MtC:HANIC:AL 5YM�3UL5 LtC�tNU HVAL tNtKC�Y LUU� NU I t5 At�t�KtVIA I IUNS
<br /> HYDRONIC SYSTEM LABELS REFERENCE SYMBOLS
<br /> 1 . SEE SCHEDULE FOR EQUIPMENT TYPE, CAPACITYAND EFFICIENCY. ACT ACOUSTICAL CEILING TILE MEZZ MEZZANINE �
<br /> 2. PROVIDE MICROPROCESSOR-BASED THERMOSTAT FOR HEAT PUMP CONTROLS WHICH MINIMIZES THE USE OF ELECTRIC ADA AMERICANS WITH DISABILITIES ACT MIN MINIMUM OR MINUTE q, �� ,
<br /> PIPE BREAK(CONTINUATION) HEAT DURING START-UP, SET-UP AND DEFROST. CONTROLS SHALLANTICIPATE NEED FOR HEATAND USE COMPRESSION ADJ ADJUSTABLE MISC MISCELLANEOUS -
<br /> DETAIL NUMBER HEATING AS THE FIRST STAGE. CONTROLS SHALL INDICATE WHEN ELECTRIC HEAT IS BEING USED. ELECTRIC HEAT SHALL AFF ABOVE FIf�ISHED FLOOR
<br /> HYDRONIC SUPPLY M�1 SHEET NOT OPERATE ABOVE 40 F OUTSIDE AIR TEMPERATURE. AFG ABOVE FINISHED GRADE NfA NOTAPPLICABLE
<br /> ----- HYDRONIC RETURN O 3. PROVIDE THERMOSTATCONTROLS CAPABLE OFAT LEASTA FIVE (5) DEGREE DEADBAND BETWEEN HEATINGAND COOLING. ALT ALTERNATE NC NORMALLYCLOSED � " � �
<br /> FLAG NOTE 4. FOR ALL BUT GROUP R THERMOSTATS, PROVIDE PROGRAMMABLE AUTOMATIC SETBACK CONTROLS WITH NIGHT
<br /> AP ACCESS PANEL NEG NEGATIVE s
<br /> DIRECTION OF FLOW SETBACKAND SEVEN {7y DIFFERENT DAYTYPES. APPROX APPROXIMATE NIC NOT IN CONTRACT
<br /> 1� REVISION TAG 5. FOR PRIMARYGROUP R THERMOSTATS, PROVIDE PROGRAMMABLE 5-2 SCHEDULE WITH AT LEAST 2 SETBACK PERIODS/DAY. 192 Nickerson, Suite #300
<br /> ] CAP 6. PROVIDE AMCA CLASS 1A MOTORIZED CONTROL DAMPERS FOR OUTSIDE AIR INTAKES, EXHAUST OUTLETS AND RELIEF ARCH ARCHITECTURAL/ARCHITECT NO NORMALLYOPEN Seattle, Washington 98109
<br /> WHICH CLOSE AUTOMATICALLYWHEN THOSE SYSTEMS ARE NOT IN USE, DURING BUILDING WARM-UP AND SETBACK. AS AIR SEPARATOR NOM NOMINAL Phone: 206.285.2966 •
<br /> -�0�- HEAT TRACED PIPING AHU-1 MECHANICAL EQUIPMENT AUX AUXJ�IARY NPT NATIONAL PIPE THREAD
<br /> GRAVITY BACKDRAFT DAMPERS ARE ALLOWED FOR SYSTEMS WHICH OPERATE CONTINUOUSLY OR FOR GROUP R
<br /> pBD DIFFUSERIGRILLE TYPE AIRFLOWS �400 CFM. NTS NOTTO SCALE -
<br /> CFM 7. PROVIDE GAS-FIRED HEATING EQUIPMENT WITH MODULATING OR STAGED CONTROL FOR ALL EQUIPMENT OVER 225 MBH. BFF BELOW FINISHED FLOOR
<br /> HYDRONIC VALVES AND SPECIALTIES 8. PROVIDE A MEANS OF BALANCING EVERYAIR INLETAND OUTLETAND EVERYAIR OR WATER TERMINAL DEVICE. BHP BRAKE HORSE POWER OA OUTSIDE AIR
<br /> 9. SIMULTANEOUS HEATING AND COOLING IN A ZONE IS NOT PERMCfTED. BLDG BUILDING OBD OPEN BLADE DAMPER
<br /> � 1 SECTION NUMBER 10. SEAL TRANSVERSE AND LONGITUDINAL SEAMS, JOINTS AND CONNECTIONS OF ALL DUCTWORK. BOP BOTTOM OF PIPE OC ON CENTER
<br /> 2-WAY ELECTRIC CONTROL VALVE SHEET NUMBER 11 . PROVIDE DUCT INSULATION PER ENERGY CODE SECTION C403.2.7 AND SPECIFICATION SECTION 23 07 00.
