My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
>
Address Records
>
EVERGREEN WAY
>
9929
>
HORIZON BANK
>
9929 EVERGREEN WAY HORIZON BANK 2018-01-01 MF Import
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/30/2018 3:35:24 PM
Creation date
10/30/2018 3:33:20 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
9929
Tenant Name
HORIZON BANK
Imported From Microfiche
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
234
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pervious Time of Concentration: <br />Assumed minimum 3.00 min <br />Total Pervious Time of Concentration 3.00 min. <br />Impervious Time of Concentration <br />68 If sheetflow, asphalt, S=1.10% 1.62 min. <br />495 If channel, pipes, S=0.50% 2.78 min <br />Total Impervious Time of Concentration = 4.40 min. <br />The developed storm water runoff rates can be found in Table 3— Developed Storm <br />Water Flows, and the Stormshed calculations can be found in Appendix A— Basin <br />Summaries. The * 6-month and * 100 year flow rates reflect the flows which will be <br />collected from the paved areas and routed to the treatment system, see "TreatmenY' <br />basin in the Stormshed calculations. The 2, 10 and 100 year rates reflect the overall <br />flows from the entire site. <br />Table 3. Developed Storm Water Flows <br />Water Qualitv: <br />During the construction phase of the project, temporary siltation control structures will <br />be installed. At a minimum: <br />• A silt fence will be installed if required to prevent silt laden runoff from leaving <br />the site. The likely location will be along 100TH Street. <br />• Exist;ng catch basins will be protected by catch basin inserts as shown on the <br />construction plans. <br />• A temporary construction entrance will be installed per the TESC plan and <br />ci?y standard detail 205A. <br />• A construction staging area will be utilized for equipment/material storage and <br />equipment maintenance during construction. <br />�'J <br />M:1Sdg�2004�259-SDG-04 - FSI - Horizon Bank in EverettlDRAIN1Drainage Analysis-259.doc <br />� <br />
The URL can be used to link to this page
Your browser does not support the video tag.