My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8125 EVERGREEN WAY DISCOUNT TIRE 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
8125
>
DISCOUNT TIRE
>
8125 EVERGREEN WAY DISCOUNT TIRE 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/24/2018 2:01:01 PM
Creation date
10/24/2018 1:45:36 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
8125
Tenant Name
DISCOUNT TIRE
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
290
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
� <br />DisCount Tira, Co. - TIA <br />February 19, 1993 <br />Page 2 <br />I INTRQt2�1�'d'i� <br />The proposed project consists of developing a 45,317 square loot <br />aite at the intersection of Evergreen Way and SR-526 WB Off Ramp <br />as shown in th�h81CititofMEverettrg ThieTProjectawill bdrlocated <br />zoned C-i, by Y <br />wi�hin tha City Limita of Everett, washinqton approximately <br />eighty blocks south o! the downtown core. Development as <br />plannad within tha site as shown, will be a 7,277 aquare Poot, 8- <br />bay, Discount Tire, Co. store, and the proposed land use is <br />consistent with the existing C-1 zoning. Tha propoead <br />Fiqurop2enthesProPased�development wil�lrhave aAsinqle accesa Prom <br />approximately 350 leet north of the SR-526 WB Ramps/Evergreen Way <br />intersection. <br />Conatruction oE the prcposed project is expected to occur <br />sometima in 7.993. Therefora, tor analysis tha buildout year Lor <br />this lacility will be assumad to be 1993. <br />� g_YrrrrN� G�OPD'�'d70RS <br />Due to the racent compie�tion oE a TIA by DOWL Engi:��ers for �he <br />proposad expansion ot th,e Rmart facility directly across the <br />street, this project ia expecte8 to impact the lollowing atreete <br />and intersections, ' <br />• Everqreen <br />• Everqrean <br />• Evarqreen <br />• Everqre�n <br />. Evergreen <br />� Evergreen <br />Way <br />Way <br />way <br />Way <br />Way <br />Way <br />(Paciilc HighWay/SR-99) <br />And Madison Streat <br />�nd 75th strcet SE <br />and 79th Plaae SE <br />and SR 526 WB Rampe <br />and SR 526 EB Ramps <br />� <br />The proposed project liea elonq Everqreen Way at the intersection <br />with the SR -526 WS Ramps, as ahown in Figur� 1. Evergrean Way <br />within tha project vicinity exista as the City o! Everatt's <br />designation !or Stata Route (SR) 99 north o! SR-526. South o! <br />SR-526 this facility has tha deaignpt{nci�a�p�*atecUrbanWA�terial, <br />South. The existinq facility is a� <br />HiChwgy and ia intended to carry larqe volumes o! traitic batween <br />nodae through varying land uee zones. Tha highway currently <br />Pacilitates the movement ot commuting vehicleii durinq peak times <br />between their deatinations in south EvereThr��u houtsthe�dayhthis <br />County, Lynnwood and north King County. 9 <br />facility also provides !or tha movement oP cummarcn throughout <br />it�s lenqth. SR-99 exiets as !ar a�uth as Tacoma and extends as <br />far north as Everett. When constructed this highway saqment <br />provided the only major north/soutih link between the population <br />centers alonq tha southwesr side oP Puget Sound. Since, then it <br />has baen replaced by Znterstate 5 Eor longer internodal trips '� <br />lound inrindustrialized areas�ngThrou9hout�it'silengthdSR-99i � <br />
The URL can be used to link to this page
Your browser does not support the video tag.