Laserfiche WebLink
JL ` <br /> Eligible Scope Activities <br /> Project Sponsor: Everett Parks&Recreation Department Project Number: 16-1310 <br /> Project Title: <br /> Phil Johnson Ballfields Renovation Project Type: Development <br /> Program: <br /> VWVRP-Local Parks Approval: 2/1/2018 <br /> Project Metrics <br /> Sites Improved 0 <br /> Project acres developed: 0.00.000 <br /> Project acres renovated: <br /> Development Metrics <br /> Worksite#1, Phil Johnson Ballfields <br /> Athletic Fields <br /> Multi-purpose field development 0 new,0 renovated <br /> Number of multi-purpose fields: 0 new,4 renovated <br /> Number of multi-purpose fields with lighting: <br /> Parking and Roads <br /> Parking development 0 new,44 renovated <br /> Number of vehicle parking stalls: 0 new,0 renovated <br /> Number of vehicle with trailer parking stalls: <br /> Number of accessible parking stalls: 0 <br /> Vehicle with trailers 2 <br /> Vehicle halt <br /> Select the parking surfaces: Asphalt <br /> Catch basins, Curbs, Entry <br /> Select the parking enhancements: Bigate,Security lighting,Striping,Wheel <br /> stops <br /> Architectural&Engineering <br /> Architectural&Engineering(A&E) The project renovation A&E is being <br /> performed by the same firm that <br /> originally designed the complex in <br /> 2000/2001. They have the original A&E <br /> documents available,thereby reducing <br /> the costs for the design of the <br /> renovation. <br /> 111 <br /> June 7,2018 Page: 1 <br />