<br /> F.O. FAIL OPEN T BTU BRITISH THERMAL UNIT OD OUTSIDE DIAMETER
<br /> F.C. FAIL CLOSED 12. PROVIDE PIPE INSULATION PER ENERGYCODE SECTION C403,2.8 AND SPECIFICATION SECTION 23 07 00. BTUH BRITISH THERMAL UNIT PER HOUR OFCI OWNER FURNISHED
<br /> ' 13. INSULATION EXPOSED TO WEATHER SHALL BE PROTECTED FROM DAMAGE, SUNLIGHT, MOISTURE AND WIND. CONTRACTOR INSTALLED '
<br /> LIFE SAFETY SYMBOLS ADHESIVE TAPE IS NOT PERMITTED. CA COMBUSTION AIR OFOI OWNER FURNISHED
<br /> 3-WAY ELECTRIC CONTROL VALVE 14. ALL PIPE AND DUCT INSULATION SHALL BE LABELLED WITH ITS THICKNESS AND INSULATING VALUE �R OR K).
<br /> 15. FAN MOTORS 1/12 HP UP TO 1 HP SHALL BE ECM. CFH CUBIC FEET PER HOUR OWNER INSTALLED TRAILSIDE �
<br /> � CEILING RADIATION DAMPER 16. POLYPHASE MOTORS 1 HP OR MORE SHALL MEET EFFICIENCYREQUIREMENTS OF ENERGYCODE C403.2.13. CFM CUBIC FEET PER MINUTE VILLAGE
<br /> 4-WAY CONTROLVALVE 17. FAN SYSTEMS OVER 5 HP SHALL MEETALLOWABLE FAN POWER LIMIT PER ENERGYCODE C403.2.10. CLG CEILING JP PRESSURE DIFFERENTIAL �
<br /> 18. AIR ECONOMIZERS SHALL HAVE FIXED DRY BULB HIGH-LIMIT SHUTOFF CONTROL NOT TO EXCEED 75 DEG. F. CC� CARBON MONOXIDE PERF PERFORATED APARTMENTS
<br /> �� OR � COMBINATION SMOKE/FIRE DAMPER 19. ECONOMIZERS SHALL BE SEQUENCED WITH MECHANICAL COOLINGAND SHALL BE CAPABLE OF PROVIDING PARTIAL CO2 CARBON DIOXIDE �OR PH PHASE 1300 100TH PLACE S.E.
