Laserfiche WebLink
Document management portal powered by Laserfiche WebLink 9 © 1998-2015 Laserfiche. All rights reserved.
� A PORTION QF THE S.W. 1 /4 OF THE N.E. 1 /4 OF <br /> S E C TI 0 N 6, T.2 8 N. , R.5 E. , W.M. Erosaon control�votes: <br /> . . � S N 0 H 0 M I S H C�U N T , .WA S H I N G TO N l. The�on�a��or shall pro��ae per�od��S�eet�lean�nb to Temove any�ea�men� <br /> tracked off the site. <br /> 2. The contractor shall perform routine inspection and maintenance of all installed <br /> erosion and sedment control BMPs,especially after storms <br /> INSTALL <br /> APPROX.LOCATION OF CONSTRUCTION ENTRANCE HIDDEN GREENS � <br /> EX.30"WATER LINE PER PROTECT DOWN STREAM ROCK PAD A CONDOMINIUM <br /> 3. Appropriate measLires shall be taken to stop sediments&om entering water�vays <br /> RECORD INFORMATION �. INLETS WITH COE STD.DWG.:201 AF#20 07 07 20 531 5 if t11e pTOpOSeC�BMPS fall. <br /> � � STORM DRAiN INLET PROTECTIaN <br /> � . <br /> 4. Bare and/or disturbed soils shall remain uncovared and/or unstabilized for no <br /> � V z TEMPORARY SILT FENCE � <br /> O � O FND REBAR&CAP COE STD.DWG.:214 - ri10T'0��lari 2 dayS f['OIri OCtObOT I �1TOUgI1 April 3O,aY1C�fOI'ri0 ri10T0 tI11ri 7 dayS <br /> APPROX.LOCATION OF � w X !.5#'S 12055/22969 <br /> EX.8"WATER LINE PER X > w fTOIri 1�1y1 t�1TOUg11 SO�lteTri�OI'3�. <br /> w � S0.03,E0,03 EX. BLOCK wAu. <br /> RECORD INFQRMATION � . 6' BOARD FENCE sso�o'ao� 2so.00 <br /> �' a� ,�' �, u"mis+�s�av <br /> � � <br /> �'°°�°°' Certified Erosion and Sediment Control Specialist: <br /> ( REMovE ex wn� The name and phone number of the Certi�ed Erosion and Sediment Control <br /> EX.IE=392.11 W Specialist will be identi�ed right prior to construction(when contractor has been <br /> U a selected) <br /> � a � � � <br /> AFTER INLET INSTALATION '� a a Inspection ancl Monitoi'1riQ: <br /> PROTECT WITHi � �° All BMPs shall be inspected maintained and repaired as needed to assure <br /> INLET FABRIC FENCE FlLTER ��� o � <br /> • COE STD.DWG.:212 6 ' � continued performance of their intencled function. Site inspections shall be _� <br /> � � � � conducted by a person who is knowledgeable in the principles and practices of <br /> � � � � � erosion and sediment control.The person rnust have the skills to 1)assess the site <br /> D � § � conditions and construction activities that could impact the qualiry of sto�nwater, <br /> �5 and 2)assess the effectiveness of erosion and sediment control measures used to <br /> � �"�'"'r�" � s <br /> � � �,�°"'° � control the quality of stormwater ctischarges. <br /> W z , � <br /> � � 0 p p � � � Seasonal Work Limitations: <br /> oRn`e � � 0 � � From October 1 through April 30,clearing, grading,and other soil disturbing <br /> Z Q c� � � activities shall only be permitted if shown to the satisfaction of the local <br /> -, <br /> � � � -005 GRAPHIC SC1�Z,E permitting authoriry that silt-taden runoffwill be prevented from leaving the site � <br /> � � � through a combination of the following: <br /> 20 0 10 20 40 a. Site conditions including existing vegetative