Laserfiche WebLink
GENERAL CONDITIONS GENERAL CONDITIONS (CONTINUED) GENERAL CONDITIONS (CONTINUED) GENERAL CONDITIONS (CONTINUED) <br /> SECTION 014200-REFERENCES SECTION 017419-CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL SECTION 018100-SUSTAINABLE DESIGN REQUIREMENTS SECTION 019113-GENERAL COMMISSIONING REQUIREMENTS <br /> PART 1-GENERAL 1.1 SUMMARY 1.1 SUMMARY 1.1 SUMMARY NItfe <br /> 1.1 INDUSTRY STANDARDS A. SALVAGING NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE. A. THIS SECTION INCLUDES GENERAL REQUIREMENTS AND PROCEDURES A. COMMISSIONING TEAM: i I I 1 k <br /> A. APPLICABILITY OF STANDARDS: UNLESS THE CONTRACT DOCUMENTS B. RECYCLING NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE. FOR COMPLIANCE WITH CERTAIN U.S.GREEN BUILDING COUNCIL'S 1. MEMBERS REPRESENTING CONTRACTOR,INCLUDING PROJECT lir g <br /> INCLUDE MORE STRINGENT REQUIREMENTS,APPLICABLE CONSTRUCTION C. DISPOSING OF NONHAZARDOUS DEMOLITION AND CONSTRUCTION WASTE. (USGBC)LEED PREREQUISITES AND CREDITS NEEDED FOR THE PROJECT SUPERINTENDENT AND SUBCONTRACTORS,INSTALLERS,SUPPLIERS, <br /> INDUSTRY STANDARDS HAVE THE SAME FORCE AND EFFECT AS IF BOUND 1.2 DEFINITIONS TO OBTAIN LEED CERTIFICATION BASED ON[LEED 2009 FOR RETAIL: AND SPECIALISTS. <br /> OR COPIED DIRECTLY INTO THE CONTRACT DOCUMENTS TO THE EXTENT A. CONSTRUCTION WASTE: BUILDING AND SITE IMPROVEMENT MATERIALS COMMERCIAL INTERIORS][LEED 2009 FOR RETAIL:NEW CONSTRUCTION]. 2. MEMBERS REPRESENTING OWNER,INCLUDING COMMISSIONING <br /> REFERENCED. SUCH STANDARDS ARE MADE A PART OF THE CONTRACT AND OTHER SOLID WASTE RESULTING FROM CONSTRUCTION,REMODELING, 1. OTHER LEED PREREQUISITES AND CREDITS NEEDED TO OBTAIN AGENT(CXA),FACILITY USER AND OPERATION AND MAINTENANCE <br /> DOCUMENTS BY REFERENCE. RENOVATION,OR REPAIR OPERATIONS. CONSTRUCTION WASTE INCLUDES LEED CERTIFICATION ARE DEPENDENT ON MATERIAL SELECTIONS PERSONNEL,AND ARCHITECT AND ENGINEERING DESIGN <br /> B. PUBLICATION DATES: COMPLY WITH STANDARDS IN EFFECT AS OF DATE OF PACKAGING. AND MAY NOT BE SPECIFICALLY IDENTIFIED AS LEED PROFESSIONALS. ' <br /> THE CONTRACT DOCUMENTS UNLESS OTHERWISE INDICATED. B. DEMOLITION WASTE: BUILDING AND SITE IMPROVEMENT MATERIALS REQUIREMENTS. COMPLIANCE WITH REQUIREMENTS NEEDED TO B. CONTRACTOR'S RESPONSIBILITIES:CONTRACTOR SHALL ASSIGN <br /> C. COPIES OF STANDARDS: EACH ENTITY ENGAGED IN CONSTRUCTION ON RESULTING FROM DEMOLITION OR SELECTIVE DEMOLITION