Laserfiche WebLink
:, <br />i <br />CLOSED CM WORR ORD�RS REPORT <br />Total Utility Maintenance Management System page 1 <br />03/11/1998 <br />Date Range OlI09I1989 - 02I27/1998------- <br />CM Work Order Range :0810800810001 - UT2830-30-322Pattern s*101236710119 <br />Item Range :<Blank> - WVL3694L05 Pattern : <br />Program ALL Function ALL Activity ALL _____________________________ <br />CM WORK ORDER ID: 7101236710119 Title: REPLACE 7903 EVERGREEN WAY <br />«DUPLICATE PRINTING OF THIS WORK ORDER» <br />Item ID: DCB0785V28 -- CA'PCH SASIN <br />Location ID: -" Activity 671 <br />Program 710 Function 123 <br />Date Completed: 02/19/1998 <br />Overall Craft: <br />Issued: 02/19/1998 <br />Out of Service? NO <br />Meter Reading: <br />Downtime: 0 hours <br />Status: <br />Labor: <br />Craft ID <br />SUP1 AGA <br />iTI, AMA <br />HEO LDC <br />HEC MCC <br />EO MJE <br />DLI PCW <br />DLI QDR <br />HEO SDD <br />t7i, WAD <br />Materials: <br />ID <br />BRIC00061156 <br />CEME00061438 <br />Veuiclea: <br />ID <br />V0010 <br />V2112 <br />V2152 <br />V3200 <br />V3603 <br />V6401 <br />V6807 <br />VJ0002 <br />Issued by: AGA Assigned to: <br />Priority: Travel Time: 0.00 Hr. <br />Name <br />AHLES, GREGORY A. <br />ALLEN, MARK A. <br />LITZ, DAVID C. <br />I+IP.GEE, CARI: C. <br />MCNIVEN, JOHN E. JFc• <br />PTJGH, CAMERON W. <br />QLfINN, DAVID R. <br />S7'ECHER, D_ANIEL D. <br />Wl'ERSMA, P?,EX D. <br />Description <br />BRICK CONCRET� 2" X 4" X 8" <br />CEMENT 20 MIN. SET 50 LB. BAG <br />Descri�tion <br />�92 GMC 510 PU <br />91 CHEV 1 TON <br />87 DODGE W/HOIST <br />SO CASE VIBROirIAX W25 ROLLEP. <br />86 CASE BACKHOE 780 <br />80 CASE FLATBED TRAILER <br />g9 COMPRESSOR IR <br />93 INTERNATIONAL 10 YD <br />Plai�ned Hrs <br />-------0.00 <br />0.00 <br />O.Ou <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />Actual Hrs <br />1.00 <br />2.00 <br />2.00 <br />5.00 <br />G.00 <br />2.00 <br />5,00 <br />5.00 <br />5.00 <br />Total Labor Cost: <br />Date # Used <br />02/19/1998 � <br />U2/19/1998 1 <br />Total Material Cost: <br />Hours <br />1.00 <br />2.00 <br />5.00 <br />2.00 <br />5.00 <br />2.00 <br />5.00 <br />5.00 <br />Cost- <br />5.30 <br />12.20 <br />24.00 <br />37.72 <br />194.50 <br />0.00 <br />24.00 <br />105.00 <br />Cost <br />23.16 <br />32.40 <br />42.10 <br />106.OU <br />40.18 <br />18.O�Q, <br />45.00 <br />104.55 <br />65.85 <br />----477.24 <br />Cost <br />