coverage,slope,soil type,and <br /> �-� d � a °� proximity to surface waters;and � <br /> � '� c� b. Limitations on activities and the extent of disturbed areas;and <br /> ' / LOT 26 � ( IN FEET ) c. Proposed erosion and sediment control measures. <br /> r� x 1 ineh = 20 ft. The following activ'ities are exempt from the seasonal clearing and grading <br /> "� � �, � � � limitations: � <br /> �,� ' �x '� �' l. Routine maintenance and necessary repair of erosion and sediment conirol BMPs; <br /> N CA EN oN z 2. Routine maintenance of public facilities or existing utility structures that do not <br /> � (� LEGEND expose the soil or result in the removal of the vegetative cover to soil;and <br /> �s-2-�4 <br /> � � FOUND MONUMENT � 3. Activities where there is one hundred ercent infiltration of surface water runoff <br /> X- � � WATER METER p <br /> .�� — � x x x x s�oo� a.�o,00 �,M1 AS DESCRIBED within the site in approved and installed erosion and sediment control facilities. <br /> g � a�� � FOUND CORNER � FIRE HYDRANT <br /> g � � ' s AS DESCRIBED �cV lRRIGATION CONTROL VALVE Erosion Control BMPs Maintenance: <br /> $� f \ b � 1. All temporary and permanent erosion and sediment control BMPs shall be maintained <br /> ❑ CATCH BASIN � POWER POLE and repaired 1s needed to asst�re contimied performance of their intended function. <br /> °� � �� Q� QS SANITARY SEWER MANHOLE � POWER VAULT Maintenance and repair shall be conducted in accordance with the BMP specificaUons. <br /> 00 � � ELEC J/80X 2. All temporary erosion and sediment cantrol BMPs shall be removed within 30 days <br /> �Q WATER VALVE after final site stabilization is achieved or after the temporary BMPs are no longer <br /> � TELEPHONE VAULT needed. <br /> �+^ � � GABLE TV PED 3. Trapped sediment shall be removed or stabilized on site.Disturbed soil resulUng from <br /> removal of BMPs or vegetation shall be permanently stabilized <br /> FND CONC MON <br /> IN CASE <br /> '2-2-'4 CLEARING LIMITS NOTE: ENTIRE SlTE WILL CLEARED FOR CONSTRUCTION ACTIViTiES <br /> T.E.S.C. LEGEND � <br /> . <br /> O � O Stabilized Construction Entrance/Exit PER COE STD. DWG.: 201 <br /> TOTAL PROJECT AREA: 27 500 SF <br /> DEVELOPED IMPERVIOUS AREA: <br /> PROTECT NEW INLETS: PER COE STD. DWG.: 208, 209, 210, OR 212 STRUCTURES 11,097 SF <br /> DRIVEWAYS 6,610 SF <br /> SILT FENCE PER COE STD. DWG.: 214 WALKWAYS 1,432 SF <br /> CONTROLING/COLLECTING ON-SITE RUNOFF: SILT FENCE WITH J-�-IOOKS PER COE STD. DWG.: 214 <br /> TOTAL 19139 SF <br /> EXISTING IMPERVtOUS AREA: � <br /> HOUSE STRUCTURE 885 SF <br /> �' � ��'�� DRIVEWAYS 560 SF <br /> , � � � SILT FENCE WITH j-HOOKS PER COE STD. DWG.: 214 SHEDS (3) 865 SF <br /> TOTAL 2 310 SF <br /> TOTAL NEW IMPERVfOUS AREA: 16 829 SF' <br /> Soil Amendment: <br /> The area where soils have been disttirbed,the soil shall be amended according to the following procedures: NOTE: EXISTING HOUSE AND SHEDS TO BE <br /> DEMOLISHED AND REMOVED <br /> 1. Scarify subsoil to a depth af one foot. � <br /> _ 2. In planting beds,will place three inches of compost and