My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7600 EVERGREEN WAY EVERETT CLINIC 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7600
>
EVERETT CLINIC
>
7600 EVERGREEN WAY EVERETT CLINIC 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2018 3:28:06 PM
Creation date
10/17/2018 3:17:29 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7600
Tenant Name
EVERETT CLINIC
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cc: dave@cornerstonegci.com; Ty Allan; AI Smith; lim Venturo � <br />Subject: RE: Everett Clinic Data Center permit K1107-007 Sprinkler TI for data center <br />)ohn, <br />Please contact our cross-connection specialist, Tim Markham, regarding this comment. His phone number is 425-257- <br />8833. <br />Thanks, <br />Meg <br />_ . _. _ __ _.. _ - <br />From: ]ohn Goldberg [mailto:jgoldberg@coscoilre.com] <br />Sent: Thursday, August 11, 2011 11:15 AM <br />To: Meg Haley <br />Cc: dave@cornerstonegci.com; Ty Allan; AI Smith <br />Subjed: RE: Everett Clinic Data Center permit K1107-007 Sprinkler'ff for data center <br />Meg <br />Why a PRV (Pressure Reducing Valve)? The preaction system protects the Data Center Area of the building and is only <br />an auxiliary system, 16 sprinklers. PRV's are only required on systems, wet, dry, preaction when the static pressure <br />exceeds 175 psi. having to do with the psi rating of the sprinkier heads, valves, fittings, ect... I believe the City pressure <br />is only 68 psi. <br />lohn <br />John Goldberg <br />Senior Contract Sales Rep <br />Cosco Fire Protection <br />office 425-686-6305 <br />cell 425-766-3220 <br />jgold�erg@coscofire.com <br />- - _ ---- ---- - <br />From: Meg Haley [mailto:MHaley@ci.everett.wa.us] <br />Sent: Thursday, August 11, 2011 11:03 AM <br />To: John Goldberg; dave@cornerstonegci.com <br />Subject: RE: Everett Clinic Data Center permit K1107-007 Sprinkler TI for data center <br />Thanks for confirming that the hydraulic calculations already have a safety cushion for this revision. Could another three <br />�tamped sheets be submitted for the PRV required for the preaction system? <br />�Meg <br />_ --- --- - - -------- ---- - -------- <br />From: )ohn Goldberg [mailto:jgoldberg@coscofire.com] <br />Sent: Thursday, August 11, 2011 10:53 AM <br />To: dave@cornerstonegci.com; Meg lialey <br />Cc: ]ohanna McManus; Wilson, Susan; jmoon@integworks.com; Ty Allan; AI Smith <br />Subject: RE: Everett Clinic Data Center permit K1107-007 Sprinkler lI for data center <br />Dave <br />The Hydraulic calculations for the Data Center are at the City. We left a 25 psi safety cushion. In addition, included in <br />our calc's was a 4 psi loss for the double detector and the City single detector based upon our system demand of 40D <br />GPM. eased upon this a resubmittal should not be necessary. <br />John <br />John Goldberg <br />Senior Contract Sales Rep <br />Cosco Fire Protection <br />office 425-656-6305 � <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.