My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinance 3625-18
>
Ordinances
>
Ordinance 3625-18
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/25/2018 9:20:39 AM
Creation date
10/25/2018 9:20:27 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
3625-18
Date
10/17/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
with this Franchise. Any funds the City erroneously or wrongfully withdraws from the Assurance <br /> shall be returned to Grantee with interest,from the date of withdrawal at a rate equal to the prime rate <br /> of interest as quoted in the Wall Street Journal. <br /> 7. REPORTS AND RECORDS <br /> 7.1. Records Required <br /> Grantee shall at all times maintain,and shall furnish to the City: <br /> A. Within forty-five(45)days after request,as-built maps including all components of the Small <br /> Cell Facility shall be provided to the City. These maps shall be certified as accurate by an <br /> appropriate representative of the Grantee; <br /> B. Upon request, a complete set of maps showing the exact location of all Telecommunications <br /> System equipment and Facilities in the Right-of-Way. These maps shall be certified as <br /> accurate by an appropriate representative of the Grantee; <br /> C. Upon request, a copy of all FCC filings on behalf of Grantee which relate to the operation of <br /> the Telecommunications System in the Rights-of-Way; <br /> D. Upon request, all construction activity for the previous twelve(12)months; and <br /> E. Upon request,any records of Grantee,its parent corporations,and affiliates reasonably related <br /> to the administration of this Franchise. <br /> If Grantee fails to comply with this Section,the City may,in its sole discretion,withhold future City- <br /> issued permits until Grantee complies this Section. By way of example only, City may delay issuing <br /> a permit for the installation of a Facility until Grantee provides the City a copy of certified as-builts <br /> of completed Facilities,including underground components. <br /> The City may request in writing copies of any records described above, and Grantee shall provide <br /> such copies within forty-five (45) days of the receipt of such request. One (1) copy of all requested <br /> records shall be furnished to the City,at the sole expense of Grantee. If the requested records are too <br /> reasons cannot be copied or removed, then Grantee may request, in <br /> for securityp <br /> voluminous, or <br /> writing within ten (10) business days, that the City inspect them at Grantee's local office. If any <br /> records of Grantee are not kept in a local office and not made available as copies to the City upon <br /> written request as set forth above, and if the City determines that an examination of such records is <br /> necessary or appropriate for the performance of any of the City's duties,administration or enforcement <br /> of this Franchise,then Grantee shall pay all reasonable expenses incurred by the City in obtaining and <br /> making such examination. Grantee shall reimburse the City for such expenses within sixty(60)days <br /> of the City's request for reimbursement, including documentation reasonably sufficient to evidence <br /> the expenses incurred. <br /> Seattle SMSA Limited Partnership <br /> (Verizon Wireless) <br /> Small Cell Franchise 17 of 33 <br />
The URL can be used to link to this page
Your browser does not support the video tag.