till in to an eight-inch depth. <br /> 3. In+..urf areas,will plaee two inehes of compost and till in to an eight-inch depth. <br /> 4. Apply two to four inches of arborist wood chip,coarse bark mulch,or compost mulch � <br /> GRATE 5" MAX. —TRIM GEOTEXTILE �� PERFORM hAAINTENANCE IN ACCORDANCE WI'M STAN�ARD SPECIFICATION 8-01.3(75). t0 jJl�lTl.t121g bOC�S.aftPJr f1Y111 p�aTltlTlg. <br /> . � ?. SIZE THE BELOW GRATE INLET DEVICE (BGID) FOR THE STORM NlATER STRUCTURE � <br /> IT WILL SERVICE. <br /> fRAME —OVERFL044 BYPASS 3. THE BGID SHALI.HAVE A BUILT-IN NIGH-FLO'N RELIEf SYSTEM (OVERFI.OW BYPASS). P/L � � <br /> d'a °'`' 4. TFiE RETRIEVAL SYSTE'M MUST A!lOW REMOVAL OF TriE 9GID VfITHOUT SPILLING THE n � 2� MIN SETBACK CONSTI�UCTION SEQUENCEs <br /> • � �•'a � COLLECTED MATERIAL. - 2M�N 2 MIN <br /> <'a Q'.o <br /> '°° °' S�OIfdcNT AND DEBRIS 1r— AtAX FILL SLOPE 1. �IT'a]1ge and d�t011C1 pT'0-CO11S�lUCt1021111B0tffig. �,'f,Ttl�l@(� ?�IOS1011 CO11tP01 Sp8C1a11St S�lall b0 1CIe11t1�10C1 c1�tlle <br /> . o,c :o;. GRATE � � . . <br /> RETRIEVAL SYSiEM <br /> •�' �,-�, - ��<, 2 MI EXST GR�UND pT0-COi1StTUCt10Y1 T11e0t121�,'. <br /> '� ° ` SITE GRADING: 2. Flag property lines and clearing limits. <br /> �e �MAX CUT SL�PE <br /> 2 2 0 C Y C U T A N D F I L L 3, Install erosion control measures and devices per approved plans. <br /> FlLTERED <br /> a� = iis ��;T � cu";'�a°��az" 4. Install silt fences or hay bales controls;install eatch basin protection inserts;adjust as needed during construction. <br /> wareR Inst�re all surface flows are controlled and routed through TESC control � <br /> TYP CUT 8c FILL �Ec�'TION 5. Clear grub and rough grade. <br /> . � OVERFLOW BYPASS � AT PROPERTY LtNE � � � 6. Complete site excavation and grading activities in accordance with plans. <br /> .n <br /> � , . � , 7. Install all utilities. <br /> o: ;a. . <br /> � �� cEOTexT��E 8. Hydro seed,mulch, and plant landscape <br /> �a � t� 9. Remove remaining TESC structures after the site has been stabilized and approved by the City inspector <br /> .e. o .. a a..a e� � � �� ���{�/t 12 29 /5 <br /> 4 10. Full compliance with DOE best management practices is required for this project <br /> N0T TO SCALE NOT TO SCALE <br /> � � �Y�/1wa8�i � <br /> STt)RM DR�Il�T INLE'T PROTECTI�lv �� °���� � <br /> � �oR� � � <br /> D 9RIOR TO ST <br /> A2iY C�NSfRUCttOPO � �F�i89 <br /> CT. APPItOYAL f4R - <br /> � R�OJ£CY 25 C0N01Ti0N$L p'� <br /> � GU��P4T S'f NO <br /> �ffi�ERES 2 � <br /> ��At1T iOW . <br /> � � ED, <br /> OWNER fAPPLICANT/CONTACT: MAHER WELAYE, P.E. ,�,�R WF� 1 � UNI'TS CQNI��S <br /> AHMET KULAGA 15516 - 56TH AVE. W ���,°F `""Sy�ti�,��� ERO�ION CONTROL PLAN <br /> 1205 130th St SE UNIT A EDMONDS, WA 98026 � for <br /> EVERETT, WA 98208 PH• (206) 816-0455 A���Z' I�ULAGA <br /> 425-5�1 -6441 maherwe/aye�qmail.com 33264 <br /> �` RF��STERF:O �' DRAWN BY M. W. DATE 11/08/2015 JOB N0. 14-120 <br /> F .�' J� <br /> �iorva� �`� �����,) SITE ADDRESS � <br /> EXPIRES os-zs- 5901 HIGMWAY �L. CHECKED BY M. W. SCALE 1" = 20' SHEET 2 OF 5 <br /> EVERETT, WA 98203 <br />