Laserfiche WebLink
10/10/2018 <br /> Changes to Ordinance <br /> Current Ordinance Proposed Ordinance <br /> • Fees based on type of • Fees based on water meter size <br /> construction/commercial use (industry standard) <br /> • Stormwater fee embedded • Separate stormwater fee <br /> with sewer fee based on impervious area <br /> • Fees defined as special • Fees defined as system <br /> connection charges development fees <br /> 4 <br /> 10/10/201,3 4ETT <br /> CICv of Eueret! J <br /> Water & Sewer Fee Comparison <br /> $20,000 <br /> $16,000 <br /> $12,000 <br /> $9,078 <br /> $8,000 - — ---- <br /> • <br /> E -0 <br /> $4,000 '5 tio <br /> c v Lc o <br /> = v a E <br /> Tu > v <br /> $0 m w w <br /> Water & Sewer System Development Fees ., .. <br /> (3/4" Meter Size) <br /> 10/10/2018 4'u <br /> City of Everett <br /> 14 <br />