My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
7800 EVERGREEN WAY DWAYNE LANES 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
7800
>
DWAYNE LANES
>
7800 EVERGREEN WAY DWAYNE LANES 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/19/2018 9:27:08 AM
Creation date
10/19/2018 9:06:07 AM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
7800
Tenant Name
DWAYNE LANES
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
COST ES'Y'IMATE SHEET <br />Receipt # <br />Cost of Work Order <br />� <br />v ��-'1' IL1 \L.f <br />✓ Cost of Service Order 8,040.00 <br />Contact Person <br />Requested By Paul MCKee <br />Pronerty Owner (name) Dwayne L'ane Dodge <br />Charge Cost to (n�me if different lhan owner) <br />Address 7800 Evergreen Way Ci[y Everett <br />Installation Location <br />Public Works Deparfinent <br />Utilities Di��sion, 3200 Cedar Street <br />Everett, Washington 98201 <br />(425)257•8800 <br />Date Paid <br />Work Order ;f <br />Service Onler # <br />Telephone �# <br />Date of Reques[ <br />Zip 98203 <br />Installation [ype/description/size/etc. 8" fire servlce Hot tap 12" main in Evergreen and run 8" D.I. <br />pipe ta customer supplied and installed and piped through vault. MaKa final connection and restore <br />atter purity. <br />❑ The following estimate is based upon the Utilities Division providing all labor, equipment, materials, <br />resroration, and final hook-up. <br />Plcasc notifv the Citv of' �verett Utilitics Division 10 workine davs in advance of -equired installation date to <br />nllow for scheduline and parts nrocurement <br />Whenever lhe estimatec; cost is not suflicient lo cover lhe tolal expense for labor, naterial, equipment renlnl and <br />administra6ve costs, thc deficit shall be charged to the property for which such installation was made and thc owner <br />thereof, and provided further, that any excess payment shall be returncd to thc person applying for the inslallation. <br />*Deposit must be paid prior to ordering parts or scheduling work. <br />WATER METERS3"AND LARGER MAYHAVEA SIX TO 10 WEEKLEAD TIME. <br />Material <br />Labor anJ Benefits <br />Equipment P.ental <br />Tax <br />TOTAL <br />•Vault must be utility H4484 wi�h TL2-332P LID <br />Prepared by: <br />Accepted by: <br />5 �.\MCnmmon� keica�Co�tevW wa�nehrcJudge.�OC <br />5,060.QJ <br />2,090.00 <br />752.00 <br />138.00 <br />$8,040.00 <br />cc: Bldg. Pcrmit Centcr <br />M:vk Sadlcr <br />Kirk Brooks <br />Gordon Witcher <br />Robcrt Waddle <br />Stan Mitchell <br />F�ul T7cKce <br />Cietry Ccum <br />Alan Locke <br />Date Est. <br />Prepared: Representing: <br />5-29-02 <br />�l,o. <br />of_ <br />
The URL can be used to link to this page
Your browser does not support the video tag.