<br /> DUCTWORK LABELS ECONOMIZER COOLING EVEN WHEN ADDITIONAL MECHANICAL COOLING IS REQUIRED. COND CONDENSATE PLBG PLUMBING EVERETT, WA 98208
<br /> ----� HORIZONTAL SMOKE DAMPER HVAC GENERAL NOTES C�11 COLD WATER POC POINT OF CONNECTION
<br /> - - - - - - 1 . THESE PLANS ARE SCHEMATIC AND DO NOT SHOW EXACT ROUTING OR EVERYOFFSET WHICH MAY BE REQUIRED. CX CONNECT TO EXISTING PRESS PRESSURE �
<br /> � - - - - - - INTERNALLY LINED DUCT -----� FIRE DAMPER ' PRV PRESSURE REDUCING VALVE
<br /> THE HVAC CONTRACTOR IS TO COORDINATE 1lUITH ALL OTHER TRADES AND IS TO VERIFYALL CLEARANCES BEFORE
<br /> COMMENCING WORK. dB DECIBEL PSF POUNDS PER SQUARE FOOT �
<br /> HIDDEN DUCT 2. MATERIALS, METHODS AND INSTALLATION SHALL COMPLYWITH THE PROVISIONS OF THE LATEST EDITION OF THE DB °F DRY BULB TEMPERATURE PSI POUNDS PER SQUARE INCH '
<br /> CONTROL SYMBOLS INTERNATIONAL MECHANICAL CODE, INTERNATIONAL BUILDING CODE, INTERNATIONAL ° OR DEG. DEGREE PSIG POUNDS PER INCH GAUGE �
<br /> 16X12 DUCT (1ST DIMENSION SIDE SHOWN, FIRE CODE AND LOCAL CODES AND ORDINANCES. QS OR DIA DIAMETER PTAC PACKAGE TERMINAL
<br /> 2ND DIMENSION OTHER SIDE) ____J VOLUME DAMPER 3� DUCT CONSTRUCTION AND HANGING SHALL COMPLYWITH THE LATEST SMC AND WITH CURRENT SMACNA STANDARDS. DN DOWN AIR CONDITIONER
<br /> 4. JOINTS OF DUCT SYSTEM SHALL BE SEALED WITH GASKETS OR LISTEa MASTIC TYPE DUCT SEALANT, DWG(S} DRAWING(S j
<br /> > > REMOVE DUCT, PIPE OR -'--� MOTORIZED CONTROL DAMPER 5. DUCTS SHALL BE INSULATED AS INDICATED ON PLANS TO MEET THE REQUIREMENTS OF THE CURRENT pV111/ DRAIN, WASTE, VENT QTY QUANTITY
<br /> C �� MECH. EQUIPMENT ----�T THERMOSTAT IN DUCT wASHINGTON STATE ENERGYCODE AND SPECIFICATION. . ,
<br /> 6. FLEXIBLE DUCTS SHALL ONLY BE USED WHERE SHO�VN AND SHALL NOT EXCEED 6 FT IN LENGTH UNLESS preservation
<br /> -----� REMOTE OPERATED VOLUME DAMPER NOTED OTHERWISE. EX EXISTING/EXISTING TO REMAIN REQD REQUIRED
<br /> FLEX DUCT 7. PROVIDE EARTHQUAKE RESTRAINT FOR HVAC EQUIPMENT IN ACCORDANCE WITH THE CURRENT SBC. EA EACH RH RELATIVE HUMIDITY partners -
<br /> ----- BACKDRAFT DAMPER 8. PIPING PENETRATIONS OF FIRE RATED WALLS OR FLOOR SHALL BE SLEEVED AND FIRE STOPPED WITH LISTED MATERIALS EA EXHAUST AIR RM ROOM development
<br /> RECTANGULAR SUPPLY DUCT OUT OF PAGE SO AS TO MAINTAIN THE INTEGRITYAND RATING OF THE FLOOR OR WALL. : EAT ENTERING AIR TEMPERATURE RPBP REDUCED PRESSURE
<br /> � THERMOSTAT, MOUNT@4'-0"A.F.F. g, PROVIDE RETURN DUCTSMOKE DETECTOR(S) FORAUTOMATIC SHUT DOWN OF•ALL HEATING OR COOLING EQUIPMENT ERU ENERGYRECOVERYUNIT BACKFLOWPREVENTER