OPERATIONS. OBTAIN LEED PREREQUISITES AND CREDITS MAY BE USED AS ONE REPRESENTATIVES WITH EXPERTISE AND AUTHORITY TO ACT ON ITS <br /> PROJECT SHOULD BE FAMILIAR WITH INDUSTRY STANDARDS APPLICABLE TO C. DISPOSAL: REMOVAL OFF-SITE OF DEMOLITION AND CONSTRUCTION CRITERION TO EVALUATE SUBSTITUTION REQUESTS. BEHALF AND SHALL SCHEDULE THEM TO PARTICIPATE IN AND PERFORM ® <br /> ITS CONSTRUCTION ACTIVITY. COPIES OF APPLICABLE STANDARDS ARE NOT WASTE AND SUBSEQUENT SALE,RECYCLING,REUSE,OR DEPOSIT IN 2. ADDITIONAL LEED PREREQUISITES AND CREDITS NEEDED TO COMMISSIONING PROCESS ACTIVITIES INCLUDING,BUT NOT LIMITED TO, @2011 STARBUCKS COFFEE COMPANY <br /> BOUND WITH THE CONTRACT DOCUMENTS. LANDFILL OR INCINERATOR ACCEPTABLE TO AUTHORITIES HAVING OBTAIN THE INDICATED LEED CERTIFICATION ARE DEPENDENT ON THE FOLLOWING: <br /> 1. WHERE COPIES OF STANDARDS ARE NEEDED TO PERFORM A JURISDICTION. THE ARCHITECT'S DESIGN AND OTHER ASPECTS OF THE PROJECT 1. INTEGRATE AND COORDINATE COMMISSIONING PROCESS ACTIVITIES <br /> REQUICSOURCE. SUBSEQUENT PROCESSING IN PREPARATION CONSTRUCTION ACTIVITY,OBTAIN COPIES DIRECTLY D. OR <br /> FORREUSE. <br /> CONSTRUCTION <br /> WITH CONSTRUCTION SCHEDULE. <br /> FROMPUBLICATION WASTE FOR 1.2 DEFINITIONS THAT ARE NOT PART OF THE WORK OF THE CONTRACT. 2. REVIEW AND ACCEPT COMMISSIONING CHECKLISTS AND PROCESS STARBUCKS COFFEE <br /> 1.2 ABBREVIATIONS AND ACRONYMS E. SALVAGE: RECOVERY OF DEMOLITION OR CONSTRUCTION WASTE AND A. BASE BUILDING MATERIAL:MATERIALS PERMANENTLY ATTACHED TO THE TEST PROCEDURES PROVIDED BY THE COMMISSIONING AGENT(CXA). COMPANY <br /> A. INDUSTRY ORGANIZATIONS: WHERE ABBREVIATIONS AND ACRONYMS ARE SUBSEQUENT SALE OR REUSE IN ANOTHER FACILITY. STRUCTURE.INCLUDES FINISHES AND PERMANENT CABINETS AND 3. SUPPORT COMMISSIONING INSTALLATION REVIEW AND PROCESS <br /> USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS,THEY SHALL F. SALVAGE AND REUSE: RECOVERY OF DEMOLITION OR CONSTRUCTION CASEWORK. TEST PROCEDURES. 2401 UTAH AVENUE SOUTH <br /> MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOWING LIST. WASTE AND SUBSEQUENT INCORPORATION INTO THE WORK. B. CHAIN-OF-CUSTODY CERTIFICATES: CERTIFICATES SIGNED BY 4. EVALUATE INSTALLATION AND PERFORMANCE DEFICIENCIES SEATTLE,WASHINGTON 98134 <br /> 1.3 PERFORMANCE REQUIREMENTS MANUFACTURERS CERTIFYING THAT WOOD USED TO MAKE PRODUCTS IDENTIFIED IN REPORTS AND,IN COLLABORATION WITH ENTITY <br /> ACI AMERICAN CONCRETE INSTITUTE