My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018/10/24 Council Agenda Packet
>
Council Agenda Packets
>
2018
>
2018/10/24 Council Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 9:22:32 AM
Creation date
10/30/2018 9:21:09 AM
Metadata
Fields
Template:
Council Agenda Packet
Date
10/24/2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
155
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fu <br /> Section 3 Effective January 1,2021: <br /> Section 3.1: Water and Sewer System Development Charges <br /> Water System Sewer System Total Water and <br /> Development Development Sewer System <br /> Meter Size Fee Charge Development Charges <br /> $4,190 $5,422 $9,612 <br /> 1"domestic/fire* $4,190 $5,422 $9,612 <br /> 1" $6,997 $9,055 $16,052 <br /> 1/" $13,952 $18,056 $32,008 <br /> 2" $22,332 $28,901 $51,233 <br /> 3" $41,898 $54,233 "$96,122 <br /> 4" $69,845 $90,390 • $160,235 <br /> 6" $139,647 $180,726 $320,373 <br /> 8" $223,444 $289,173 $512,616 <br /> 10" $321,235 $415,730 $736,964 <br /> 12" $471,356 $610,012 $1,081,368 <br /> *Domestic/Fire combination meter for Single Family Residences and Duplexes <br /> reviewed under the International Residential Code,upsized due to the addition of a <br /> fire sprinkler system <br /> The above table contains charges for inside City limits. Areas outside City limits, <br /> but connected to the City's water and sewer system, shall be charged the inside- <br /> City-limits charge plus a 25%surcharge. <br /> Section 3.2: Stormwater System Development Charge. In addition to water and sewer <br /> system development charges,there shall be a stormwater system development charge <br /> based on square footage of impervious area*: <br /> Development Type Stormwater System Development Charge <br /> New Construction Base Charge(1 ISU 5.2500 sf):$659 <br /> Additional charge for impervious area>2500 sf: $0.2633/sf <br /> Existing <br /> Development adding Calculated per square foot of added impervious surface area at <br /> new impervious $0.2633/sf <br /> surface area <br /> ISU=Impervious Surface Unit,defined as 2500 sf of impervious surface area. <br /> *Impervious Area as defined in the Washington State Stormwater Management Manual for <br /> Western Washington <br /> 4 <br /> 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.