Laserfiche WebLink
( c. <br />d. Location and size of new vault required for the double-check <br />detector assembly (DCDA), installed per City Standard <br />Drawing #515; <br />e. A catalog cut of the DCDA which meets WA State <br />Department of Health requirements for approval assemblies; <br />f. Connection of DCDA to city main; <br />g. Location of riser room and door access (if any); <br />h. A reduced pressure backflow assembly is required inside of <br />the building for Data Center room 139. <br />i. Post indicator valve (or wall indicator valve) location if there <br />is no direct access to the riser room from outside of the <br />building; <br />j. Any landscape re��isions per the Planning Department. <br />Sheets L-1 and L-2 have been revised to comp/p with <br />P/anning Department requirements and /andscape <br />modification request by The Everett C/inic, qranied <br />by City of Everett. <br />2. The area calculations for the existing building floor area changed in <br />the code analysis from 30,597 square feet to 29967 square feet <br />from permit 61103-035 to permit 62207-022. Snohomish county <br />Assessor's office indicates 30,384 square feet. Please clarify. We <br />have revised the area ca/cu/ation to reflectsquare footage <br />perSnohomish CountyAsses�o�'s o�ce. 5ee �heetA0,1 <br />Code info�mation, <br />Occupancy <br />1. A table with a summary of square foot area, occ�pant load, and <br />occupant type should be shown for Pach space on the drawings to <br />determine the total occupant load of the tenant space. <br />a. This table should include the documentation that the <br />accessory occupancy of assembly does not exceed 10% of <br />the floor area of the building area on this story, per IBC <br />section 508.2.1. See attache�/ OccupancySummary <br />Tab/e and revised sheetA0.1. <br />b. The current floor area identified as assembly use exceeds <br />the 10% threshold for the building area of 30,384 square <br />feet. F/oor area identified as assemb/y has been <br />�evised, See attached Occupancy Summary Tab/e <br />and revise�+sheetA0.1. <br />c. The current gross building occupant load will increase based <br />on the cumulative occupant loads determined for assembly <br />spaces. F/oor area identifed as assemb/y has been <br />