My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Determination of Completeness <br />Your application for the I�llowing dcscribed project was suUmitted on November 10, 2004. <br />Project #: <br />Location: <br />SEPA # 04-059 <br />9929 Evergreen Way <br />Project Description: Construction of an approximately 16,000 square foot brancli bank <br />and ofGcc building for Horizon Bank. <br />Applicant: Herizon Bank Representative: Richard Jordison, FSI Architects <br />Thc applicnlion has been detennined to Ue complete for puiposes of processing for public revie�v. <br />The application contains information required for Section 4B of Ordinunce #2136-9C. The City <br />will make a written decision on this application within 120 days of this notification, subject to <br />the procedures for detennining time limitations set forlh in tlie City's Administrative Procedures <br />Ordinance #2136-96. <br />Thc City has conducted only a preliminarv review of the application at this timc. A public <br />rcvicw of this application is required. Final requirements and conditions will be detemiined at <br />the conclusion of the public review process and will be contained in the Notice of Decision. <br />Note: This detem�ination of completeness does not preclude the City from requiring additional <br />inforniation or studies if new inforniation is required during Qte review of tt�e proposal or if <br />substantial changes in the proposed action occur. <br />Any yucstions you have regarding this noticc should be dirccted to thc project planner, Faheem <br />Siddiq at (425)257-7142. <br />Dated this 22nd day of December, 2004. <br />(FVe strive to provide spc-cia( nccomniodutrons for in�lini�lunls wilh disaGili�ies. Plense co�rtacl us <br />ns soon ns possib(e if sp�rcia! nccom�r�odalioi�s m•e neeJed.) <br />
The URL can be used to link to this page
Your browser does not support the video tag.