A. END-OF-PROJECT RATES FOR SALVAGE/RECYCLING: [50][75]PERCENT. WAS OBTAINED FROM FORESTS CERTIFIED BY AN FSC-ACCREDITED RESPONSIBLE FOR SYSTEM AND EQUIPMENT INSTALLATION, (206)318-1575 <br /> AHA AMERICAN HARDBOARD ASSOCIATION 1.4 ACTION SUBMITTALS CERTIFICATION BODY TO COMPLY WITH FSC STD-01-001,"FSC PRINCIPLES RECOMMEND CORRECTIVE ACTION. <br /> AITC AMERICAN INSTITUTE OF TIMBER CONSTRUCTION A. WASTE MANAGEMENT PLAN: SUBMIT PLAN WITHIN 7 DAYS OF DATE AND CRITERIA FOR FOREST STEWARDSHIP." CERTIFICATES SHALL 5. COOPERATE WITH THE COMMISSIONING TEAM FOR RESOLUTION OF THESE DRAWINGS AND SPECIFICATIONS ARE <br /> ANSI AMERICAN NATIONAL STANDARDS INSTITUTE ESTABLISHED FOR COMMENCEMENT OF THE WORK. INCLUDE EVIDENCE THAT MANUFACTURER IS CERTIFIED FOR CHAIN OF ISSUES RECORDED IN THE ISSUES LOG. CONFIDENTIAL AND SHALL REMAIN THE SOLE <br /> APA • APA-THE ENGINEERED WOOD ASSOCIATION 1. TYPES AND QUANTITIES OF DEMOLITION AND CONSTRUCTION CUSTODY BY AN FSC-ACCREDITED CERTIFICATION BODY. C. COMMISSIONING AGENT'S(CXA'S)RESPONSIBILITIES: PROPERTY OF STARBUCKS CORPORATION, <br /> ASHRAE AMERICAN SOCIETY OF HEATING,REFRIGERATING AND WASTE. C. REGIONALLY MANUFACTURED MATERIALS: MATERIALS THAT ARE 1. ORGANIZE AND LEAD COMMISSIONING TEAM. WHICH IS THE OWNER OF THE COPYRIGHT IN <br /> AIR-CONDITIONING ENGINEERS 2. TYPE OF WASTE AND WHETHER IT WILL BE SALVAGED,RECYCLED, MANUFACTURED WITHIN A RADIUS OF 500 MILES(800 KM)FROM PROJECT 2. PROVIDE AND MANAGE COMMISSIONING PLAN. THIS WORK. THEY SHALL NOT BE REPRODUCED <br /> ASTM ASTM INTERNATIONAL OR DISPOSED OF IN LANDFILL OR INCINERATOR. SITE. MANUFACTURING REFERS TO THE FINAL ASSEMBLY OF 3. PROVIDE PROJECT-SPECIFIC CHECKLISTS AND TEST PROCEDURES. (IN WHOLE OR IN PART),SHARED WITH THIRD <br /> (AMERICAN SOCIETY FOR TESTING AND MATERIALS INTERNATIONAL) 3. NET ADDITIONAL COST OR NET SAVINGS RESULTING FROM WASTE COMPONENTS INTO THE BUILDING PRODUCT THAT IS INSTALLED AT 4. WITNESS,PREPARE AND MAINTAIN COMPLETED INSTALLATION PARTIES OR USED IN ANY MANNER ON OTHER <br /> AWI ARCHITECTURAL WOODWORK INSTITUTE MANAGEMENT PLAN. PROJECT SITE. VERIFICATION CHECKLISTS. PROJECTS OR EXTENSIONS TO THIS PROJECT <br /> AWPA AMERICAN WOOD PROTECTION ASSOCIATION 1.5 INFORMATION SUBMITTALS D. REGIONALLY EXTRACTED AND MANUFACTURED MATERIALS: REGIONALLY 5. WITNESS SYSTEMS,ASSEMBLIES,EQUIPMENT,AND COMPONENT WITHOUT THE PRIOR WRITTEN CONSENT OF <br /> (FORMERLY: AMERICAN WOOD PRESERVERS'ASSOCIATION) A. WASTE