Laserfiche WebLink
Run Date: 3/27/2018 <br /> City of Everett-Public.Works Department <br /> Time: 1:33 PM Contract Estimate Voucher Cutoff Date: 3/9/2018 <br /> Project: 333' For Work Order#3472A <br /> 41ST STREET TO WMVD FREIGHT Estimate#18 Contractor: MARSHBANK CONSTRUCTION <br /> CORRIDOR IMPROVEMENTS PO BOX 97 <br /> WO 3472A BID:.$3,095,375.03 <br /> TOTAL BID:$3,095,376;03 LAKE STEVENS,WA 98258-0097 <br /> Item# Description Unit Plan Total Previous Present <br /> Units Price QuantityTotal Previous Present <br /> •Quantity Quantity Quantity Amount • Amount Amount <br /> 0080 Cement Concrete Extruded Curb LF <br /> 0081 • <br /> 0 Cement Removal odere Obstruction 10.64 35.0,00 325.0000 325.0000 0;0000 <br /> LS 15,300.00 1.00 3,458.00 3,458.00 0.00 <br /> 0100 Material on Hand for Electrical 1.0000 0.0000 1:0000 15,300.00 <br /> DOLLA 1.00 83,855.74 0.0000 0.00 15,300.00 <br /> 0101 Material on hand for Signal 0.0000 0.0000 0.00 0.00 <br /> DOLLA 1.00 57,642,61 0.0000 0.0000 0,0000 0.00 <br /> 0102 Deferred Payment For Great Western DOLLA -1.00 0.00 0.00 0.00 <br /> 0103 Deferred Payment for Hlghmark Punchltst 500.00 0.0000 0.0000 0.0000 <br /> DOLLA -1.00 5,000.00 0.00 0.00 0.00 <br /> 0.0000 0,0000 0.0000 0.00 <br /> 0.00 0.00 <br /> Work Order Totals: 3,083,395.47 '3,082,270.47 1,125.00 N <br /> LO <br />