<br /> RECTANGULAR SUPPLY DUCT INTO PAGE S SENSOR DELIVERING IN EXCESS OF 2000 CFM IN ACCORDANCE WITH THE CURRENT INTERNATIONAL MECHANICAL CODE. POWER ESP EXTERNAL STATIC PRESSURE RPM REVOLUTIONS PER MINUTE 21515 hawthorne blvd., suite 125
<br /> /\ O WIRING AND INTERLOCK WIRING WITH THE BUILDING FIRE ALARM SYSTEM IS BYTHE ELECTRICAL CONTRACTOR. ET EXPANSION TANK RLX RELOCATE EXISTING torrance, ca 90503
<br /> � SUPPLY DIFFUSER CQ CARBON MONOXIDE DETECTOR 10. HVAC EQUIPMENT, VALVES AND DAMPERS SHALL BE LOCATED IN EASILYACCESSIBLE LOCATIONS, UNLESS SHOWN ON EXP EXPANSION RTU ROOF TOP UNIT
<br /> GEF-1 WITH FAN INDICATED ARCHITECTURAL DRAWINGS. REQUIRED ACCESS PANELS SHALL BE PROVIDED BYTHE HVAC CONTRACTOR AND RV RELIEF VALVE
<br /> INSTALLED BYTHE GENERALCONTRACTOR. ��BER�'O
<br /> � FC FAIL CLOSED RX REMOVE EXISTING � I �
<br /> RECTANGULAR RETURN DUCT OUT OF PAGE CARBON DIQXIDE DETECTOR 1 1 . HVAC CONTRACTOR MUST COORDINATE WITH LIGHTING FIXTURES PRIOR TO DUCT AND PIPING INSTALLATION. ��' ��',�'�':
<br /> CO2 FF FINISHED FLOOR -
<br /> � �
<br /> ' RECTANGULAR RETURN DUCT INTO PAGE COMM ISSION I NG NOTES FLA FULL LOAD AMPS SD SMOKE DETECTOR
<br /> ' � PIPING SYSTEM LABELS '
<br /> FO FAIL OPEN SF SQUARE FOOT "d� 9� w� �
<br /> 1 . COMMISSIONWG OF THE MECHANICAL SYSTEMS SERVICE �IVATER HEATING SYSTEMS AND ENERGY METERING SYSTEMS ° T�`� .�
<br /> � OR � RETURN OR EXHAUST GRILLE G NATURAL GAS OR PROPANE IS REQUIRED ON THIS PROJECT IN ACCORD WITH THE COMMERCIAL ENERGYCODE SECTION C408 AND SPECIFICATION FP FIRE PROTECTION S.L. SOUND LINER ��Ss1oNAL E���
<br /> SECTION 230800. THE GOAL OF COMMISSIONING IS TO VERIFYTHAT EQUIPMENT, CONTROLS AND THE SEQUENCING OF SUCH FPM FEET PER MINUT SP STATIC PRESSURE
<br /> BALL VALVE MANUAL LEVER OPERATE AS INTENDED. THE COMMISSIONING DOCUMENTATION THAT IS REQUIRED IS THE PROOF OF THIS OPERATION. THE FPS FEET PER SECOND SPEC SPECIFICATION
<br /> ``� TURNING VANES -� REVISIONS/NOTES
<br /> BUTTERFLYVALVE FOLLOWINGTASKS ARE REQUIRED FOR COMMISSIONING. SEE SECTION 230800 FORADDITIONAL REQUIREMENTS. FT FEET/FOOT S/S, OR SS STAINLESS STEEL
<br /> -��~- MANUAL LEVER 2. A COMMISSIONING PLAN: THE PLAN PROVIDES THE DESIGN INTENT, OUTLINES EQUIPMENTAND SYTEMS TO BE TESTED, FTG FOOTING STD STANDARD � ��E- QE�BIP�JS2L�1- ,
<br /> D ETAILS TEST PROCEDURES AND INCLUDES FORMS FOR RESULTS. SYM SYMBOL _ 3.11.16 PROGRESS
<br /> _� �_ BUTTERFLYGEARVALVE 3. PRELIMIM1IARYCOMMISSIONING REPORT: COMPLETION OF THE COMMISSIONING PLAN NOTING DEFICIENCIES FOUND DURING G NATURAL GAS 4.1.16 50% DD