REDUCTION PROGRESS REPORTS: CONCURRENT WITH EACH MANUFACTURED MATERIALS MADE FROM RAW MATERIALS THAT ARE STARTUP. STARBUCKS CORPORATION. THESE DRAWINGS <br /> CRI CARPET AND RUG INSTITUTE(THE) APPLICATION FOR PAYMENT,SUBMIT REPORT INDICATING TYPE OF WASTE EXTRACTED,HARVESTED,OR RECOVERED WITHIN A RADIUS OF 500 MILES 6. WITNESS,PREPARE,AND MAINTAIN COMPLETED FUNCTIONAL AND SPECIFICATIONS ARE INTENDED TO <br /> CRRC COOL ROOF RATING COUNCIL AND WHETHER IT HAS BEEN SALVAGED,RECYCLED,OR DISPOSED OF IN (800 KM)FROM PROJECT SITE. TESTING CHECKLISTS. EXPRESS DESIGN INTENT FOR A <br /> CSA CANADIAN STANDARDS ASSOCIATION LANDFILL OR INCINERATOR. E. RECYCLED CONTENT: MATERIAL THAT HAS BEEN BROKEN DOWN AND 7. PREPARE AND MAINTAIN THE ISSUES LOG. PROTOTYPICAL STARBUCKS STORE(WHICH IS <br /> CSA CSA INTERNATIONAL B. WASTE DISPOSAL RECORDS:INDICATE RECEIPT AND ACCEPTANCE OF RECONSTITUTED INTO NEW MATERIAL.THE RECYCLED CONTENT VALUE 8. COMPILE COMMISSIONING DOCUMENTS,RESULTS,AND SUBJECT TO CHANGE AT ANYTIME)AND DO NOT <br /> (FORMERLY: IAS-INTERNATIONAL APPROVAL SERVICES) WASTE MATERIAL BY ACCEPTING AND PROCESSING FACILITIES LICENSED OF A MATERIAL ASSEMBLY SHALL BE DETERMINED BY WEIGHT. THE DEFICIENCIES;INCLUDE THEM IN THE SYSTEMS MANUAL AND REFLECT ACTUAL SITE CONDITIONS. NEITHER <br /> CSI CONSTRUCTION SPECIFICATIONS INSTITUTE(THE) TO ACCEPT THEM. INCLUDE MANIFESTS,TYPE OF MATERIAL,WEIGHT OR RECYCLED FRACTION OF THE ASSEMBLY IS THEN MULTIPLIED BY THE COMMISSIONING SUMMARY REPORT. PARTY SHALL HAVE ANY OBLIGATION NOR <br /> ETL SEMCO INTERTEK ETL SEMCO VOLUME TICKETS,RECEIPTS,AND INVOICES. COST OF ASSEMBLY TO DETERMINE THE RECYCLED CONTENT VALUE. 9. REVIEW COMMISSIONING REPORT WITH COMMISSIONING TEAM AND LIABILITY TO THE OTHER(EXCEPT STATED <br /> (FORMERLY: ITS-INTERTEK TESTING SERVICE NA) C. LEED SUBMITTAL: CWM REPORTING TEMPLATE,TABULATING TOTAL 1. "POST-CONSUMER"MATERIAL IS DEFINED AS WASTE MATERIAL IMPLEMENT PLAN TO RESOLVE DEFICIENCIES. ABOVE)UNTIL A WRITTEN AGREEMENT IS FULLY <br /> FM GLOBAL FM GLOBAL WASTE MATERIAL,QUANTITIES DIVERTED AND MEANS BY WHICH IT IS GENERATED BY HOUSEHOLDS OR BY COMMERCIAL,INDUSTRIAL, END OF SECTION 019113 EXECUTED BY BOTH PARTIES. <br /> (FORMERLY: FMG-FM GLOBAL) DIVERTED,AND STATEMENT THAT REQUIREMENTS FOR THE CREDIT HAVE AND INSTITUTIONAL FACILITIES IN THEIR ROLE AS END USERS OF <br /> FSC FOREST STEWARDSHIP COUNCIL BEEN MET. THE PRODUCT,WHICH CAN NO LONGER BE USED FOR