BELL 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 2:17:11 PM
Creation date
10/17/2018 2:16:43 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7431
Tenant Name
TACO BELL
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
222
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�r � <br />���IT�x S,e¢ (,vn lfrn ccry�rnr;,� ,nd���hnj iFrry,s '�G��f 3fi //.'ucca� <br />l� < a�id�,�ss.�c�1. �'m5 ��. �t� a✓ d�u- Ci� �� - <br />i�.�s � <br />TO: <br />FROM: <br />DATE: <br />SUHJECT: <br />Detention• <br />bt E M O R A N D II M <br />Gordon Witcher <br />Jane Zimmerman <br />January 11, 1994 <br />�� ji . <br />l/i <br />I j i <br />� `' i <br />��� y <br />Plan Review, SEPA ,�60-93, Taco Bell <br />� <br />C� ��. <br />J� jz��� ¢-- <br />✓ A completed City of Everett Drainage Calculation Form is <br />required for appz•oval of detentior. calculations. <br />�� �,uc��� Orifice calculations are required for the control <br />��' N���� � structures. <br />��I��`� ��j�� �;�1 <br />rr'�' „�� stormwater treatment svstem: <br />-,;M ri�,� <br />Z'�r The SEPA decision document requires an oil/water separator <br />� to be provided in series with the vegetated (biofiltration) <br />swale. <br />City standards require high flow bypasses for both oil/water <br />✓ separators and vegetated swales. When these facilities are <br />in series, a single bypass system can be utilized upstream <br />of the separator and swale by sizing each facility for the <br />larger of the two design flows, either the baffle-type <br />separator desiqn flow or the vegetated swale design flow. <br />� When an oil/water separator and a vegetated swale are <br />located in series downstream of a detention system, the <br />separator and swal.e may be sized for the allowable release <br />from the detention system, with 25 year storm detention <br />overflows bypassed around the separator and swale. <br />oil/water seoarator/arit resoval vault: <br />�. <br />�.c� s�� City standards call for ttie oi.1/water separator vaults to <br />��c�`� <<��� .�j.have a minimum design flow determined by using the rational <br />�"U y�t ��;��� formula with a rainfall intensity of 0.5 inches per hour <br />,t �,F� over the contributing area, unless the separator is located <br />�,ou`�V �:.� ��s downstream of a detention system as discusred abev�. The <br />vi�"'� }C� vault ie required to be sized to provide a 15 minuLe <br />��;,�r ��h, detentica� time for the desiyn flow. <br />� ��� <br />�� m <br />
The URL can be used to link to this page
Your browser does not support the video tag.