<br /> STRAIGHT TAP TESTING, CORRECTIVE ACTION TAKEN OR THE ANTICIPATED DATE OF CORRECTION, CONDITIONS UNDER WHICH THE �
<br /> --�J--- GLOBE VALVE MANUAL LEVER GA GAUGE T&P TEMPERATURE AND PRESSURE _5.20.16 DD
<br /> TESTING WAS PERFORMED AND RECORD OF COMPLETED OWNER TRAINING. GAL GALLON
<br /> TAPERED FITTING RELIEF VALVE �
<br /> BALANCE VALVE A. VERIFICATION OF THIS REPORT IS REQUIRED FOR FINAL MECHANICAL INSPECTION AND CERTIFICATE OF OCCUPANCY. _7.15.16 HUD APPLICATION
<br /> � GALV GALVANIZED TBD TO BE DETERMINED
<br /> (CIRCUIT SETTER) B. CODE OFFICIAL MAYREQUEST COPYOF REPORT. G.C. GENERAL CONTRACTOR TEMP TEMPERATURE 2 8.10.16 HUD APPLICATION
<br /> BELL MOUTH FITTING ,�-, BALANCE VALVE 4• WITHIN 9Q DAYS OF RECEIPT OF THE BUILDING CERTIFICATE OF OCCUPANGY, THE REGORD DRAWINGS, O&M MANUALS,
<br /> (PRESSURE INDEPENDENT) FINAL BALANCING REPORT, FINAL COMMISSIONING REPORTAND DOCUMENTATION OF COMPLETED OWNER TRAINING GSM GALVANIZED SHEET METAL TOB TOP OF BEAM -
<br /> SHALL BE SUBMITTED FOR REVIEW. TOC TOP OF CONCRETE
<br /> CONICAL FITTING PIPE TO DRAIN 5. RECORD DRAWINGS: LOCATION AND PERFORMANCE DATA ON EACH PIECE OF INSTALLED EQUIPMENT, AS-INSTALLED H HEIGHT TOD TOP OF DECK
<br /> CONFIGURATION OF DUCTAND PIPE DISTRIBUTION SYSTEM, INCLUDING SIZES, AND THE TERMINAL AIR AND WATER HD HEAD TOJ TOP OF JOIST
<br /> 45 DEG.ANGLE TAP PRESSURE SAFETYVALVE DESIGN FLOW RATES OF THE ACTUAL INSTALLATION. HP HORSEPOWER TOS TOP OF SLAB/TOP OF STEEL - -
<br /> 6. OPERATION & MAINTENANCE MATERIALS: SUBMITALL THE FOLLOWING. HVAC HEATINGVENTILATINGAND T&P TEMPERATURE & PRESSURE - -
<br /> A. EQUIPMENT SIZE, SELECTED OPTIONS, AND REQUIRED MAINTENANCE. AIR CONDITIONING TSP TOTAL STATIC PRESSURE �
<br /> AAV AUTOMATICAIRVENT B. MANUFACTURER'S O&M MANUAL FOR EACH PIECE OF EQUIPMENT. TITLE `
<br /> � ROUND ELBOW OUT OF PAGE C. NAME AND ADDRESS OF SERVICE AGENCY. HW HOT WATER TYP TYPICAL COVER SHEET
<br /> D. CONTROLS MAINTENANCE AND CALIBRATION INFORMATION INCLUDING WIRING DIAGRAMS SCHEMATICS RECORD HX HEAT EXCHANGER
<br /> -'� ROUND ELBOW INTO PAGE AV MANUALAIRVENT DRAWINGS AND CONTROL SEQUENCES. SETPOINTS SHALL BE PERMANENTLYRECORDED IN THESE DOCUMENTS. HZ HERTZ UL UNDERWRITERS LABORATORY
<br /> � NARRATIVE OF HOW EACH SYSTEM IS INTENDED TO OPERATE. UNO UNLESS NOTED OTHERWISE
<br /> � ROUND DUCT OUT OF PAGE � WYE STRAINER 7. BALANCING: ALL HVAC, HYDRONIC AND SERVICE HOTUIFATER SYSTEMS SHALL BE BALANCED BYA LICENSED CONTRACTOR ID INSIDE DIAMETER/DIMENSION �
<br /> IN ACCORDANCE WITH ACCEPTED ENGINEERING STANDARDS AND SECTION 230593. IN INCH/INCHES V VOLT
<br /> F� WYE STRAINER WITH 8• FUNCTIONAL PERFORMANCE TESTING: DEMONSTRATE THE CORRECT INSTALLATION AND OPERATION OF EACH COMPONENT, IN WC INCHES WATER COLUMN VAV VARIABLE AIR VOLUME
<br /> ��, ROUND DUCT INTO PAGE SYSTEM,AND SYSTEM-TO-SYSTEM INTERTIE RELATIONSHIP. CONTROL SYSTEMS SHALL BE TESTED TO ENSURE THAT
<br /> � VALVE AND HOSE END CAP VERT VERTICA� MUP #
<br /> CONTROL DEVICES, GOMPONENTS, EQUIPMENTAND SY�TEMS ARE CALIBRATED, ADJUSTED AND OPERATE IN
<br /> ROUND DUCT BREAK(CONTINUATION) ACCORDANCE WITH THE SEQUENCE OF OPERATION. KW KILOWATffKILOWATTS VFD VARIABLE FREQUENCYDRIVE PERMIT#
<br /> v- HEAT TRACE PIPING 9. OWNER TRAINING: SYSTEM/EQUIPMENT OVERVIEW(WHAT IT IS, WHAT IT DOES AND WHICH OTHER SYSTEMS AND OR VIB VALVE-IN-BOX SDOT#
<br /> EQUIPMENT DOES IT INTERFACE WITH). REVIEW OF THE AVAILABLE O&M MATERIALS. REVIEW OF THE RECORD DRAWINGS LAT LEAVING AIR TEMPERATURE VOL VOLUME
<br /> -� HOSE ENDAND CAP ON THE SUBJECTSYSTEMfEQUIPMENT. HANDS-ON DEMONSTRATION OF ALL NORMAL MAINTENANCE PROCEDURES, DRAWN
<br /> RECTANGULAR DUCT BREAK(CONTINUATION) LBS POUNDS KS
<br /> NORMAL OPERATING MODES, AND ALL EMERGENCYSHUTDOWN AND START-UP PROCEDURES. CHECKED
<br /> EXPANSION LOOP 10. FINAL COMMISSIONING REPORT: RESULTS OF ALL FUNCTIONAL PERFORMANCE TESTS. LF LINEAL FOOT WJ WITH DF
<br /> FLEX CONNECTION a. DISPOSITION OF ALL DEFICIENCIES FOUND DURING TESTING, INCLUDING DETAILS OF CORRECTIVE MEASURES LRA LOCKED ROTOR AMPS '�f/IN WITHIN ISSUE DATE 08.12 16 '
<br /> USED OR PROPOSED. LTG LIGHTING W/a WITHOUT JOB NUMBER
<br /> B. ALL FUNCTIONAL PERFORMANCE TEST PROCEDURES USED DURING THE COMMISSIONING PROCESS INCLUDING LWT LEAVING WATER TEMPERATURE V1IB °f WET BULB TEMPERATURE 16011 .
<br /> MEASURABLE CRITERIA FOR TESTACCEPTANCE, PROVIDED HEREIN FOR REPEATABILITY. WC 1NATER COLUMN SHEET NO.:
<br /> 11. BUILDINGS OR PORTIONS THEREOF, SHALL NOT BE ISSUED A FINAL CERTIFICATE OF OCCUPANCY UNTIL SUCH TIME THAT THE �
<br /> BUILDING OFFICIAL DETERMINES THATTHE PRELIMINARY�OMMISSIONING REPORT REQUIRED BYTHIS SECTION HAS BEEN MBH 1000 BRITISH THERMAL WPD WATER PRESSURE DROP M 1 . O �
<br /> COMPLETED. THIS MAYBE ACCOMPLISHED BYSUBMITTING THE COMMISSIONING COMPLIANCE CHECKLIST. UNIT PER HOUR V1lT WEIGHT
<br /> 12. THE MECHANICAL CONTRACTOR SHALL NOT BE CONSIDERED SUBSTANTIALLYCOMPLETE UNTIL THE PRELIMINARY MED MEDIUM
<br /> COMMISSIONING REPORT HAS BEEN APPROVED BYTHE ENGINEER. MEP MECHANICAL, ELECTRICAL