ITS <br /> HPVA HARDWOOD PLYWOOD&VENEER ASSOCIATION 1.6 RECYCLING WASTE INTENDED PURPOSE. <br /> ISO INTERNATIONAL ORGANIZATION FOR STANDARDIZATION A. RECYCLING INCENTIVES: REVENUES AND OTHER INCENTIVES FOR 2. "PRE-CONSUMER"MATERIAL IS DEFINED AS MATERIAL DIVERTED <br /> ITS INTERTEK TESTING SERVICE NA RECYCLING WILL ACCRUE TO OWNER. FROM THE WASTE STREAM DURING THE MANUFACTURING Group(NOW ETL SEMCO) END OF SECTION 017419 PROCESS. EXCLUDED IS REUTILIZATION OF MATERIALS SUCH AS <br /> MFMA MAPLE FLOORING MANUFACTURERS ASSOCIATION,INC. REWORK,REGRIND,OR SCRAP GENERATED IN A PROCESS AND EXISTING CONDITIONS <br /> MPI MASTER PAINTERS INSTITUTE CAPABLE OF BEING RECLAIMED WITHIN THE SAME PROCESS THAT <br /> NFPA NFPA GENERATED IT. <br /> (NATIONAL FIRE PROTECTION ASSOCIATION) F. RESOURCE REUSE:MATERIAL THAT HAS BEEN KEPT INTACT AND SECTION 024119-SELECTIVE DEMOLITION <br /> NOFMA NOFMA: THE WOOD FLOORING MANUFACTURERS ASSOCIATION REPURPOSED TO A NEW USE ON THE SAME PROJECT SITE OR FOR THE 1.1 SUMMARY <br /> (FORMERLY: NATIONAL OAK FLOORING MANUFACTURERS ORIGINAL OR NEW USE ON A DIFFERENT PROJECT SITE.FURNITURE MAY A. DEMOLITION AND REMOVAL OF[PORTIONS OF A BUILDING OR STRUCTURE] <br /> ASSOCIATION) BE REPURPOSED FOR THE ORIGINAL USE ON THE SAME PROJECT SITE. [SELECTED SITE ELEMENTS]. <br /> OPL INTERTAK 1.3 SUBMITTALS B. HISTORIC ITEMS REMOVED AND SALVAGED FOR OWNER. ;,3 <br /> SDI STEEL DOOR INSTITUTE A. GENERAL: SUBMIT ADDITIONAL LEED SUBMITTALS REQUIRED BY OTHER 1.2 SUBMITTALS <br /> SMACNA SHEET METAL AND AIR CONDITIONING CONTRACTORS' SPECIFICATION SECTIONS. A. SCHEDULE OF SELECTIVE DEMOLITION ACTIVITIES: INDICATE THE <br /> NATIONAL ASSOCIATION B. LEED DOCUMENTATION SUBMITTALS: FOLLOWING: <br /> UL UNDERWRITERS LABORATORIES INC. 1. CREDIT MR 2: COMPLY WITH SECTION 017419"CONSTRUCTION 1. DETAILED SEQUENCE OF SELECTIVE DEMOLITION AND REMOVAL <br /> USGBC U.S.GREEN BUILDING COUNCIL WASTE MANAGEMENT AND DISPOSAL." WORK,WITH STARTING AND ENDING DATES FOR EACH ACTIVITY. <br /> WCLIB WEST COAST LUMBER INSPECTION BUREAU 2. CREDIT MR 3: RECEIPTS FOR SALVAGED AND REFURBISHED ENSURE OWNER'S[BUILDING MANAGER'S][AND][OTHER TENANTS] Or <br /> WI WOODWORK INSTITUTE(FORMERLY: WIC-WOODWORK INSTITUTE MATERIALS USED FOR PROJECT,INDICATING SOURCES AND ON-SITE OPERATIONS ARE UNINTERRUPTED. <br /> OF CALIFORNIA) COSTS FOR SALVAGED AND REFURBISHED MATERIALS. 2. INTERRUPTION OF UTILITY SERVICES. INDICATE HOW LONG UTILITY <br /> B. CODE AGENCIES: WHERE ABBREVIATIONS AND ACRONYMS ARE USED IN 3. CREDIT MR 4: PRODUCT DATA AND CERTIFICATION LETTER FROM SERVICES WILL BE INTERRUPTED. . K t ' <br /> SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS,THEY SHALL MEAN PRODUCT MANUFACTURERS INDICATING PERCENTAGES BY 3. COORDINATION FOR SHUTOFF,CAPPING,AND CONTINUATION OF '; [CA <br /> THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOWING LIST. WEIGHT OF POST-CONSUMER AND PRE-CONSUMER RECYCLED UTILITY SERVICES. <br /> DIN DEUTSCHES INSTITUT FUR NORMUNG E.V. CONTENT FOR PRODUCTS HAVING RECYCLED CONTENT.INCLUDE 4. USE OF ELEVATOR AND STAIRS. <br /> ICC INTERNATIONAL CODE COUNCIL STATEMENT INDICATING MATERIAL COSTS FOR EACH PRODUCT 5. COORDINATION OF OWNER'S CONTINUING OCCUPANCY OF <br /> ICC-ES ICC EVALUATION SERVICE,INC. HAVING RECYCLED CONTENT. PORTIONS OF EXISTING BUILDING AND OF OWNER'S PARTIAL <br /> C. FEDERAL GOVERNMENT AGENCIES: WHERE ABBREVIATIONS AND 4. CREDIT MR 5: PRODUCT DATA INDICATING LOCATION OF OCCUPANCY OF COMPLETED WORK. <br /> ACRONYMS ARE USED IN SPECIFICATIONS OR OTHER CONTRACT MATERIAL MANUFACTURER FOR REGIONALLY MANUFACTURED 1.3 PROJECT CONDITIONS <br /> DOCUMENTS,THEY SHALL MEAN THE RECOGNIZED NAME OF THE MATERIALS. INCLUDE STATEMENT INDICATING COST FOR EACH A. OWNER WILL[NOT]OCCUPY PORTIONS OF BUILDING IMMEDIATELY Revision Schedule <br /> ENTITIES IN THE FOLLOWING LIST. REGIONALLY MANUFACTURED MATERIAL AND FOR EACH ADJACENT TO SELECTIVE DEMOLITION AREA. Rev Date By Description <br /> EPA ENVIRONMENTAL PROTECTION AGENCY IONALLY EXTRACTED AND MANUFACTURED MATERIAL. B. HAZARDOUS MATERIALS: UNKNOWN WHETHER HAZARDOUS MATERIALS WILL <br /> D. STANDARDS AND REGULATIONS: WHERE ABBREVIATIONS AND ACRONYMS a. INCLUDE STATEMENT INDICATING DISTANCE FROM BE ENCOUNTERED. IF ENCOUNTERED,OWNER WILL REMOVE HAZARDOUS <br /> ARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS,THEY MANUFACTURER TO PROJECT FOR EACH REGIONALLY MATERIALS UNDER A SEPARATE CONTRACT. <br /> SHALL MEAN THE RECOGNIZED NAME OF THE STANDARDS AND REGULATIONS MANUFACTURED MATERIAL. 1.4 WARRANTY <br /> IN THE FOLLOWING LIST. b. INCLUDE STATEMENT INDICATING LOCATION OF AND A. EXISTING WARRANTIES: <INSERT LIST OF EXISTING WARRANTIES AFFECTED <br /> ADAAG AMERICANS WITH DISABILITIES ACT(ADA) DISTANCE FROM PROJECT TO POINT OF EXTRACTION, BY SELECTIVE DEMOLITION.> <br /> - ARCHITECTURAL BARRIERS ACT(ABA) HARVEST,OR RECOVERY FOR EACH RAW MATERIAL USED 1.5 EXECUTION <br /> ACCESSIBILITY GUIDELINES FOR BUILDINGS AND FACILITIES IN REGIONALLY EXTRACTED AND MANUFACTURED A. UTILITY SERVICES AND MECHANICAL/ELECTRICAL SYSTEMS:MAINTAINED TO <br /> WJ AVAILABLE FROM U.S.ACCESS BOARD MATERIALS. OCCUPIED FACILITIES. <br /> U.l CFR CODE OF FEDERAL REGULATIONS 5. CREDIT MR 7: PRODUCT DATA AND CHAIN-OF-CUSTODY 1. SHUT OFF: BY[OWNER][BUILDING MANAGER][CONTRACTOR]. <br /> = AVAILABLE FROM GOVERNMENT PRINTING OFFICE CERTIFICATES FOR PRODUCTS CONTAINING CERTIFIED WOOD. B. SITE ACCESS AND TEMPORARY CONTROLS: MINIMUM INTERFERENCE WITH <br /> WI E. STATE GOVERNMENT AGENCIES: WHERE ABBREVIATIONS AND ACRONYMS INCLUDE STATEMENT INDICATING COST FOR EACH CERTIFIED ROADS,STREETS,WALKS,WALKWAYS,AND OTHER ADJACENT OCCUPIED <br /> HARE USED IN SPECIFICATIONS OR OTHER CONTRACT DOCUMENTS,THEY WOOD PRODUCT. AND USED FACILITIES <br /> 0 SHALL MEAN THE RECOGNIZED NAME OF THE ENTITIES IN THE FOLLOWING 6. CREDIT IEQ 3.1: C. TEMPORARY FACILITIES: PROVIDE TEMPORARY BARRICADES AND OTHER <br /> O LIST. a. CONSTRUCTION INDOOR-AIR-QUALITY MANAGEMENT PLAN. PROTECTION REQUIRED TO PREVENT INJURY TO PEOPLE AND DAMAGE TO <br /> 0CDHS CALIFORNIA DEPARTMENT OF HEALTH SERVICES b. PRODUCT DATA FOR TEMPORARY FILTRATION MEDIA. ADJACENT BUILDINGS AND FACILITIES TO REMAIN. >- <br /> Q CDPH CALIFORNIA DEPARTMENT OF PUBLIC HEALTH,INDOOR AIR QUALITY c. PRODUCT DATA FOR FILTRATION MEDIA USED DURING D. TEMPORARY SHORING: PROVIDE AND MAINTAIN SHORING,BRACING,AND a Q <br /> SECTION OCCUPANCY. STRUCTURAL SUPPORTS AS REQUIRED TO PRESERVE STABILITY AND <br /> > END OF SECTION 014200 d. CONSTRUCTION DOCUMENTATION: SIX PHOTOGRAPHS AT PREVENT MOVEMENT,SETTLEMENT,OR COLLAPSE OF CONSTRUCTION ANDco F- <br /> O z <br /> z THREE DIFFERENT TIMES DURING THE CONSTRUCTION FINISHES TO REMAIN,AND TO PREVENT UNEXPECTED OR UNCONTROLLED <br /> L PERIOD,ALONG WITH A BRIEF DESCRIPTION OF THE MOVEMENT OR COLLAPSE OF CONSTRUCTION BEING DEMOLISHED. Z CN <br /> SMACNA APPROACH EMPLOYED,DOCUMENTING E. REMOVED AND SALVAGED ITEMS: CLEANED,CRATED,STORED,AND Z LLI O <br /> 0 IMPLEMENTATION OF THE INDOOR-AIR-QUALITY TRANSPORTED TO OWNER'S[ON][OFF]-SITE STORAGE AREA. W <br /> C MANAGEMENT MEASURES,SUCH AS PROTECTION OF F. REMOVED AND REINSTALLED ITEMS: CLEANED,REPAIRED,CRATED, Q V <br /> W DUCTS AND ON-SITE STORED OR INSTALLED ABSORPTIVE STORED,AND REINSTALLED. W �r� <br /> > MATERIALS. G. EXISTING ITEMS TO REMAIN: EXISTING CONSTRUCTION PROTECTED n/ W 0 <br /> 7. CREDIT IEQ 3.2: AGAINST DAMAGE. W rt IY C �_ <br /> co a. SIGNED STATEMENT DESCRIBING THE BUILDING AIR FLUSH- H. DISPOSAL OF DEMOLISHED ITEMS: Q (� w H <br /> M OUT PROCEDURES INCLUDING THE DATES WHEN FLUSH- 1. BURNING: NOT PERMITTED. �v/ \ <br /> OUT WAS BEGUN AND COMPLETED AND STATEMENT THAT 2. DISPOSAL: COMPLY WITH REQUIREMENTS SECTION 017419 H L-L < L j LLQ 0 <br /> xFILTRATION MEDIA WAS REPLACED AFTER FLUSH-OUT. "CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL". Z0 <br /> CO b. PRODUCT DATA FOR FILTRATION MEDIA USED DURING END OF SECTION 024119 L I- L W O <br /> C!) FLUSH-OUT AND DURING OCCUPANCY. O > O cc? <br /> J 8. CREDIT IEQ 4A: PRODUCT DATA FOR ADHESIVES AND SEALANTS W CC ' > z <br /> Q USED INSIDE THE WEATHERPROOFING SYSTEM INDICATING VOC D_ W N- D- Imo- LLI (/) <br /> C) CONTENT OF EACH PRODUCT USED. <br /> 9. CREDIT IEQ 4B: PRODUCT DATA FOR PAINTS AND COATINGS USED <br /> Q INSIDE THE WEATHERPROOFING SYSTEM INDICATING VOC CONTENT STORE#: 3813 <br /> o OF EACH PRODUCT USED. <br /> �c 10. CREDIT IEQ 4D: PRODUCT DATA FOR PRODUCTS CONTAINING PROJECT#: 15866-035 <br /> a) <br /> a) COMPOSITE WOOD OR AGRIFIBER PRODUCTS OR WOOD GLUES <br /> O INDICATING THAT THEY DO NOT CONTAIN UREA-FORMALDEHYDE CONCEPT: MCS <br /> RESIN. <br /> 0O 1.4 INFORMATIONAL SUBMITTALS PALETTE: <br /> A. LEED ACTION PLANS: PROVIDE PRELIMINARY SUBMITTALS WITHIN SEVEN ISSUE DATE: 03/24/14 <br /> .c DAYS OF DATE ESTABLISHED FOR COMMENCEMENT OF THE WORK <br /> INDICATING HOW THE FOLLOWING REQUIREMENTS WILL BE MET: DESIGN MANAGER: JESSICA SWANN <br /> N <br /> 1. CREDIT MR 2: WASTE MANAGEMENT PLAN COMPLYING WITH <br /> 0 SECTION 017419"CONSTRUCTION WASTE MANAGEMENT AND LEED®AP: <br /> UDISPOSAL." PRODUCTION DESIGNER:DLR GROUP <br /> 2. CREDIT IEQ 3.1: CONSTRUCTION INDOOR-AIR-QUALITY <br /> MANAGEMENT PLAN. CHECKED BY: HELEN WONG <br /> B. LEED PROGRESS REPORTS: CONCURRENT WITH EACH APPLICATION FOR <br /> PAYMENT,SUBMIT REPORTS COMPARING ACTUAL CONSTRUCTION AND <br /> 2 PURCHASING ACTIVITIES WITH LEED ACTION PLANS FOR THE FOLLOWING: SHEET TITLE: <br /> Q_ 1. CREDIT WITH SECTION 017419"CONSTSTE RUCTION WASTE MANAGEMENTN PROGRESS REPORTS AND COMPLYING DESIGN <br /> j DISPOSAL." <br /> c:r; END OF SECTION 018100 SPECIFICATIONS <br /> M <br /> c:6 SCALE: 1/4"=1'-0" <br /> �t <br /> O <br /> SHEET NUMBER: <br /> N <br /> N 7430 Evergreen Way- Starbucks - B1404-012 <br /> G-0010 <br /> M <br /> . <br />